906 - TOPSOIL 900-17

906.1 Description

Provide and place topsoil at the locati ons shown in the Contract Documents. BID ITEM UNITS T o p s o i l C u b i c Y a r d

906.2 Materials

Provide topsoil that complies with DIVISION 2100. The Contractor-furnished site (for excavation of th e topsoil) is subject to the environmental clearance provisions noted in SECTION 107.

906.3 Construction Requirements

Before excavating topsoil from the Contractor-furnished site, remove all grass, weeds, brush, stumps and other objectionable material from the site. Spread the topsoil at the locations and to the depths shown in the Contract Documents. Do not harm existing plants or structures when placing and spreading the topsoil. Do not spill the topsoil on the roadway. Do not handle or spread topsoil when it is wet enough to form a 1 ½ inch soil ball without easily breaking. Use only pulverized topsoil where 3 in ches or less of topsoil is required. After the topsoil is spread over the designated areas, remove any stones, roots, large clods (greater than 6 inches) and other objectionable material.

906.4 Measurement and Payment

a. Contract Quantities. The Engineer will use the contract quantities for payment, provided the project is constructed essentially to the lines and grades shown in the Contract Documents. If the Contract Documents are altered, or if the E ngineer or Contractor ques tions the accuracy of the contract quantities for topsoil, either party may request measurement of the quantities involved, when excavated, or after placed. b. Measured Quantities. The Engineer will measure (by cross-sectioning) topsoil by the cubic yard. The Engineer will compute the quan tities by the average end area method. Wher e it is impractical to measure material by the cross-section method, the Engineer may use three-dimensional measurements. c. Payment. Payment for "Topsoil" at the contract unit price is full compensation for the specified work.

Get an email when 906 changes

Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for State Road and Bridge Construction, 2015 Edition. Pages 646–646 of 978. View official source ↗

Ask about this section

Scoped to Kansas KDOT Standard Specifications for Road & Bridge Construction, Section 906 — Topsoil. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.