B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
Finishes (09000-09999)

09991Cleaning And Repainting Or Overcoating

UT · 2026 Standard Specifications✓ Full text on BuildSpecRev. January 1, 2017Book pages 1203–1210 Save this section

Ask about Section 09991

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

CLEANING AND REPAINTING OR OVERCOATING STRUCTURAL STEEL

PART 1 GENERAL

1.1SECTION INCLUDES

A.Cleaning and repainting or overcoating existing structural steel surfaces

including all bearing units.

B.Removal of existing paint from existing structural steel surfaces.
C.Preparation of existing steel surface for repainting or overcoating and

painting the cleaned structural steel surfaces.

1.2RELATED SECTIONS Not Used

1.3REFERENCES

A.ASTM D 3359: Measuring Adhesion by Tape Test
B.ASTM D 4285: Indicating Oil or Water in Compressed Air
C.ASTM D 4417: Field Measurement of Surface Profile of Blast Cleaned

Steel

D.ASTM D 4541: Pull-Off Strength of Coatings Using Portable Adhesion

Testers

E.ASTM E 11: Wire Cloth and Sieves For Testing Purposes
F.Code of Federal Regulations (CFR)
G.Federal Standards
H.Northeast Protective Coatings Committee (NEPCOAT)
I.The Society for Protective Coatings (SSPC)

Cleaning and Repainting or Overcoating Structural Steel

1.4DEFINITIONS

A.Overcoating – Spot paint areas with bare steel followed by two coats of

paint over the entire surface of each structural steel member.

1.5SUBMITTALS

A.Materials
1.Source and gradation of the blast abrasive.
2.Type and source of solvent if required.
3.Manufacturer’s information regarding the specified coating

materials, including:

a.Required wet and dry film thickness
b.Project safety data
c.Thinning recommendations
d.Temperature requirements
e.Profile recommendations
f.Mixing and application procedures
g.Required equipment
h.Method of application
4.Test samples
a.Cleaning operation samples, disposal evaluation results, and

disposal certificates. Refer to this Section, article 3.2 paragraph C.

b.Samples to the Department and an independent accredited

Materials Testing Lab for composition and disposal evaluation. Refer to this Section, article 1.6.

c.Paint composition and disposal evaluation results from the

independent materials testing lab. 1) Disposition will be given to the contractor within 30 days.

d.Disposal certificates for all waste paint.
B.Qualifications, methods, and documentation for information.
1.Certifications before the preconstruction meeting. Refer to this

Section, article 1.7.

2.Detailed plan of protection methods that includes Environmental

Protection for approval.

3.Quality Control Plan that contains at a minimum procedures and

verification of the following:

a.Compression air check
b.Dry film thickness – Refer to SSPC-PA 2
c.Air temperature
d.Humidity and dew point
e.Surface temperature
f.Abrasive cleanliness check – Refer to SSPC-AB 2

Cleaning and Repainting or Overcoating Structural Steel

g.Degree of cleanliness achieved
h.Surface profile – Refer to ASTM D 4417 method C
i.Batch number and amount of thinner used
j.Batch number of paint used
k.Mixing procedures
l.Paint repair procedures for scratches, gouges, holidays, mud

cracking, runs, and sags

4.Written site specific compliance program documenting the

equipment, training, containment, and monitoring system to comply with OSHA’s standard on lead exposure in construction as published in Federal Register, Section 29 CFR 1926.62, May 4, 1993.

a.Worker Health and Safety Program
b.Environmental Protection and Monitoring Program
c.Hazardous Waste Handling and Reporting of Release

Program d Refer to SSPC Guide 6 – Guide for Containing Surface Preparation Debris

5.Daily reports upon request.
a.Submit no later than 24 hours following the completion of

work.

1.6TEST SAMPLES

A.Department will test paint samples from each batch or lot before use.
1.Submit samples to the Engineer.
2.Paints must match the spectrum samples on file with the

Department.

1.7PAINTER AND BLASTER QUALIFICATIONS

A.The entity performing surface preparation or coatings applications in the

field:

1.Must have SSPC-QP 2 Category A certification before the

preconstruction meeting.

2.Remain certified for the duration of the project.
a.Do not perform work if certification has expired.
3.Notify the Engineer of any changes in certification status.

Cleaning and Repainting or Overcoating Structural Steel

PART 2 PRODUCTS

2.1SOLVENT

A.Solvent – Recommended by the paint system manufacturer.

2.2COATING SYSTEM

A.Select a complete three-part coating system consisting of a zinc primer,

epoxy or urethane intermediate coat, and aliphatic urethane top coat from the NEPCOAT Qualified Products List. Refer to http://www.udot.utah.gov/go/standardsreferences for a link to this list.

B.Paint Color – Federal Standard 595.
1.Intermediate coat Color No. 26293
2.Top coat Color No. 26306 or as specified

PART 3 EXECUTION

3.1GENERAL

A.Use manufacturer’s information regarding the specified coating materials,

including required wet and dry film thickness, project safety data, thinning recommendations, temperature requirements, profile recommendations, mixing and application procedures, and required equipment.

3.2PREPARATION – GENERAL

A.Meet soluble salts requirements of SSPC-Guide 15 and the coatings

manufacturer.

B.Protection
1.Fully contain all material resulting from surface preparation and

paint overspray.

2.Enclosure system must withstand extreme high winds.
3.Protect all portions of the structure that will not be painted.
4.Protect pedestrian and vehicular traffic. Use barriers during any

blast-cleaning operations to protect pedestrians and vehicles and to prevent spreading or falling of abrasive materials and debris on the traveled portions of the pavement. Remove any abrasive materials and debris on pavement, shoulders, or slope paving before reopening work areas to traffic.

