617.07 546 TABLE 617.06 -1 Material Conversion Fa ctor Crushed stone 3800 lb/yd3 2250 kg/m3 Crushed gravel 3900 lb/yd3 2310 kg/m3 Crushed slag [1] less than 90 lb/ft3 (1450 kg/m3) 3600 lb/yd3 2140 kg/m3 90 to 100 lb/ft3 (1450 to 1600 kg/m3) 4000 lb/yd3 2375 kg/m3 more than 100 lb/ft3 (1600 kg/m3) 4500 lb/yd3 2670 kg/m3 Recycled Portland Cement Concrete 3400 lb/yd3 2020 kg/m3 Recycled Asphalt Pavement 4000 lb/yd3 2375 kg/m3 [1] Based on average dry rodded weight of standard sizes of slag aggregates on record at the Laboratory. The conversion factors listed are the long gradation weights. These numbers are based on the dry rodded weights of No. 67, 57, or 8 gradation. The Department will determine slag weights based on weights obtained from the original source. The Department will classify salvaged or mixed materials according to the material that makes up the majority of the mixture. The moistures of the delivered material will be less than 2 percent above saturated surface dry condition or the payment will be based on the dry densities and dry weights. Furnish freight bills or certified weigh bills according to Item 109.
617.07 Basis of Payment. The Department will pay for accepted quantities at
the contract prices as follows: Item Unit Description 617 Square Yard Shoulder Preparation (Square Meter) 617 Cubic Yard Compacted Aggregate (Cubic Meter) 617 M Gallons Water (Cubic Meter) ITEM 618 RUMBLE STRI PS ON SHOULDERS
618.01 Description
618.02 Construction
618.03 Method of Measurement
618.04 Basis of Payment
618.01 Description. This work consists of grinding depressions (rumble strips)
in paved shoulders. Construct rumble strips according to the standard construction drawings. 618.02 547 618.02 Construction . Furnish equipment with a rotary cutting head that will grind the depressions to the requ ired dimensions . Equip the cutting head with a pattern of cutting tips to produce a smooth cut with approximately 0.06 inches (1.5 mm) between peaks and valleys. Ensure that the cutting head is on its own suspension system, independent from that of the pow er unit, to allow the head to align itself with the slope of the shoulder or any irregularities in the shoulder surface. Equip the cutting tool with guides or a guidance system, clearly visible to the operator, to provide for consistent alignment. Take eff ective measures to control dust during the grinding operation. Remove and dispose of all grinding materials deposited on the roadway pavement in a manner approved by the Engineer and before opening the roadway to traffic.
618.03 Method of Measurement. The Department will measure Rumble Strips
by the number of feet (meters) or mile (kilometer) as the sum of the lengths of the individual segments. The Department will measure lengths along the inside edge of the shoulder, from the center of the first depressio n in a segment to the center of the last depression in that segment. If Rumble Strips are provided on more than one shoulder, the Department will measure lengths separately for each shoulder segment and add the individual lengths together to obtain the tot al length.
618.04 Basis of Payment. The Department will not pay for repairing surface
damage and extraneous marks caused by the Contractor’s operations. The Department will pay for accepted quantities at the contract prices as follows: Item Unit Descriptio n 618 Feet (Meter), Rumble Strips, (Asphalt Concrete) 618 Mile (Kilometer) , Rumble Strips, (Asphalt Concrete) 618 Feet (Meter), Rumble Strips, (Concrete) 618 Mile (Kilometer) , Rumble Strips, (Concrete) ITEM 619 FIELD OFFICE
619.01 Description
619.02 General
619.03 Method of Measurement
619.04 Basis of Payment
619.01 Description. This work consists of providing, maintaining, and
subsequently removing a field office for the exclusive use of the Department for the duration of the Contract at a location approved by the Engineer.
