General Provisions (100-199)

134Payment for tree removal sizes as designated in requirement 4 of 201.06(c), which

IN · 2024 Standard SpecificationsBook pages 45View official source ↗

Payment for tree removal sizes as designated in requirement 4 of 201.06(c), which are larger than those sizes shown as pay items, will be made on the basis of the largest size shown in the Schedule of Pay Items except as set out below. 130

(d)Clearing Right-of-Way

If the Schedule of Pay Items contains a lump sum pay item for clearing right-of- way, such pay item shall include the cost of all work described in this section and all of the work performed in accordance with 202 within the construction limits except for such work set out specifically as pay items or as otherwise provided for herein. All clearing the Contractor is di rected to perform outside the construction limits, including clearing for utility relocation which is for the benefit of the Department, and not simply for the Contractor’s convenience, will be paid for in accordance with 104.03 or 109.03 unless such clearing is shown on the plans, in the Contract Information book, or is for 140 the construction of fence or right-of-way markers. Except as specified in 621, the cost of re pair or replacement of terrain, vegetation, objects designated to remain, or areas outs ide the construction limits which have been damaged by the Contractor or have subseque ntly eroded, shall be included in the cost of clearing right-of-way.

( e ) E x c l u s i o n s If the Schedule of Pay Items does not co ntain an estimated quantity or a lump sum pay item for work described herein except as set out above, such work will not be paid 150 for directly. The cost thereof shall be included in the cost of other pay items.

Source: Indiana Standard Specifications, 2024 Edition. Pages 45 of 1,248.