649ENCASEMENT PIPE FOR UTILITIES

AL · 2022 Standard SpecificationsBook pages 544545View official source ↗

649.03 Construction Requirements.

6.Hot Tap . A hot tap shall be paid for at the contract unit price which shall be payment for all labor, materials, equipment and incidentals necessary to furnish and install one hot tap incl uding tapping valve.
7.Valve with Box Reset Valve with box reset will be paid for at the respective contract price which shall include all labor, materials, equipment and incidentals necessary to furnish and install the valve and to reset the box complet e in place.
8.Gas Valve Box Reset Valve box reset will be paid for at the respective contract price which shall include all labor, materials, equipment and incidentals necessary to reset the box complete in place.
9.Line Stoppers . Line Stoppers shall be paid for at the contract unit price for each line stopper complete in place, which shall be payment for furnishing and installation of the line stopper including all materials, tools, labor, equipment, excavation, backfilling and incidentals necessary to c omplete the work.
b.Payment shall be made under Item No. : 646-A ___ inch {mm} * Gas ** Laid - per linear foot {meter} 646-B ___ inch {mm} * Gas ** Relaid - per linear foot {meter} 646-C ___ inch * Fittings – per each 646-D ___ inc h {mm} * Valve with Box – per each 646-E ___ inch {mm} x ____ inch{mm} * Hot Tap – per each 646-G ___ inch {mm} Steel Line Stoppers – per each 646-H ___ inch {mm} __*__ Valve with Box Reset - per each 646-J Gas _***_ – per each * Show Type: Steel; Polyethylene ** Designate One Type: Main or Service Line . *** Valve Box Reset, etc. ENCASEMENT PIPE FOR UTILITIES

649.01 Description.

This Section shall include the work of furnishing and installing an encasement pipe for a utility carrier pipe. An encasement pipe may be utilized as a carrier pipe as noted in this Section and when shown on the plans or directed by the Engineer. The type of installation will be based on the location of the encasement pipe. The three types of installation are designated as follows: Type 1 - Open cut. Type 2 - Jack and bore, or tunneling. Type 3 - Directional drilling. The Contractor may substitute the Type 2 or Type 3 installation for the Type 1 installation if the substitution is done without extra compensation. Type 2 and Type 3 installations are intended for use under existing facilities and where traffic is not to be disturbed.

649.02 Materials.

Materials furnished for use shall conform to the requirements of Section 862, Utility Encasement Pipe and other appropriate sections of these Specifications. The size and depth of pipe shall be as shown on the project plans or as described in the project proposal.

649.03 Construction Requirements.

a.General . Type 1 – encasement pipe installed by open trench method complying with requirements for installation and backfill given in Section 645.

649.03 Construction Requirements.

Type 2 – encasement pipe installed by an approved jack and bore or tunneling procedure. Type 3 – encasement pipe installed by directional drilling. The encasement pipe shall be laid to the line and grade shown on the project plans. All pipe and other materials shall be new and unused when delivered and shall be suitable for installation and operation under the condition for whi ch they are intended. Any material that has mixed with or coated with dirt or foreign substances or damaged during its delivery or handling shall not be used. Encasement pipe for a gas carrier pipe shall have two vent pipes installed to allow for release o f gas in the event of a leak. The vents shall be installed within 1 foot {0.3 m} of the end of the encasement pipe. The vent located on the low end of the encasement shall be installed on the underside of the encasement and the vent located at the high end of the encasement shall be installed on the top of the encasement. The vent pipe shall slope upwards away from the encasement. The vent pipe shall be above ground unless otherwise noted on the project plans.

