00857.80 879 Section 00857 - Rumble Strips Description
00857.00 Scope - This Work consists of milling rumble strips by constructing indentations in asphalt
concrete surfaces as shown or directed. Equipment
00857.20 Equipment :
00857.40 Construction - Where rumble strips will be constructed at the same locations where
permanent pavement markings will be installed, construct rumble strips within 3 weeks after temporary pavement markings have been placed for the final R oadway configuration, but before installing permanent pavement markings. After constructing the rumble strips, clean the Pavement by sweeping to remove dust and other foreign matter. Dispose of all materials according to 00290.20. Measurement
00857.80 Measurement - The quantities of longitudinal rumble strips will be measured on the length
basis, at least to the nearest 0.01 mile. Measurement will be made along each rumble strip run, regardless of location or width of strip with no deductions made for gaps in gap pattern rumble strips. Breaks in the rumble strips at intersections, interchange ramps, or other locations shown will not be measured for payment. The quantities of transverse rumble strips will be measured on the unit basis, by actual count of rumble strip clusters. 00857.90 880 Payment
00857.90 Payment - The accepted quantities of rumble strips will be paid for at the Contract unit
price, per unit of measurement, for the following items: Pay Item Unit of Measurement
Rumble Strips in other states
Get an email when 00857 changes
Oregon revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.