3910.1SCOPE
Provide rock salt for use as a deicer for Road construction and maintenance purposes.
3910.2REQUIREMENTS
Provide rock salt meeting the following requirements at the time of delivery:
3910.3SAMPLING AND TESTING
The Engineer may sample and inspect the rock salt at the supplier’s unloading and storage facilities or at the point of delivery. The Engineer, in conjunction with the Materials Engineer, will perform the following:
Chloride, as modified by the Laboratory Manual
of Fine and Coarse Aggregates, for Sieve analysis of fine and coarse Aggregate, as modified by the Laboratory Manual
requirements of the Rapid Test Method for Sodium Chloride by Silver Nitrate Potentiometric Titration or the Reference Method for Chemical Analysis of Sodium Chloride as modified by the Laboratory Manual
Get an email when 3910 changes
Minnesota revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.