650TOPSOIL

AL · 2022 Standard Specifications✓ Full text on BuildSpecBook pages 546–0 Save this section

Ask about Section 650

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

543

and any other deformations. Anomalies shall not exceed 2% of the nominal pipe diameter or excessive ovality greater than 5% of the nominal pipe diameter.

649.04Method of Measurement

Encasement pipe will be measured by the linear foot {meter}.

649.05Basis of Payment

(a)Unit Price Coverage.

The encasement pipe will be paid for at the contract unit price bid for the type of installation required. The unit price bid shall be compensation in full for furnishing and installing the pipe, all excavation and backfill, vent pipes, spacers, end treatments, disposal of excess material and all labor, material, tools, equipment and incidentals necessary to complete the work.

(b)Payment will be made under Item No.:

649-A ___ inch {mm} * Encasement Pipe, Type ** Installation - per linear foot {meter} * Show Type: Steel; High Density Polyethylene(HDPE);etc. ** Show Type: 1, 2 or 3 TOPSOIL

650.01Description

This Section shall cover the work of furnishing and placing topsoil and the placement of State furnished topsoil from stockpiles.

650.02Materials

(a)Required Properties of Topsoil.

Topsoil furnished or stockpiled by the Contractor shall meet the requirements given in ASTM D 5268 "Standard Specification for Topsoil for Landscape Purposes". The composition of the topsoil shall be as follows (from ASTM D 5268):

REQUIRED PROPERTIES OF TOPSOIL Deleterious Materials (rock, gravel, slag, cinder, roots, sod) in the Total Sample 7 % maximum by weight {mass} Organic Material in Portion of Sample Passing the No. 10 {2 mm} Sieve 2 % to 20 % by weight {mass} Sand Content in Portion of Sample Passing the No. 10 {2 mm} Sieve 10 % to 90 % by weight {mass} Silt and Clay Content in Portion of Sample Passing the No. 10 {2 mm} Sieve 10 % to 90 % by weight {mass} pH 5 to 7

Topsoil will be sampled at the source and tested prior to application by the Engineer in accordance with ASTM D 5268 for compliance with these requirements.

(b)Sources of Topsoil.
1.Topsoil Furnished by Contractor.

Topsoil furnished by the Contractor shall be taken from areas outside of the Right of Way. The areas where topsoil is removed shall be developed, maintained and restored in accordance with the requirements given in Subarticle 106.01(b).

2.Topsoil Furnished by the State from Stockpiles.

The Contractor shall use topsoil from stockpiles that were created in accordance with the requirements given in Subarticle 210.03(b). GROUND PREPARATION, VEGETATION ESTABLISHMENT AND MOWING 544

650.03Construction Requirements

(a)Preparation for Topsoil Placement.

The Contractor shall not place topsoil from any source (Contractor furnished or State furnished) until the Engineer has been given the opportunity to sample, test and evaluate the source for compliance. The grading and shaping of the area where topsoil must be placed shall be completed prior to the placement of the topsoil unless directed otherwise by the Engineer.

(b)Application of Topsoil.

Topsoil shall be applied to the depth shown on the plans or as directed by the Engineer. Applied topsoil shall be compacted by tracking. Tracking shall be accomplished by the operation of a tracked vehicle leaving ridges perpendicular to the direction flow of water down the slope. The topsoil shall then be prepared in accordance with the requirements given in 652.03. Ground preparation and vegetation establishment operations shall commence as soon as possible after the application of topsoil per 210.03(a)to reduce the potential for the erosion of the topsoil.

(c)Portions of Stockpiles that remain after Removal of Topsoil.

Portions of stockpiles that remain after the removal of topsoil shall be reshaped as directed by the Engineer. Any additional temporary or permanent seeding, mulching and other erosion control measures that are required will be paid for under the appropriate items of work.

650.04Method of Measurement

(a)Topsoil, Item 650-A.

