Effective with the December 2018 Letting 2 2019 Standard Specif ications Section 101 General Information, Definitions, and Terms
101.1 General
101.2 References and Acronyms
101.3 Definitions
108.10 or 109.4 .
Adverse weather day For calendar day or completion date contracts, a day the contr actor is scheduled to work when weather, or job conditions caused by recent weather, cause the contractor to lose 4 or more hours of work on the controlling item. Advertisement See also notice to contractors Affiliated Having a relationship where o ne business concern or individual directly or indirectly controls or can control the others. Auxiliary lane The portion of the roadway adjoining the traveled way for park ing, change of speed, or for other pur poses supplementary to through traffic movement. Award The department’s acceptance of a bid. Base The layer or layers of specified or selected material of desig ned thickness placed on a subbase or subgrade to support a surface course. Bid See proposal Bidder An individual, partnership, joi nt venture, corporation, limite d liability company, limited liability partnership, or a combination of any or all jointly, submitting a proposal (bid) for the work advertised in the invitation for bids, acting directly or through a duly authoriz ed representative. Bidding proposal The department-approved form the department requires bids to b e prepared and submitted for the wo rk on. The bidding proposal is further described in 102.2 . Bridge A structure having a span of more than 20 feet from face to fa ce of abutments or end bents, measured along the centerline of the roadway, spanning a water course or other opening or obstructio n, such as a highway or railroad , including the substructure, superstructure, and trestle work approaches. Bureau The department's bureau of pro ject developm ent. Language specifically identifies other department bureaus. Business day Every day the calendar shows, except Saturdays, Sundays, and department-specified holidays. Calendar day Every day the calendar shows, including Saturdays, Sundays, an d department-specified holidays. Certificate of compliance A document, provided by a manuf acturer, producer, or supplier of a product, stating that the product as furnished to the contracto r complies with the pertinent spec ifications and contract require ments. Certified report of test or analysis A certified test report, provided by a manufacturer, producer, or supplier of a product, indicatin g that actual results of tests or analyses comply with the el ements of the specification requirements. Completion date The calendar date shown in the pr oposal on or before which the work contemplated under the contract shall be completed. Construction limits The limits of grading or other w ork generally defined by slope stakes offset from the actual slope intercepts or limit s of the work. Consulting firm The individual, partnership, joi nt ventures, corporation, or a gency contracted by the department to a ct directly or as a duly autho rized construction representative pr oviding services for the departme nt. Effective with the December 2018 Letting 5 2019 Standard Specif ications Contract The written agreement between t he department and the contracto r setting forth the obligations o f the parties to the contract, i ncluding, but not limited to, performance of the work, furnishing of labo r and materials, and bas is of payment. The contract includes the notic e to contractors, proposal, cont ract form, contract bond, standard spec ifications, special provision s, addenda, general plans, detailed plans, notice to proceed, and contract change orders and agr eements required to complete the construction of the work in an acceptable manner, including authorized extensions, all of which constitute one instrument. Contract bond The department-approved form of security, executed by the contractor and the contractor’s surety or sureties, guaranteeing the performance of the contract work, completion of the contract requirements, and the payment of c laims as provided in 779.14 o f the Wisconsin statutes. http://docs.legis.wi.gov/s tatutes/statutes/779 Contract change order A written order or authorization the engineer executes coverin g work not otherwise provided for in t he contract, revisions in or amendments to the contract, or c onditions specifically prescrib ed in the specifications a s requiring contract change orders. The cha nge order document becomes a part of t he contract wh en executed by the department. Contract modification Any change to the contract made after it is executed, includin g but not limited to, the following: - A contract change order. - An administrative chan ge adding a non-bid item. - A general administrative change. Contract revision See: contract modification Contract time The number of calendar or worki ng days shown in the proposal representing the time allowed fo r the completion of the work contemplated in the contract. Contractor The individual, partnership, joi nt venture, corporation, limit ed liability company, limited liability partnership, or agency undertaking t he performance of the work under t he terms of the contract and act ing directly or through a duly a uthorized representative. Controlling item of work An activity on the project schedule, that if delayed, delays completion of the project. Culvert A structure not classified as a bridge that provides an openin g under a roadway. Department The Wisconsin Department of Transportation. Detour An existing, permanent road desi gnated as a temporary route to carry vehicular traffic around a section of a highway closed to through traffic. Divided highway A highway with separate roadways for traffic in opposite directions. Division administrator The administrator of the department of transportation, divisio n of transportation system development. Engineer The secretary of t he department of transpor tation or the secre tary’s authorized representativ e limited by the part icular duties assi gned to the representative. Equipment Machinery and articles necessa ry for the proper construction a nd acceptable completion of the wo rk. This includes the supplies, tools, and apparatus for upkeep and ma intenanc e of the equipment. Erosion control imp l ementation plan The erosion control implementat ion plan, or ECIP, as required under Trans 401 of the Wisconsin administrative code. Extra work All work performed by the contractor, with approval of the engineer, that