Section 405 Section 405
405.03.10 Spreading and Finishing. Spreading and finishing shall be in accordance
with Subsection 401.03.10.
405.03.11 Compaction . After the mixture has been spread and surface irregularities
corrected, it shall be thoroughly and uniformly compacted to the required line, grade, cross section and density. It is recommended that compaction of SMA mixtures be completed before the mat temperature drops to 250°F.
405.04 Method of Measurement . Stone matrix asphalt will be measured by the ton in
accordance with the requ irements of Subsection 403.04 for asphalt pavements.
405.05 Basis of Payment . Stone matrix asphalt, measured as prescribed above, will be
paid for by the ton in accordance with the requirements of Subsection 403.05 for asphalt pavements.
405.05.1 Price Adjustment for Thickness Requirement. Adjustments in price for
thickness shall be in accordan ce with Subsection 403.05.1.
405.05.2 Pay Items .
Payment will be made under: 405-A: Stone Matrix Asphalt, (1) - per ton Mixture
406.01 Description . This work consists of removal of pavement materials on the
roadway and shoulders by cold milling to the designated depth and, loading, hauling, and disposal of the milled materials by the Contractor in accordan ce with the plans and specifications, or as directed by the Engi neer. The milled su rface shall provide a desirable surface free from go uges, continuous grooves, ridges, oil film, and other imperfections of workmanship and shall have a uniform appearance. This work also consists of the removal of portions of existing pavement using a cold fine milling process to a nominal depth using grade control as specified on the plans or as directed by the Engineer. It shall also include the loading, hauling, and disposal of the milled materials by the Contr actor in accordance with the pl ans and specifications. The planed surface shall provide a textured surface suitable for repairs, paving, or as a temporary riding surface, whichever is specified.
406.02 Blank .
406.03 Construction Requirements .
406.03.1 Equipment . The equipment to be used for this work shall be a self-propelled
milling machine capable of removing a minimum width of four feet. The equipment shall have sufficient power, traction, and stability to remove material and maintain an accurate grade and cross slope. The equi pment shall accurately and automatically establishing profile grades along each edge of the machine by referencing from the existing pavement with means of an approved profile averaging device with extreme contact points with surface at least 30 feet apart, or from an independent grade line and shall have an automatic system for controlling cross slope. The machine shall be equipped with an integral loading and reclaiming means to immediately remove material being cut from the surface and discharge the cu ttings into a truck or windrow, all in one operation. When fine milling is required, the milling machine shall, in addition to the above, be designed specifically for grinding surfaces to close tolerances and shall be operated at a rate recommended by the manufacturer so as to avoid tearing and gouging of the pavement surface. The fine milling machine shall be equipped with a fine milling drum of the size and shape necessary to produce an ultrafine te xture to the milled surface and meet the requirements of this specification. The bit or teeth spacing on the drum shall have a maximum spacing of six millimeters (6 mm). The equipment shall have a positive means for limiting any dust resulting from the operation from escaping into the air. Adequate back-up equipment, such as mechan ical sweepers, loaders, water truck, etc., and personnel shall be provided to ensure that all cuttings are removed immediately behind the milling machine.
406.03.2 Construction Methods . When asphalt will be required on the milled area,
milling operations shall not begin until the Contractor has an approved job-mix formula and is prepared to begin paving operations. The pavement and shoulder materials shall be removed to the depth, width, grade, and cross section shown on the plans, or as directed by the Engineer. The number of passes necessary to accomplish the work required herein and on the plans shall be determined by the Contractor. The surface of the pavement and shoulders, after milling, shall be reasonably smooth and true to the established line, grade and cross section. Areas damaged by the Contractor's operations shall be corrected and/or repaired as directed by the Engineer at no additional costs to the State. The Contractor shall take necessary action to prevent or minimize the ponding of water on the milled roadway and shoulder. Where traffic is required to be maintained adj acent to the milled area, no more than a 2¼- inch differential in grade between the milled area and the adjacent surface will be allowed, unless a positive separation in accor dance with the plans and specifications is established between the traffic and milled area. A longitudinal pavement edge that traffic is expected to move across should have an elevation difference of not more than 2¼ inches. Uneven pavement signs, as shown in the plans or contract documents, will be required if the pavement edge is more than1½ inches and less than or equal to 2¼ inches. If the pavement edge is less than or equal to 1½ inches, no uneven pavement signs will be re quired. Transverse pa vement joints shall be sufficiently tapered to allow fo r the safe movement of traffic. When traffic is required to be maintained adjacent to milled shoulders, traffic control devices shall be placed in accordance with the requirements of the detail sheet for shoulder closures, or as directed by the Engineer. It is understood that the milled shoulder shall be covered with the next required course as soon as possible but in no case later than 30 calendar days after milling.