This item covers topsoil material furnished by the Contractor. Topsoil furnished by the Contractor will be measured in cubic yards {cubic meters} by loose measure in the delivery vehicle at the point of delivery.

(b)Topsoil from Stockpiles, Item 650-B.

This item covers topsoil made available to the Contractor in State furnished stockpiles on the Right of Way. This topsoil will be measured in cubic yards {cubic meters} by the cross section and average end areas method at the stockpile.

650.05Basis of Payment

(a)Unit Price Coverage.

Topsoil will be paid for at the contract unit price per cubic yard {cubic meter}, which shall be full payment for furnishing the topsoil, ground preparation handling, hauling, spreading, shaping, harrowing, disking, compaction, disposal of unacceptable material, and for furnishing all equipment, tools, labor and incidentals necessary to complete the work. Topsoil from Stockpiles will be paid for at the contract unit price per cubic yard {cubic meter}, which shall be full payment for ground preparation, cleaning and removing debris from the topsoil, handling, hauling, spreading, shaping, harrowing, disking, compaction, and for furnishing all equipment, tools, labor and incidentals necessary to complete the work.

(b)Payment will be made under Item No.:

650-A Topsoil - per cubic yard {cubic meter} 650-B Topsoil from Stockpiles - per cubic yard {cubic meter} GROUND PREPARATION, VEGETATION ESTABLISHMENT AND MOWING

652.01Description

This Section shall cover ground preparation work and the work of establishing an acceptable permanent stand of vegetation of the species designated for establishment. This section also covers mowing of vegetated areas.

652.02Materials

Materials (seed mixes, mulch, fertilizer, etc.) shall be furnished in compliance with the requirements given in Section 860. GROUND PREPARATION, VEGETATION ESTABLISHMENT AND MOWING 545

652.03Construction Requirements

(a)Construction Sequence.

The required sequence and timing of the placement of permanent seeding during excavation and embankment construction is given in Subarticle 210.03(a). The Engineer may direct, even to the exclusion of other operations, that the Contractor promptly complete grading and ground preparation to allow the establishment of permanent vegetation in areas where it is necessary for the control of erosion and sediment.

(b)Seed Mixes for the Establishment of Permanent Vegetation.

The appropriate seed mix shall be chosen from tables in Section 860. The appropriate seed mix is based on planting zone, planting date, and type of area to be seeded. Seed mixes of a temporary nature are required in some areas of the State when permanent seed mixes are out of season. These mixes are shown in Section 860 as requiring seeding in stubble for the establishment of the required permanent plant.

(c)Inspection.

The Contractor shall notify the Project Manager at least 48 hours in advance of any work related to seeding. This includes the mixing of seed as well as the sowing of seed. The Contractor shall notify the Engineer of the proposed type of seed mix or mixes to be incorporated into the project prior to beginning seeding operations. Seeding work shall not begin prior to the measurement of the area to be seeded. All work shall be performed in the presence of the Engineer.

(d)Preparation and Planting in Soft Soil.
1.Ground Preparation.

After grading and topsoil placement and prior to ground preparation, the Contractor shall remove all boulders, stumps, roots, or other objects with any dimension larger than 2 inches {50 mm}. Topsoil shall meet the requirements given in Section 650. Ground preparation shall consist of cultivating the topsoil to a loose depth of at least 4 inches {100 mm} except on slopes 2:1 or steeper. The plowing, harrowing, cultivating, and all other operations shall be performed with proper equipment and in such a manner as to break up all clods. The ground shall be plowed to the required depth and then cultivated with a rotary tiller or disk harrow, in crossing directions if necessary, until the result is a smooth, uniform, loose, and well broken soil providing a suitable bed for seed. In small or inaccessible areas the use of hand tools will be permitted. The Contractor shall add water as necessary to provide sufficient soil moisture to prepare the ground. All trash and other debris shall be removed from the cultivated topsoil. All pieces of wood, rocks and unbroken clumps of earth with any dimension larger than 2 inches {50 mm} shall be removed from the planting area.