does not appear in the propos al or contract as a specific bid item accompanied by a unit price , and that is not included unde r the price bid for other bid items in the contract. Extra work may a lso consist of additions to, or changes in, design of contract bid items or portions of contract bid items, if additions are wholly disassociated from or outside the scope of work in the contract, and if the w ork caused by these additions or changes must be performed under Effective with the December 2018 Letting 6 2019 Standard Specif ications conditions or in a m anner materially different from the conditi ons and manner existent for contract bid items under the original scope of work. Force account A method of payment based on the cost of labor, equipment, materials furnished, and consider ation for overhead and profit as specified in 109.4.5. Frontage road or street A local road or street auxilia ry to and located along the side of an arterial highway for service to abutting property and adjoining areas and for control of access. Government entity Any unit of federal, s tate, county, municip al, or town governm ent, including all entities described in the definition of “municipa lity” in 16.70(8) of the Wisconsin statute s. Where a project is construc ted across state boundaries, it incl udes those same entities from t he adjoining state or states. http://docs.legis.wi.gov /statutes/statutes/16 Hazardous substance A substance or combination of s ubstances, including waste of a solid, semisolid, liquid, or gas eous form, that may cause or significantly contribute to an increase in mortality or an increase in serious, irreversible, or incapacitating, reversible illness, or that may pose a substantial present or pot ential hazard to human health or the environment. Highway separation A structure carrying highway traffic over or under another hig hway or street. Highway, street, or road A public way for the purpose of vehicular travel, including th e entire area within the right-of-way. Holidays The following days are department-specified holidays for use i n determination of working days: New Year’s day Thanksgiving day Martin Luther King Jr. day Christmas Eve day Memorial day Christmas day Independence day New Year’s Eve day Labor day Inspector The authorized representative o f the engineer assigned to insp ect the work or materials. Interchange A highway separation with access connections between the highways. Laboratory The materials testing labora tory of the department or other te sting laboratory the engineer designates. Local road or street A street or road used primarily for access to residences, businesses, or other abutti ng property. Local traffic Passage of vehicles, people, and goods originating within, or having a destination on, the portion of the highway closed to through traffic as specified in the contract. Major and minor bid items A major bid item is a bid ite m whose total cost, determined by multiplying the bidding schedule quantity and the contract unit price, is equal to or greater than eith er 5 percent of the total amoun t of the original contract or $400,000. Other bid items are minor bid items. A minor bid item, when its quantity is increased, becomes a major bid item if it meets eit her of the criteria for a major item. Materially unbalanced bid A bid that generates a reasonable doubt that award to the bidd er submitting a mathematically unbalanced bid will result in the l owest ultimate cost to the department. Mathematically unbalanced bid A bid containing lump sum or unit price bid items that do not reflect reasonable anticipat ed actual costs of labor , equipment, materi als, plus a reasonable pr oportionate share of t he bidder’s anticipat ed profit, overhead costs, and other indirect costs. Materials Substances specified for use in the construction of the work. See also: new material, reclaim ed asphalt, recov ered material, recycled material, and special waste. Median The portion of a divided highway separating the traveled ways for traffic in opposite directions. Effective with the December 2018 Letting 7 2019 Standard Specif ications New material Material not used for another pur pose before incorporation int o the work. Notice to contractors The advertisement for proposals fo r work or materials on which bids are required. The advertisement w ill indicate with reasonable accuracy the quantity and locati on of the work to be done, or t he character and quantity of the ma terial to be fu rnished, and the time and place of submitting and opening the proposals. Notice to proceed A written notice from the engi neer to the contractor of the ti me period within which the prosecut ion of the work shall begin. Pavement structure The combination of subbase, bas e, and surface course placed on a subgrade to support the traffic l oad and distribut e it to the r oadbed. Plans The department-approved plans, pro files, typical cross-section s, working drawings, and supplement al drawings that show the location, character, dimensions, and details of the work to be done. Plant names and labels The plant names and labels us ed in the nomenclature references listed in the current edition o f the American Standard for Nurs ery Stock. Project The designated physical area t ogether with impr ovements to be constructed under the contract. Project engineer The authorized representative of the engineer having direct supervision of the administr ation of the contract. Proposal The written offer of the bidder , submitted on the prescribed proposal form, to perform the work at the prices quoted by the bidder; a lso commonly known as the "bid." Proposal guaranty The security furnished with a b id to guarantee that the bidder will enter into the contract if the bid is accepted. Quality management program The department's specifications defining both department and contractor responsibilities for assuring quality construction. The specifications provide for the following: Quality control Required contractor sampling and testing the department uses to determine specif ication conformance. Quality ve rification Department sampling and test ing the department uses to validate the quality of the final product. Independent assurance Activities the department use s to evaluate the QC and QV sampling and testing procedures. Dispute resolution Procedures the department uses to resolve disputes over conflicting test results for nonconforming work. Reclaimed asphalt A recovered material