2130Application of Water for Dust Control

MN · 2025 Standard Specifications✓ Full text on BuildSpecBook pages 177–0 Save this section

Ask about Section 2130

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

2130.1DESCRIPTION

This Work consists of providing and applying Water to control dust created by the traveling public within the Project as directed by the Engineer.

2130.2MATERIALS

Provide reasonably clean Water.

2130.3CONSTRUCTION REQUIREMENTS

Use a Water supply and Equipment capable of applying the quantity of Water required to abate dust and avoid unwarranted loss of Water through evaporation, absorption, or drainage. Apply the Water at the time and in the quantity approved by the Engineer.

2130.4METHOD OF MEASUREMENT

The Engineer will measure Water for payment by volume. The Engineer may deduct payment for Water wasted if the Contractor fails to coordinate the Water application with other operations as directed by the Engineer.

2130.5BASIS OF PAYMENT

The Contract Unit Price for Water includes the cost of providing, transporting, and applying the Water as directed by the Engineer. The Department will only pay for Water applied for dust control for the Project as approved by the Engineer. The Department considers the cost of Water used for the following as included in the Contract Unit Prices for the relevant Contract Pay Items:

(1)Water used for sprinkling
(2)Water used in the construction of concrete pavements
(3)Water used in the production or curing of concrete
(4)Water used to maintain plant life
(5)Water used in compacting soil and Aggregate
(6)Water used for dust control on Contractor-selected haul Roads, Detours, or Work sites

outside of the Project

(7)Water applied for dust control or pavement cleaning caused by the Contractor’s

Equipment and operations, including abatement of nuisance dust for adjacent landowners and dust conditions detrimental to the safety of the traveling publ ic, as directed by the Engineer The Department will pay for Water applied to Aggregate surfaces for dust control caused by the traveling public on portions of the Project open to traffic as directed or approved by the Engineer at a Unit Price of $20 per 1,000 gallons (M gallon) in the absence of the Contract Pay Item 2130.523. The Department will pay for application of Water for dust control on the basis of the following schedule: Item No. Item Unit

2130.523 Water M gallon

Get an email when 2130 changes

Minnesota revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Minnesota Standard Specifications for Construction, 2025 Edition. Pages 177–0 of 1,081. View official source ↗

Ask about this section

Scoped to Minnesota 2025 Standard Specifications for Construction, Section 2130 — Application of Water for Dust Control. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.