01069.43 1005 Section 01069 - Metal Handrail and Pedestrian Fence
Description
01069.00Scope - This Work consists of furnishing and installing metal handrails and pedestrian rail
units as shown or directed.
Materials
01069.10Materials - Furnish Materials meeting the following requirements:
Construction
01069.40Metal Handrail and Pedestrian Fence:
01069.41Welding - Welding, welder qualifications, prequalification of weld details and inspection of
welds shall conform to AWS D1.1 or AWS D1.2. Submit all welding procedure specifications 7 Days prior to fabrication to the Engineer for approval.
01069.42Concrete Footings - Dimensions of footings shall not be less than shown and shall fill the
excavated areas. Place the concrete with contact against firm Soil at the sides and bottom and tamp around the posts and brace ends after the posts and braces have been brought to and firmly held in proper position. Strike off, slope or crown and smooth the surface of th e concrete at the ground level to shed water. Allow to cure for at least 5 Calendar Days before subjecting the posts to strain.
Excavate for concrete footings to reasonably Neat Lines, but not less than the specified dimensions in Soil, or not less than 18 inches deep in Rock. Prevent disturbance of original ground at the sides and bottom of the excavation. Dispose of Materials removed under these provisions, including excess excavation, in a satisfactory manner.
01069.43Bolt Holes:
than 1/16 inch. Ream holes that are required to be enlarged to admit the anchor bolts. Make clean cut holes without torn or ragged edges.
edges even and insert a cylindrical pin, 1/8 inch smaller in diameter than the nominal size of the punched hole, through the punched holes perpendicular to the face of the plate. No drifting of the rod while passing through each of the punched holes in the stack is allowed. Ensure that the edges of the stack stay in alignment. Non-conforming pieces will be rejected.
01069.80 1006 Measurement
01069.80Measurement - The quantities of Work performed under this Section will be measured
according to the following:
Length Basis - Metal handrail will be measured on the length basis, by measuring along the top rail member, from center of end post to center of end post.
Unit Basis - Pedestrian fence will be m easured on the unit basis. Pedestrian fence will be counted for each 62 inch long unit.
Payment
01069.90Payment - The accepted quantities of Work performed under this Section will be paid for
at the Contract unit price, per unit of measurement, for the following items:
Pay Item Unit of Measurement
In item (a), the number of rails will be inserted in the blank.
Payment will be payment in full for furnishing and placing all Materials, and for furnishing all Equipment, labor, and Incidentals necessary to complete the Work as specified.