2.Initial Soil Amendments.

The initial fertilization shall be a commercial fertilizer that will provide at least 120 pounds {135 kg} of N, 120 pounds {135 kg} of P 2O5, and 120 pounds {135 kg} of K 2O per acre {hectare}, as computed from the nominal contents of fertilizer elements. Only one half of this rate shall be applied when the required seeding is Annual Ryegrass. Agricultural limestone (lime) shall be applied prior to seeding at a rate of two tons per acre {4.5 metric tons per hectare}. Lime may be applied in dry, pelletized or slurry form. The rate of application is required regardless of the form of application. The required rates of placement of fertilizer and lime may increase as directed by the Engineer based on the results of the testing of the Topsoil from Stockpiles as described in Article 650.02. Additional fertilizer and lime for Topsoil from Stockpiles will be paid for separately in accordance with the requirements given in Article 652.05. Reductions in rates will result in a price adjustment for seeding. Fertilizers and agricultural limestone (lime) shall be applied uniformly at the required rates of placement. The fertilizer shall be well pulverized and free of lumps when applied. In no case shall fertilizer that is not mixed with soil be permitted to be in direct contact with seed. When fertilizers are applied hydraulically they shall be diluted sufficiently so that no damage is done to either seed or established vegetation. Agricultural limestone, basic slag or a combination of limestone and slag shall be applied separately but may be incorporated into the soil with fertilizers in one operation. GROUND PREPARATION, VEGETATION ESTABLISHMENT AND MOWING 546

Fertilizerand agricultural limestone that is not applied hydraulically shall be uniformly mixed with the soil by harrows, rotary tillers, or other soil mixing equipment prior to subsequent operations. Mixing with the soil will not be required when the fertilizerand agricultural limestone is applied hydraulically.

3.Sowing Seed.

Mechanical or hydraulic seeders shall be used for sowing unless approved otherwise by the Engineer. Sowing shall not be performed during windy weather, when the prepared surface is crusted, or when the ground is frozen, wet or otherwise in a non-tillable condition. The addition of water may be required to render excessively dry soils tillable. Equipment for applying seed hydraulically shall be designed for this purpose. The equipment shall be capable of mixing and pumping the water, seed mixture, mulch and fertilizer uniformly over the area to be seeded. Power driven agitators shall be provided to keep the mixture uniform during the application.

4.Covering Seed.

Care shall be exercised during covering operations to preserve the line, grade and cross-section of the seeded areas so that areas adjacent to pavement, walks, etc., are not left higher than the paved surface. The seed bed shall be compacted immediately after sowing. Compaction shall be done with a cultipacker, light roller or approved drag. The weight {mass} of the roller or drag needed shall be determined by the Contractor according to the type and physical condition of the soil. Rolling or covering of seed may be omitted when both seeding and mulching are hydraulically applied.

5.Mulching.

Mulching shall be applied in accordance with the requirements given in Section 656. Seeded areas shall be covered with mulch within 48 hours after seeding. Mulching will be measured and paid for separately under Section 656.

6.Soil Amendments After Growth.

After the required plant species have emerged and shown normal growth (usually approximately 40 days) and while the soil surface is moist, a second application of fertilizer shall be made. This second application shall be placed as a uniformly applied top dressing of 40 pounds {45kg} each of N, P 2O5, and K 2O per acre {hectare}, respectively or equivalent approved by the Engineer. This application of fertilizer will not be required for temporary planting (Annual Ryegrass).

(e)Preparation and Planting in Rocky or Hardpan Areas.
1.Conditions for Planting in Rocky Areas.

The requirements for planting in rocky or hardpan areas shall apply when the Engineer determines that the area is too rocky or compacted for plowing, disking, and harrowing, but is sufficiently soft or shaley to permit some form of treatment

2.Initial Soil Amendments.

One half of the fertilizer and all of the lime required for the initial fertilization of soft soil shall be applied before the initial scarification.

3.Initial Scarification.

