Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction
Section 662 — CONCRETE SHOULDER CURB
Illinois Standard Specifications for Road and Bridge Construction, Section 662. Full text, cross-references and related pay items on BuildSpec.
Concrete Shoulder Curb Art. 662.04 575 661.03 General. The temperature of the base on which the curb is placed shall not be less than 40 °F (4 °C) at the time the curb is placed. Prior to placing the curb, the base shall be cleaned and then primed with bituminous material at a rate of 0.05 to 0.1 gal/sq yd (0.2 to 0.5 L/sq m). The HMA shoulder curb shall be constructed with a mechanical curb laying machine of a type approved by the Engineer. Prior to constructing the curb, additional shoulder shall be constructed according to the details shown on the plans. All exposed curb surfaces shall be…
The full text is for BuildSpec members
Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations