1202.3( b) 1202. 3(c)
Location Information General Characteristics Communications Statewide Device ID Detector Type Communication Type Type (permanent vs. portable vs. semi -permanent) Manufacturer Communications Protocol (include version) District (Location) Model Connection Type District (Owner) Serial Number/ Manufacturer ID Connection Parameters (Serial Only) Roadway Power Type Controller Address Descriptive Location Controller Firmware Roadway Direction IP Address Mile Marker (where applicable) IP Port Name Exit Number (nearest) Subnet Mask County Gateway State Route Number NTCIP Protocols Supported Latitude NTCIP Community String (where applicable) Longitude
Location Information General Characteristics Communications Statewide Device ID Manufacturer WAN Communication Type Type (permanent vs. portable vs. semi -permanent) Model LAN Communication Type Enclosure ID Serial Number/ Manufacturer ID MAC Address District (Location) Port Types Firmware Version District (Owner) Port Quantity Default Gateway Descriptive Location Power Type IP Address Roadway IP Port Names Roadway Direction Subnet Mask Mile Marker (where applicable) Gateway Next Downstream Exit Number Time Configuration State Route Number Discovery Protocol Latitude Logging Protocol Longitude Exit Number (nearest) County
Performance Section , and the ATMS vendor. Coordinate with District ITS staff and the Operations and Performance Section to ensure the ITS device(s) installed within the project is(are) integrated into ATMS. Furnish all information prescribed herein in addition to all additional information required by the ATMS vendor to perform the integration. The System Test will be considered complete upon completion of the following:
the ITS device (s) and subsystem, and compliance with the project specifications. Conduct the test using vendor -provided device control software or other equivalent software installed on a Commonwealth -provided computer or workstation in the TMC with access to the ATMS and the PennDOT WAN. Demonstrate full functionality of the subsystem including all components, such as the workstation and all communications to and from the field. The Contractor is responsible for demonstrating full compliance with project 1202.3( c) 1202. 4) Coordinate with District ITS