339 SECTION 720
720.01 Description
This work consists of furnishing and installing Alignment Monuments, Iron Pin R/W Monuments, Iron Pin Reference Monuments , and Right of Way Markers.
720.02 Equipment
Reserved.
720.03 Materials
720.04 Construction Requirements
Provide a Professional Land Surveyor (PLS) licensed in the State of North Dakota to oversee monument placement. The PLS shall record all section corner and quarter corner monuments placed, in accordance with North Dakota Century Code. Submit a copy of the recordation. A PLS is not required for the installation of right of way m arkers.
720.05 Method of Measurement
The Engineer will measure as specified in Section 109.01, “Measurement of Quantities”.
720.06 Basis of Payment
Pay Item Pay Unit Alignment Monuments Each Iron Pin R/W Monuments Each Iron Pin Reference Monuments Each Right of Way Markers Each Include cost for removals of designated monuments or markers in the price bid for other items. Include the cost of materials, installation and the Professional Land Surveyor in the price bid for “________ Monuments”. Such payment is full compensation for furnishing all materials, equipment, labor, and incidentals to complete the work as specified. Section 722 340 SECTION 722 MANHOLES, CATCH BASINS, AND INLETS
722.01 Description
This work consists of constructing and adjusting manholes, catch basins, and inlets, including the furnishing or resetting of necessary metal frames, covers or gratings, valve boxes, or other accessories to new lines and grades.
722.02 Equipme Nt
Reserved.
722.03 Materials
Item Section Concrete Class AE 802 Precast Reinforced Concrete Pipe Manholes 830.01 A or B Adjustment Rings 830.04 Frames, Tops, Covers, Fittings, and Gratings 834.02 A or B Reinforcing Steel 836.02 A Compose mortar of one part cement to two parts of sand by volume. Lime may be added not to exceed 10 percent of the cement by weight.