Home / DOT Specifications / Utah / Construction Manuals / Municipal Separate Storm Sewer System (MS4) Discharge Permit (UPDES UTS000003)
🔧Construction Manuals
Municipal Separate Storm Sewer System (MS4) Discharge Permit (UPDES UTS000003)
PDFUtah Department of Transportation (UDOT)
UDOT's statewide UPDES MS4 stormwater discharge permit issued by Utah DEQ Division of Water Quality, setting the six minimum control measures and TMDL-related requirements UDOT must implement for runoff from its roadways and facilities.
Renewal permit effective August 31, 2026 through August 30, 2031.
Document Viewer
🔧
Open this publication at UT DOT
BuildSpec streams this file through its own viewer for signed-in accounts. You can read it right now at the source — it is Utah Department of Transportation (UDOT)'s own copy and it is free.
Open on UT DOT↗Alternative Formats
Other Construction Manuals
Ask about this section
Scoped to Utah Municipal Separate Storm Sewer System (MS4) Discharge Permit (UPDES UTS000003). Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.