01069.43 1005 Section 01069 - Metal Handrail and Pedestrian Fence Description
01069.00 Scope - This Work consists of furnishing and installing metal handrails and pedestrian rail
units as shown or directed. Materials
01069.10 Materials - Furnish Materials meeting the following requirements:
Commercial Grade Concrete ...................................................................... 00440 Metal Handrail ............................................................................................ 02830 Pedestrian Fence ....................................................................................... 02831 Construction
01069.40 Metal Handrail and Pedestrian Fence:
01069.41 Welding - Welding, welder qualifications, prequalification of weld details and inspection of
welds shall conform to AWS D1.1 or AWS D1.2. Submit all welding procedure specifications 7 Days prior to fabrication to the Engineer for approval.
01069.42 Concrete Footings - Dimensions of footings shall not be less than shown and shall fill the
excavated areas. Place the concrete with contact against firm Soil at the sides and bottom and tamp around the posts and brace ends after the posts and braces have been brought to and firmly held in proper position. Strike off, slope or crown and smooth the surface of th e concrete at the ground level to shed water. Allow to cure for at least 5 Calendar Days before subjecting the posts to strain. Excavate for concrete footings to reasonably Neat Lines, but not less than the specified dimensions in Soil, or not less than 18 inches deep in Rock. Prevent disturbance of original ground at the sides and bottom of the excavation. Dispose of Materials removed under these provisions, including excess excavation, in a satisfactory manner.
01069.43 Bolt Holes:
01069.80 Measurement - The quantities of Work performed under this Section will be measured
according to the following: Length Basis - Metal handrail will be measured on the length basis, by measuring along the top rail member, from center of end post to center of end post. Unit Basis - Pedestrian fence will be m easured on the unit basis. Pedestrian fence will be counted for each 62 inch long unit. Payment
01069.90 Payment - The accepted quantities of Work performed under this Section will be paid for
at the Contract unit price, per unit of measurement, for the following items: Pay Item Unit of Measurement
Get an email when 01069 changes
Oregon revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.