406.03.3 Fine Milling. Unless otherwise noted or advised by the Engineer, the fine
milling operation shall be conducted using an automatic grade control device, as referenced in Subsection 406.03.1, to establish accurate grade control and cross slope. The milled surface shall be text ured, substantially free from waves or irregularities. Prior to beginning a fine milling operation, the Engineer may require the Contractor to construct a 500-foot test section. The texture and consistency of profile and cross slope of this test section will be evaluated by the Engineer to verify the above straight-edge requirement can be met. If the tolerance is exceeded in the test sectio n, the Contractor shall cease work and take corrective actions to improv e the process. Once correc tive actions are taken, the Contractor will construct another test section. This designated section shall be fine milled to conform to the same requirements as those required in the initial test section. The Contractor shall not be allowed to star t continuous fine milling until an acceptable test section is obtained. Fine milling shall produce a un iform finished surface and main tain a constant cross slope between extremities in each lane. The surface tolerance of the fine milling sha ll be checked to assure a uniform pavement texture that is true to line, grade, and cross section. Fine milled pavement surfaces are subject to visual and straightedge inspections by the Engineer at any time during the milling operati on. The final fine milled surface shall be a uniform finish on the grade and slope shown to be required on the plans. The finished surface shall also not vary more than ¼” fr om a 10-foot straighted ge placed anywhere on the surface of the milled area. The cross slope shall be checked to assure uniformity and that no depressions or slope misalignments exist when the sl ope is tested with a straight edge placed perpendicular to the center line. Dust, residue, and loose milled material shall be removed from the fine milled surface. Traffic shall not be allowed on the milled su rface nor any tack coat applied and asphalt lift placed on the milled surface until removal is complete.
406.04 Method of Measurement . Cold milling of pavement and shoulders, all depths,
will be measured by the square yard, cubic yard (LVM), or ton as indicated in the contract. Fine milling of pavement and shoulders will be measured by the square yard, cubic yard (LVM), or ton as indicated in the contract. Fine milling to repair failed areas in Open Graded Friction Courses will not be measured for payment unless authorized by the Engineer. Loading, hauling, and disposal will not be measured for separate payment.
406.05 Basis of Payment . Cold milling of pavement and shoulders, all depths,
measured as prescribed above, will be paid fo r at the contract unit price per square yard, cubic yard (LVM) or ton, as indicated, which price shall be full compensation for completing the work. Fine milling of pavement and shoulders, measured as prescribed above, will be paid for at the contract unit price per square yard, cubi c yard (LVM) or ton, as indicated, which price shall be full compensation for completing the work. When not shown as a separate pay item in the contract, the price for each item of milling shall include the cost of continuous maintena nce of traffic and protective services as required by the Department's Traffic Control Plan, including all required individual traffic control devices. Payment will be made under: 406-A: Cold Milling of Bituminous Pave ment, All Depths - per square yard, cubic yard or ton 406-B: Cold Milling of Concrete Pavement, All Depths - per square yard, cubic yard or ton 406-C: Cold Milling of Shoulders, All Types, All Depths - per square yard, cubic yard or ton 406-D: Fine Milling of Bituminous Pave ment, All Depths - per square yard, cubic yard or ton 406-E: Fine Milling of Concrete Pave ment, All Depths - per square yard, cubic yard or ton 406-F: Fine Milling of Shoulders, All Depths - per square yard, cubic yard or ton SECTION 407 - TACK COAT
407.01 Description . This work consists of preparing and treating an existing
bituminous or concrete surface with bitumi nous material in accordance with these specifications and in reasonably close confor mity with the lines shown on the plans or established by the Engineer.
407.02 Materials .
407.02.1 Bituminous Material . The materials shall co nform to the applicable
requirements of Section 702. When not sp ecified, the materials shall be one from the Department’s APL. When emulsified asphalt is used, it shall not be diluted without approval of the Engineer.