SECTION 920 — RIPRAP 900-55 — RIPRAP
920.01 Description.
This work includes providing riprap on prepared surfaces of the sizes and layer thicknesses at the required locations. The work also includes placing stone bedding and filter fabric.
920.02 Materials.
Use materials that conform to Subsections M10.03, M10.03.1 and M10.03.2. Use gravel borrow that conforms to Subsection M01.02. Use geosynthetic fabric material that is suitable for erosion control applications and that complies with SECTION M20 and/or is included on the Department’s Approved Materials List. Use stone bedding that conforms to Subsection M10.03.1.
920.03 Construction Methods.
General. Ensure that slopes to be protected by riprap are free of brush, trees, stumps, and other unsuitable material and are graded to a smooth surface. Remove all unsuitable material to the required depth and replace with gravel borrow. Compact f ill as specified in Subsection 202.03.3(a) and (b). If a toe trench is shown on the Plans, excavate the trench and maintain until the riprap is placed. Provide protection for structure foundations as early as the foundation construction permits. Clean the area to be protected of waste materials and prepare the surfaces as required. Place riprap in conjunction with the construction of the embankment , avoiding the mixing of embankment and riprap materials. Maintain the riprap protection until accepted, and replace any material displaced to the required lines and grades at no additional cost to the Department. Geosynthetic Fabric. Ensure that the installation of geosynthetic fabric conforms to the manufacturer’s guidelines, with the minimums below.
Part 900 — Incidental Construction and Services August 2025
900-56 SECTION 920 — RIPRAP
920.04 Method of Measurement.
Riprap is measured by the number of square yards as computed from surface area.
Part 900 — Incidental Construction and Services August 2025
SECTION 920 — RIPRAP 900-57
920.05 Basis of Payment.
The Department will pay for the completed and accepted quantities as follows: Pay Item Pay Unit Riprap SY The price constitutes full for all labor, materials, and equipment, including excavation for riprap or bedding, preparation of subgrade, filter fabric, bedding material, trimming and fine grading, hauling and placing the material, and all incidentals required to finish the work, complete and accepted. Riprap placed outside the specified limits will not be paid for, and the Contractor will be required to remove and dispose of the excess riprap at no additional cost to the Department.