2113 - EROSION CONTROL MATERIALS 2100-20
2113.1 Description
This specification covers erosion control products manufactured from wood, straw or coconut fiber mat, synthetic mat, paper mat, jute mesh or other material that is placed on slopes or ditches for short-term or long-term protection of seeded areas.
2113.2 Requirements
a. Provide prequalified erosion control materials of the class and type specified in the Contract Documents. b. Erosion control products are categorized in TABLE 2113-1 and 2113-2: TABLE 2113-1: CLASS 1. “SLOPE PROTECTION Type Uses Soil Type Type C Slopes > 3:1 Clay soils Type D Slopes > 3:1 Sandy soils TABLE 2113-2: CLASS 2 FLEXIBLE CHANNEL LINER Type Duration Shear Stress t d Type E Short-term ( ≤ 5 years) up to 2 lbs/sq ft Type F Short-term ( ≤ 5 years) up to 4 lbs/sq ft Type G Long-term (> 5 years) up to 6 lbs/sq ft Type H* Long-term (> 5 years) up to 8 lbs/sq ft *Use Only 100% synthetic products c. Anchors. Provide and use anchors as recommended by the erosion control product manufacturer. In the absence of any recommendations by the manufacturer, provide material in TABLE 2113-3: TABLE 2113-3: WIRE, STAPLE AND ANCHORS Property minimum size Slope Protection Wire Diameter 11 gauge Leg Length (Heavy Soil) 6 inch Leg Length (Light Soil) 8 inch Crown Width 1 inch Flexible Channel Liner - Wire Staple Anchors Wire Diameter 8 gauge Leg Length (Heavy Soil) 10 inch Leg Length (Light Soil) 14 inch Crown Width 2 inch Flexible Channel Liner - Metal Stake Pin Anchors Pin Diameter 3/16 inch Pin Length (Heavy Soil) 10 inch Pin Length (Light Soil) 14 inch Steel Washer Diameter 1½ inch, nominal Flexible Channel Liner - Hardwood Stake Anchors Light Soil 1 x 3 x 12 inch Heavy Soil 1 x 3 x 18 inch 2113 - EROSION CONTROL MATERIALS 2100-21
2113.3 Test Methods
Erosion Control products will be tested and evaluate d by the Texas Department of Transportation and the Texas Transportation Institute following procedures outlined in the Texas DOT Erosion Control Report. Anchors are evaluated on the basis of their performance in the field.
2113.4 Prequalification
Prequalification procedures may be obtained by writing to the Texas Department of Transportation, Director of Construction and Maintenance, 125 East 11 th Street, Austin, TX 78701-2483. A list of prequalified materials based on the annual Texas DOT Erosion Control Report and field pe rformance within Kansas will be maintained by the KDOT Bureau of Construction and Materials. The KDOT prequalified list establishes the acceptable materials to be incorporated into KDOT projects. Products will remain on the KDOT list provided field performance is satisfactory or the manufacturer requests the removal of their own product.
2113.5 Basis of Acceptance
a. Erosion Control Materials.
Erosion Control Materials in other states
Get an email when 2113 changes
Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.