The fertilizer and lime shall be worked into the rocky or hardpan area by an initial scarification as directed by the Engineer.

4.Coverage with Topsoil.

Approximately 4 inches {100 mm} of topsoil shall be placed over the scarified and fertilized rocky or hardpan area.

5.Soil Amendments after Placement of Topsoil.

The second half of the fertilizer required for the initial fertilization of soft soil shall be applied after the placement of the topsoil.

6.Sowing, Covering, Mulching and Fertilizing after Growth.

The sowing of the seeds, covering of the seeds, mulching, and fertilization after growth of the seeds shall be in accordance with the requirements given for this work in soft soil. GROUND PREPARATION, VEGETATION ESTABLISHMENT AND MOWING 547

(f)Preparation and Planting on Steep Slopes (2H:1V or Steeper).
1.Ground Preparation.

Planting operations may proceed without further ground preparation after topsoil spreading and tracking if the planting can be accomplished within 72 hours after the tracking operations. Tracking is the mechanical roughening of the slope surface. Tracking shall be accomplished by the movement upslope and downslope (not along the slope) of heavy equipment that operates on tracks.

2.Initial Soil Amendments.

One half of the fertilizer and all of the lime required for the initial fertilization of soft soil shall be applied hydraulically.

3.Sowing.

The sowing of seeds shall be in accordance with the requirements given for this work in soft soil with the exception that hydraulic seed application is required.

4.Mulching.

Mulching shall be applied in accordance with the requirements given in Section 656. Seeded areas shall be covered with mulch within 48 hours after seeding. Mulching will be measured and paid for separately in accordance with the requirements given in Section 656.

5.Second Application of Fertilizer after Mulching.

Half of the fertilizer required for the initial fertilization of soft soil shall be applied hydraulically approximately 40 calendar days after mulching.

6.Third Application of Fertilizer.

A third application of fertilizer shall be made approximately 40 calendar days after the second application of fertilizer. This application shall be placed hydraulically as a uniformly applied top dressing of 500 pounds {560 kg} of 8-8-8 fertilizer per acre {hectare} or equivalent approved by the Engineer.

(g)Seeding in Stubble.

The seeding in stubble method of planting shall be used to establish permanent species when initial vegetation establishment occurs during a season that is not optimal for the permanent planting. Dates for seeding in stubble are designated in the seed mix tables in Section 860. This method requires that the existing vegetation be mowed to a height of approximately 3 inches {75 mm} or sprayed with an approved herbicide, or both, to retard further growth. The area shall then be lightly scarified by disking or other approved method to prepare a suitable seedbed. The initial fertilization, sowing of the seeds, covering of the seeds, and fertilization after growth of the seeds shall be in accordance with the requirements given for this work in soft soil. Additional agricultural lime application will not be required for seeding in stubble. Mulch may be applied to bare areas if requested by the Contractor and approved by the Engineer. Mulch shall be furnished and paid for in accordance with the requirements given in Section 656.

(h)Establishment and Acceptance.

All work shall be conducted in accordance with the requirements given in Section 665 as well as the requirements given in this Section. The Contractor shall provide plant establishment of the required species of permanent vegetation prior to final acceptance of the project. Plant establishment shall consist of preserving, protecting, reseeding, or replanting and other such work and at such time as may be necessary to keep the vegetated areas in a satisfactory condition.All of the above work shall be performed without additional compensation, unless otherwise specified. The acceptance of designated seeded areas will be based upon verification of a satisfactory stand of vegetative cover in the season for each species required for establishment. If a satisfactory stand of desired vegetation is not established, the area shall be re-seeded after appropriate soil preparation and re-established without additional cost to the Department. A satisfactory stand of vegetative cover shall be defined as a cover of living plants, after true leaves are formed, of the required seed species designated for establishment. Generally an 85 % coverage will be considered acceptable. Should the Contractor protest the determination of satisfactory stand based on visual analysis, a random sampling of 5 samples per acre {0.4 ha} using a square yard {meter} template may be executed to determine the percent coverage. There should be no areas void of the required species larger than 4 square feet {0.4 square meter}. Payment for seeding, fertilizer, and agricultural limestone and mulch will be made in full upon satisfactory application. GROUND PREPARATION, VEGETATION ESTABLISHMENT AND MOWING 548