619.02 General. Furnish a completely functional field office of the type
specified in the Contract by the date directed by the Engineer. Furnish each field office with a means for maintaining a room temperature between 68 and 80 F (20 and 27 C). Furnish electric service for each field office. 619.02 548 Furnish potable hot and cold water for each field office. Furnish neat, sanitary, enclosed toilet accommodations for each field office. Furnish associated lavatory and sanitary supplies. Portable facilities may be provided with the approval of the Engineer. For projects requiring moisture and density control of construction materials, provide the field office with a lockable wood or metal storage box of sufficient size to store a nuclear den sity gauge and with a working electrical connection to charge the gauge. Provide two independent lock systems: one that locks the box the gauge is stored in; and the second one that locks the box to the facility within which the box is housed. The second l ock system may consist of bolting the box to the office floor or wall. The storage box must be at least 15 feet (5 meters) from any occupied work area. For the type of field office specified, provide the items indicated in Table 619.02 -1 TABLE 619.02 -1 FIELD OFFICE Item Type A Type B Type C Minimum ceiling height, ft (m) 7 (2.1) 7 (2.1) 7 (2.1) Floor space, ft² (m²) 150 (14) 500 (46) 1000 (93) Separate enclosed room, ft² (m²) (Part of specified floor space) 0 (0) 0 (0) 100 (9) Telephone service & telephones [1] 2 2 2 Internet service connection [5] 1 1 1 Multi -Function copier that is setup for scanning, printing, faxing and copying. [2] 1, 11×17 1, 11×17 1, 11×17 Calculator with tape 1 2 3 Desk and chair set 1 3 5 Work table, 30 72-inch (750 1800 mm) 1 2 3 4-drawer, legal size, lockable metal file cabinet --- 1 2 2-drawer, metal file cabinet 1 2 2 Portable fire extinguishers [3] 1 1 2 Plan rack [4] 1 1 2 All-weather parking spaces 8 16 20 [1] For each telephone specified, provide the telephone itself, all wiring necessary to connect the phone and multi -function copier to the phone company system, and a working separate phone number for each telephone. Connect one phone to a recorded answering device. For Types B and C, provide one speakerphone. [2] Copier must meet minimum specifications provided for each field office type. Contractor responsible for paper supplies, copier supplies, and maintenance of copier. Type A: Copy/Print Speed: 20 Pages Per Minu te (Letter), 15 Pages Per Minute (Legal), 12 Pages Per Minute (Ledger) or higher Duplex printing support Automatic document feeder with 40 sheet duplexing document feeder Copier Memory: 256 MB Data Security Kit Paper Capacity - 250 sheet × 2 trays , 50-sheet Bypass tray Network Interface: 10/100Base -TX, 1000Base -TX Analog Fax Support Included with machine Color Scanning with following requirements: Up to Up to 600 × 600 dpi Scan Area up to 11" × 17" Scanning Protocol Support - TCP/IP , SMTP, SMB, FTP, POP3, NCP File Scan Types Supported: Single Page TIFF, JPEG, PDF, Multi - Page TIFF, PDF, and 619.03 549 Scanning Support for Scan -to-Email, SMB (Folder), URL, and TWAIN Network protocol support for TCP/IP Client and Server Print Driver Support for PCL Print Drivers Server Operating System Support for Windows Server 2008 and Windows Server 2008 R2 (32 Bit/64 Bit) Client Print driver support for Windows XP/Windows 7 (Both PCL/(32 Bit and 64 Bit)) Minimum print/copy resolution of 600 × 600 dpi Type B and C: Color Print/Copy/Scan Copy/Print Speed: 30 Pages Per Minute (Letter), 15 Pages Per Minute (Legal), 15 Pages Per Minute (Ledger) or higher Duplex printing support Automatic document feeder with 5 0 sheet duplexing document feeder Copier Memory: 1 GB Installed HDD: 40 GB Data encryption and HDD Erase Support included with machine Internal Stapler Support Paper Capacity - 250 sheet × 2 trays, 50 -sheet Bypass tray Network Interface: 10/100 Base -TX, 1000Base -TX Analog Fax Support Included with machine Color Scanning with following requirements: Up to Up to 600 × 600 dpi Scan Area up to 11" × 17" Scanning Protocol Support - TCP/IP, SMTP, SMB, FTP, POP3, NCP File Scan Types Supported: Single Page TIFF, JPEG, PDF, Multi - Page TIFF, PDF, and OCR PDF Scanning Support for Scan -to-Email, HDD, SMB (Folder), URL, and TWAIN Network protocol support for TCP/IP Client and Server Print Driver Support for PCL Print Drivers Server Operating System Support for Windows Server 2008 and Windows Server 2008 R2 (32 Bit/64 Bit) Client Print driver support for Windows XP/Windows 7 (Both PCL/(32 Bit and 64 Bit)) Minimum print/copy resolution of 600 × 600 dpi Secure printing with pas sword or pin from client to copier [3] Type 2 -A:10 -B:C, 5 -pound (2.27 g) size [4] Capable of handling the breakdown of 22 34-inch (559 864 mm) sized plans into ten sections. [5] Provide a broadband internet connection capable of minimum download speeds as follows: 10 Mbps download 2 Mbps upload - Network Latency less than 50 milliseconds . If speeds are not available through an individual or singular circuit, provide the highest speed available in the area and install multiple circuits to achieve the sp ecified speeds. When multiple broadband services are available the following is the preferred order: Cable, DSL, Cellular, and Wireless Radio (Satellite Communication is not compatible with ODOT VPN connection and will not be accepted). Supply modems capab le being configured in Bridge Mode. If a cellular network is used, provide the cellular equipment, including software and router equipment to connect to the ODOT provided Cisco ASA 5505 firewall. Supply ODOT with all documentation for the broadband circuit including all username/user ids, passwords and account information. Verify that the broadband internet connection is active and working as specified. ODOT IT personnel will confirm that bandwidth and network latency are compliant with the required field o ffice specifications. All field office Internet connections are for ODOT use only. With the Engineer’s written approval, the Contractor may modify the requirements for the field office. Maintain all utility services (e.g., electric, security, telephone, w ater) for the duration of the project.
619.03 Method of Measurement . The Department will measure Field Office,
Type ___ by the number of months the office is maintained. A partial month at the end of the project will be paid as a full month.
619.04 Basis of Payment. The Department will pay for accepted quantities at
the contract price as follows: Item Unit Description 619 Month Field Office, Type ___