Cleaning and Repainting or Overcoating Structural Steel

C.Recover a minimum of 95 percent of debris from cleaning operation.
1.Sample debris from cleaning operation.
2.Place reclaimed waste paint in EPA-USDOT approved

containment. Store at the project site.

3.Dispose of waste paint as determined by the Engineer.

3.3PREPARATION – REPAINTING STRUCTURAL STEEL

A.Clean surfaces including bearing units of all oil, grease, and dirt with clean

petroleum solvents or steam cleaning before blasting operation.

B.Blast surfaces clean to near white with 0.5 to 2 mil profile. Refer to SSPC-

SP 10.

C.Discoloration, light shadows, or slight streaks caused by stains of rust is

not allowed on more than 5 percent of surface area.

D.Define acceptable surface preparation using SSPC-Vis 1.
E.Use SSPC-SP 11 to clean areas such as backside of base plates and

corners that cannot otherwise be cleaned.

F.Prime the surface within 8 hours after blasting.
G.Do not prime the surface if rust has started to form. Clean the surface

again before applying the prime coat.

3.4PREPARATION – OVERCOATING STRUCTURAL STEEL

A.Clean designated surfaces of all oil, grease, debris, and dirt with clean

petroleum solvents. Follow with high-pressure wash (SSPC-SP 1).

B.Remove all corrosion and all paint that shows peeling, brittleness,

checking, scaling, or general disintegration including bearing units.

1.Use vacuum shrouded power tool cleaning (SSPC-SP 3).
2.Remove paint from the area and beyond the edges of the area so

that remaining paint system shows no rusting or blistering underneath and adheres tightly to the surface. Remaining paint system should have sufficient adhesion that cannot be lifted as a layer by inserting a blade or putty knife under it. Meet requirements of ASTM D 3359 and D 4541.

3.Feather the edges of the remaining paint system around the

cleaned areas so the repainted surface appears smooth.

Cleaning and Repainting or Overcoating Structural Steel

3.5PREPARE PAINT MATERIALS

A.Mix the paint to a lump-free consistency with a high shear mixer according

to the manufacturer’s directions.

1.Do not use paddle mixers or paint shakers.
2.Keep paint in the original containers and mix until all the metallic

powder or pigment is suspended.

3.Continue mixing until all solids or pigments that may have settled to

the bottom of the container are thoroughly dispersed.

B.Strain the paint through a screen with openings no larger than those

specified for a No. 50 sieve. Refer to ASTM E 11.

C.Strain and continuously agitate the mixed material up to and during

application.

3.6APPLY PAINT – GENERAL

A.Field Inspection
1.Do not apply paint until the Engineer verifies the prepared surface.
2.Use rubber rollers or other approved protective devices on scaffold

fastenings.

3.Do not use metal rollers, clamps, and other types of fastenings that

mar or damage freshly coated surfaces.

B.Consult with the manufacturer’s technical representative for answers to

technical questions related to the application of the specified coating materials.

C.Project Conditions/Weather Limitations
1.Follow the manufacturer’s recommendations if weather conditions

require paint thinning.

2.Apply paint only when the following weather conditions exist:
a.The temperature of the air and the steel are above 40

degrees F but not so hot as to cause the paint to blister.

b.The relative humidity is less than 85 percent or such that the

combination of temperature and humidity conditions inhibits surface condensation.

c.Apply a thin film of water to a small area to test humidity.

The surface may be painted if the film evaporates within 15 minutes.

d.The steel temperature is a minimum of 5 degrees F above

dew point.

Cleaning and Repainting or Overcoating Structural Steel

D.Use necessary equipment for proper application of the specified coating.

Observe safety practices found in SSPC-PA Guide 10, Guide to Safety and Health Requirements.

E.Apply paint with spray nozzles at pressures recommended by the

manufacturer of the coating system.

F.Use wet and dry film thickness gauges for testing the coating thickness

during and after application. Refer to SSPC-PA 2. Use equipment capable of taking dry film thickness readings on all portions including nuts and bolts.

G.Apply two or more coats if the required film thickness could not be

obtained by one coat without producing runs, bubbles, or sags.

H.Apply paint to produce a uniform, even coating that bonds to the

underlying surface. Refer to SSPC-PA 1.

3.7APPLY PAINT – REPAINTING STRUCTURAL STEEL

A.Prime Coat
1.Maintain the dry film thickness of the prime coat between 2.5 and

6.0 mils.

2.Blast clean any coat that produces “mud-cracking” or adds more

than 7.0 mils to a soundly bonded coating on bare steel. Refer to SSPC-SP 10. Re-coat the surface.

3.Thoroughly clean areas that have deficient primer thickness with

power washing equipment to remove all dirt. Wire-brush, vacuum, and re-coat the area.

B.Intermediate Coat
1.Use the coating type and minimum dry film thickness specified.
2.Produce a dry-film thickness of the intermediate coat greater than 4

mils.

C.Top Coat
1.Keep the dry film thickness greater than 2 mils.

3.8APPLY PAINT – OVERCOATING STRUCTURAL STEEL

A.Intermediate Coat
1.Spot paint any areas with bare steel, followed by another full

intermediate coat over the entire steel surface.

2.Apply a minimum dry film thickness of 3 mils for the spot coat and a

minimum of 2 mils for the full intermediate coat.

Cleaning and Repainting or Overcoating Structural Steel

B.Top Coat
1.Apply top coat to entire steel surface.
2.Keep the dry film thickness at 2 mils or greater.

END OF SECTION

Cleaning and Repainting or Overcoating Structural Steel

Get an email when 09991 changes

Utah revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Utah Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 1203–1210 of 1,331. View official source ↗

Ask about this section

Scoped to Utah Standard Specifications, Section 09991 — Cleaning And Repainting Or Overcoating. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.