b.Open Cut Method . The procedure for excavating and backfilling by the open cut method shall be as prescribed in Section 645.
c.Jack and Bore, or Tunneling Method .
1.General . The Contractor shall submit the procedure proposed for the Type 2 installation (jack and bore, or tunneling) to the Engineer at least 7 calendar days prior to the beginning of the installation. The Engineer will not approve the submittal but will review it for completeness. Work shall not begin until the Engineer informs the Contractor that the submittal is complete. The submittal shall contain a list of all equipment proposed for use and a description of the procedure proposed for installation. The encase ment pipe shall be installed simultaneously with the boring action. The results of this procedure shall produce a neatly installed encasement pipe without damage to the existing facility (roadbed, slopes, etc.) and without excessive voids in the earth surrounding the encasement pipe. If there are indications that voids exist around the encasement, the Engineer will order the Contractor to pump a concrete grout under pressure to seal the voids. Any damage to the facility caused by the installation operation shall be restored by the Contractor to the satisfaction of the Engineer without cost to the Department or Utility.
2.Seating of Carrier Pipe . Encasement pipe spacers shall be used to maintain separation of the encasement pipe and the carrier pipe to ensur e stability of the carrier pipe. Spacers shall be either stainless steel or non - metallic as approved by the Engineer and shall be installed in accordance with the manufacturer’s recommendations.
3.End Treatment of Encasement Pipes . End seals shall be mech anically attached to the ends of the encasement pipe and to the carrier pipe to prevent the entrance of dirt and water into the encasement pipe.
d.Directional Drill Method . High density polyethylene (HDPE) pipe installed by the directional drilling m ethod shall be as specified in Section 862. The HDPE pipe shall meet the requirements for the depth of embedment and loading. Steel encasement pipe installed by directional drilling shall meet the requirements given in Section 862. Steel encasement pipe f or gas that is installed by directional drilling as a carrier pipe shall meet the requirements for gas pipe given in Section 861. The Contractor shall submit to the Engineer the details of the procedure and equipment proposed for the directional drilling a t least 7 calendar days prior to beginning the drilling. The directional drilling procedure shall produce a neatly installed carrier pipe without damage to the existing facility (roadbed, slopes, etc.) and without excessive voids in the earth surrounding the pipe. If there are indications that voids exist around the pipe, the Engineer will order the Contractor to pump under pressure a concrete grout to seal the voids. Any damage to the facility caused by the installation operation shall be restored by the Contractor to the satisfaction of the Engineer without cost to the Department or Utility.

650.02 Materials.

Installation of the pipe shall meet the requirements of ASTM F 714. Joining of the HDPE pipe shall be performed by thermal butt -fusion in accordance with the pipe ma nufacturer’s recommendations. The piping shall be assembled in a manner that does not obstruct adjacent roadways or public activities. The pipe installed by the directional drill method shall be to the alignment and grade shown on the project plans. The Co ntractor shall provide a record drawing showing the constructed horizontal and vertical alignment shown for intervals not exceeding 30 feet {9.0 m}. The Contractor shall perform the construction in a manner so that the drilling fluids and cuttings are cont ained and not released into waterways or their tributaries. The Contractor shall handle the HDPE and steel pipe in a manner that will not over stress the pipe at any time before, during, and after construction. A sizing pig shall be used to determine the presence of buckles, dents, out of roundness, and any other deformations. Anomalies shall not exceed 2% of the nominal pipe diameter or excessive ovality greater than 5% of the nominal pipe diameter.

649.04 Method of Measurement.

Encasement pipe will be mea sured by the linear foot {meter}.

649.05 Basis of Payment.

a.Unit Price Coverage . The encasement pipe will be paid for at the contract unit price bid for the type of installation required. The unit price bid shall be compensation in full for furnishing and installing the pipe, all excavation and backfill, vent pipes, spacers, end treatments, disposal of excess material and all labor, material, tools, equipment and incidentals necessary to complete the work.
b.Payment will be made under Item No .: 649-A ___ inch {mm} * Encasement Pipe, Type ** Installation - per linear foot {meter} * Show Type: Steel; High Density Polyethylene(HDPE);etc. ** Show Type: 1, 2 or 3 SECTION 650 TOPSOIL

650.01 Description.

This Section shall cover the work of furnishing and placing topsoil and the placement of State furnished topsoil from stockpiles.

650.02 Materials.

a.Required Properties of Topsoil . Topsoil furnished or stockpiled by the Contractor shall meet the requirements given in ASTM D 5268 "Standard Specification for Topsoil for Landscape Purposes". The composition of the topsoil shall be as follows (from ASTM D 5268): REQUIRED PROPERTIES OF TOPSOIL Deleterious Materials (rock, gravel, slag, cinder, roots, sod) in the Total Sample 7 % maximum by weight {mass} Organic Material in Portion of Sample Passing the No. 10 {2 mm} Sieve 2 % to 20 % by weight {mass} Sand Content in Portion of Sample Passing the No. 10 {2 mm} Sieve 10 % to 90 % by weight {mass} Silt and Clay Content in Portion of Sample Passing the No. 10 {2 mm} Sieve 10 % to 90 % by weight {mass} pH 5 to 7 Topsoil will be sampled at the source and tested prior to application by the Engineer in accordance with ASTM D 5268 for compliance with these requirements.
Source: Alabama Standard Specifications for Highway Construction, 2022 Edition. Pages 544545 of 934.