from exist ing asphaltic pavement or surface. Recovered material A product recovered from solid waste in a form identical to th e original form, for a u se that is the same o r similar to the ori ginal use. Recycled material A product manufactured from previously-used products. Region The department's transportation region office. Review panel The department's claims review panel. Responsible bidder A bidder determined by the department to possess the ability t o perform the contract work and complete the contract requirement s. Right-of-way Land, property, or interest in land or property acquired for o r devoted to transportation purposes. Roadbed The graded portion of a highway, within top slopes and side sl opes, prepared as a foundation for the pavement structure and shoulde rs. Roadside The area adjoining the outer edge of the roadway. Areas betwee n the roadways of a divided highway may also be considered roadside. Roadway The portion of a highway within the limits of construction. A divided highway has 2 or more roadways. Roadway foundation The area underlying the proposed roadway within the limits of assumed one-to-one slopes extending outward and downward from the subgrade shou lder points. Schedule of items The prepared schedule, includ ed as a part of the proposal form , containing the estimated quanti ties of the pay items for which unit bid prices are invited. Effective with the December 2018 Letting 8 2019 Standard Specif ications Secretary The secretary of the Wisconsin Department of Transportation. Semi-final estimate An estimate indicating the eng ineer has measured and reported all contract quantities and materials requirements. SI metric The International System o f Units for metric measure. Shoulders The portions of the roadway cont iguous with the traveled way f or accommodation of stopped vehicles, emergency use, and lateral support of base and surface courses. Shop drawings Stress sheets, working drawings, erection plans, falsework plans, framework plans, cofferdam plans, bending diagrams for reinforc ing steel, or other supplementary pl ans, computations, or similar d ata that the contractor is required to subm it to the engineer. Sidewalk The portion of the roadway constructed primarily for the use of pedestrians. Special provisions Written directions and requir ements applicable to a specific project and not otherwise thoroughly or satisfactorily detailed or prescribed in the standard specif ications or supplemental specifications. Special waste Solid waste characterized for beneficial use in public works p rojects by the WDNR under section 895.58 of the Wisconsin statutes. http://docs.legis.wi.gov/s tatutes/statutes/895 Specifications Written directions, provisions, and requirements contained in the standard specifications or special provisions, together with wr itten agreements and document s referenced in the contract, pertaining to the method or manner of performi ng the work, the quantities of work, and the quality of materials to be furnished under the contract ; as made part of the contract and cont ained in or referenced in the proposal. See also: special provisions a nd standard spec ifications. Stabilization Modification of soils or aggrega tes by incorporating materials that will increase load bear ing capacity, firmne ss, and resistance t o weathering or displacement. Standard specifications Written directions and requir ements approved for general appli cation and repetitive use as c ontained herein for highway and structures construction and for administration of the contract. State The state of Wisconsin. Subbase The layer or layers of specified or selected material of desig ned thickness placed on a subgrade to support base. Subcontractor The individual, partnership, c orporation, limited liability co mpany, or joint venture to which the cont ractor, with the department’s wr itten consent, sublets part of the contract. Subgrade The top surface of a roadbed upon which the pavement structure and shoulders are constructed. Substructure All of the bridge below the bri dge seats or below the tops of the caps of piling or framed trestles, including the wing walls, backwal ls, and parapets of abutments. Superintendent The contractor’s authorized representative in responsible char ge of the work. Superstructure All of the bridge abov e the bridge seats or above the tops of caps of piling or framed trestles, including flooring, but excluding wi ng walls, backwalls, and parapets of abutments. Surety The company executing a cont ract bond with the contractor. Surface course One or more layers of a pavemen t structure, the top layer of w hich resists skidding, traffic abrasion, and the disi ntegrating effe cts of climate. Traffic lane The portion of a traveled way for the movement o f a single lin e of vehicles. Traveled way The portion of the roadway for the movement of vehicles, exclu sive of shoulders and auxiliary lanes. Unacceptable work Work that does not conform to t he contract and results in a product that is insufficient to fulfill the needs of the project. Unbalanced bid See: materially unbalanced bid and mathematically unbalanced b id Effective with the December 2018 Letting 9 2019 Standard Specif ications US standard The US standard measure system of units for english measure. Work The furnishing of all labor, materials, equipment, and inciden tals and the performing of all tasks needed to complete the project or a specific part of the project as specified in th e contract, together with fulfillment of all associated obligations and duties required u nder the contract. Working day A calendar day, except Saturdays, Sundays, department-specifie d holidays, and the period from Nov ember 16 to March 31, both dat es inclusive, on which weather or o ther conditions not under the c ontrol of the contractor will allow co nstruction operations to proceed for at least 8 hours of the day with the normal working force engaged in performing the controlling item of work which would be in progr ess at this time. Effective with the December 2018 Letting 10 2019 Standard Speci fications Section 102 Bidding Requirements and Conditions
102.1 Prequalifying Bidders
102.2 Bidding Proposal Content
102.3 Issuing Bidding Proposals
102.3.1 General
102.3.2 Department May Not Issue
102.3.3 Department Will Not Issue
General Information, Definitions, and Terms in other states
Get an email when 101 changes
Wisconsin revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.