210.01 Description
This describes the equipment to be used for the contract work.
210.02 Reserved
210.03 Construction Requirements
210.03.1 General Requirements
Provide equipment in good mechanical condition having sufficient power to perform the work. Repair or replace equipment not meeting these requirements.
210.03.2 Motor Graders
Use self-propelled motor graders either tandem or all-wheel drive equipped with pneumatic tires. Equip the graders with a moldboard at least 12 feet (3.6 m) long with a cutting edge, a scarifier with nine or more teeth having minimum dimensions of 3 x 1 x 16-inch (75 x 25 x 405 mm), and power-operated controls. The motor grader manufacturer’s power rating must be at least 100 horsepower (75 kW).
210.03.3 Dozers
Use dozers of any standard type attached to a crawler tractor of at least 75 horsepower (56 kW) having power-operated controls. Furnish dozers a minimum 90 inches (2.3 m) wide. The dozer and tractor are considered a single unit.
210.03.4 Rollers
210.03.5 Watering Equipment
Furnish and operate pneumatic-tired water equipment having spray bars capable of uniformly distributing water over the surface area. The control valves must be positive closing to prevent leakage.
210.03.6 Test Trailer, Transport, and Setup
Transport State-owned test trailers from a designated location to the project site and return it to a designated location as directed. Contact the Project Manager for details concerning the transport of the trailer at least 30 calendar days prior to plant mix operations. The Contractor is responsible for all required permits. Purchase minimum $85,000 insurance for the trailer and its contents. Submit written proof of the insurance prior to moving. Verify that the Department has prepared the trailer and contents for transport. Repair or replace all contents and trailer damage occurring in transport at Contractor expense. Do not move the trailer without the Project Manager’s permission. Provide a level parking area, the required blocking, and electrical power service for the test trailer. Locate and construct the parking area a minimum 200 feet (61 m) from the plant mix dryer drum, mixing plant, and storage silo unless otherwise directed, to accommodate the 12-foot x 32- foot (3.6 m x 9.8 m) trailer. Transport, set up, and make the trailer fully operational at least 2 days before starting plant mix paving. Park, block, level, re-block, re-level and unblock the trailer as directed. Supply electrical power 24 hours a day, 7 days a week. Suspend paving work during power interruptions or periods of insufficient power to the trailer. Furnish and install a continuous 200-ampere, 220-to-230-volt, single phase, 60 hertz power supply to the trailer. The power must be independent from the hot plant operation. Have the source connected by a Montana licensed electrician using a four-wire connection.
210.03.7 Camera System
Install, maintain, remove, and repack a Department-owned solar powered, remote camera system. The Department owned system is not prohibited under 2 CFR 200.216. Additional information about the webcam may be accessed at the following link: https://www.mdt.mt.gov/other/webdata/external/contractplans/contract/resources/webcamera- info.zip Furnish a 40-foot (12 m) machine peeled wood mounting pole with a minimum diameter of 10 inches, in good condition. Furnish a ⅝-inch by 8-foot (16 mm by 2.4 m) copper clad grounding rod, 45 feet (13.7 m) of #8 AWG solid copper ground wire and clamps. Furnish cable ties or clamps for securing cables and wire to the mounting pole.
210.03.8 Non-Glare Lighting (Balloon Type Lighting)
Illuminate all work areas at night with indirect (i.e., balloon type) lights capable of producing a minimum of 10 foot-candles of non-glare lighting. Equip, at a minimum, the following pieces of equipment with non-glare lighting:
210.04 Method of Measurement
210.04.1 Equipment Use
Equipment use, when specified as a bid item, is measured by the hour for the hours performing the work and includes furnishing the equipment, including operator, servicing, repairs. Time in moving equipment from point to point on the project and for repair and servicing is not measured. Equipment used in the work but not specified as a bid item is incidental to the work.
210.04.2 Test Trailer, Transport, and Setup
Test trailer, transport, and setup is measured by the mile (km) for the actual miles (km) moved. It includes insurance, transporting, blocking, unblocking, leveling, furnishing, and installing electrical power and associated wiring, removing power and wiring, and all other necessary resources to complete the item of work. Maintenance, re-blocking and re-leveling is incidental to the work and is not paid separately. The mileage shown in the contract is an estimate only and may be adjusted by the Project Manager.
210.04.3 Camera System
Measurement will be made at 50% of one unit upon completion of the installation and 50% of one unit upon the transfer of the system back to the Project Manager. Camera service or maintenance requirements will be measured in accordance with Subsection 109.04.2. When the Contractor is directed to move a camera system to a new location, measurement will be made at 50% of one unit upon complete removal from the first installation and 50% of one unit upon completion of the installation at the new location.
210.05 Basis of Payment
Payment for the completed and accepted quantities is made under the following: Pay Item Pay Unit Install, Remove Camera System Each Dozer Hour Motor Grader Hour Test Trailer Transport/Setup Mile (km)