Section 707 — RIPRAP

Delaware Standard Specifications for Road & Bridge Construction, Section 707. Full text, cross-references and related pay items on BuildSpec.

SECTION 707 — RIPRAP 707.1 Description. This work consists of riprap and channel bed fill construction. 707.2 Materials. A. Stone Section 1006 B. Bagged Riprap Section 1030 707.3 Construction. 707.3.1 Pre-Sacked Concrete Riprap. A. Protect pre-sacked concrete riprap from moisture using a waterproof covering if the contractor does not place the riprap the same day of delivery. The Department will reject bags containing material that has begun to hydrate. B. Follow the manufacturer’s recommendations for weather limitations. C. Place geotextile in accordance with Section 708 and the contract. D.…

The rest of Section 707 — RIPRAP is for members

You're reading the opening of Section 707 — RIPRAP. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 707 — RIPRAP — free for 14 daysSign in