Payment for additional fertilizer and agricultural limestone will be made in accordance with the requirements given in Article 652.05. Payment for seeding may be withdrawn for areas where vegetative cover is not established or not satisfactorily maintained and fertilized after establishment. Every effort should be made to establish vegetation of permanent species in accordance with the seasonal requirements shown for each species in Section 860. Areas where the season and required seed mix causethe method of seeding in stubble to be necessary for the establishment of a permanent plant will not be considered acceptable until vegetation of a permanent species is satisfactorily established. The project will not be accepted for maintenance prior to acceptable establishment of vegetation after seeding in stubble. Payment will not be made for areas of unsatisfactory stands of vegetative cover, the repair of areas damaged by the Contractor, or for the repair of washes in areas where sufficient erosion control measures are available to the Contractor. Requests from the Contractor for payment for areas of unsatisfactory stands of vegetative cover will not be considered by the Construction Engineer without the submittal of documentation of absolute adherence to the requirements for the application of topsoil and for the establishment of the vegetation.

(i)Mowing.

The Contractor shall mow all seeded areas of medians, shoulders and front slopes as directed or permitted by the Engineer. The Contractor shall mow when the vegetation becomes a hazard to motorists and as necessary to promote growth of the required permanent plant. Mowing shall be performed in a manner that will not cause unnecessary damage to desirable vegetation. Mowing of lespedezas and tall fescue shall not be done until after these plants have produced mature seed. Mowing shall generally be done twice each year as directed or permitted by the Engineer and when vegetation has grown to a height of 16 inches. If the project is being considered for acceptance for maintenance by the Department and has been mowed within the last 2 months, additional mowing will not be required. The Contractor shall mow, cut and trim as close as practicable to all fixed objects, exercising extreme care not to damage trees, plants, shrubs, delineators and other appurtenances. Damage to trees, plants, shrubs, delineators or other appurtenances shall be repaired or replaced immediately by the Contractor at no cost to the Department. The Engineer will determine if the damage must be corrected by repair or replacement.

652.04Method of Measurement

(a)Seeding.

Seeding will be measured in acres {hectares} parallel to the seeded surface regardless of the method of establishment.

(b)Mowing.

Mowing will be measured in acres {hectares} parallel to the mowed surface. Each separate mowing of the same location will be measured separately.

652.05Basis of Payment

(a)Unit Price Coverage.

Seeding will be paid for at the contract unit price per acre {hectare} which shall be full compensation for all ground preparation, furnishing, preparing, soil amendments (fertilizer and lime), seeds, including water needed in mixing, planting, establishing, and maintaining of the seeded areas until final acceptance, and for all materials, equipment, tools, labor, and incidentals necessary to complete the work. Additional fertilizer or agricultural limestone ordered by the Engineer will be paid at the verified invoice price plus 15 percent. The seeding item will be used for payment for establishing vegetation regardless of the methods used for planting and establishment. Vegetation established outside of the normal planting season (annual ryegrass) will be paid for at the contract price for seeding. Vegetation established by seeding in stubble will also be paid for at the contract unit price for seeding. All mowing, cutting and trimming, including mowing required for seeding in stubble will be paid for at the contract unit price bid per acre {hectare} which shall be payment in full for the mowing including equipment, labor, and incidentals necessary to complete this item of work. The contract unit price shall also be for mowing required when the vegetation becomes a hazard to motorists and as necessary to promote growth of the required permanent vegetation.

Get an email when 650 changes

Alabama revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Alabama Standard Specifications for Highway Construction, 2022 Edition. Pages 546–0 of 934. View official source ↗