Effective with the December 2018 Letting 123 2019 Standard Spec ifications Section 305 Dense-Graded Base
305.1Description
aggregates at the contractor's option: Crushed stone Reclaimed asphalt Crushed gravel Reprocessed material Crushed concrete Blended material
305.2Materials
305.2.1 General
reclaimed asphalt, rep rocessed material, o r blended material. Provide QMP for dense-graded base as specified in 730.
material, or blended materials below virgin aggregate materials unless the contract specifies or the engineer allows in writing. 305.2.2 Gradations 305.2.2.1 General
PERCENT PASSING BY WEIGHT SIEVE 3-INCH 1 1/4-INCH 3/4-INCH 3-inch 90 - 100 ___ ___ 1 1/2-inch 60 - 85 ___ ___ 1 1/4-inch ___ 95 - 100 ___ 1-inch ___ ___ 100 3/4-inch 40 - 65 70 - 93 95 - 100 3/8-inch ___ 42 - 80 50 - 90 No. 4 15 - 40 25 - 63 35 - 70 No. 10 10 - 30 16 - 48 15 - 55 No. 40 5 - 20 8 - 28 10 - 35 No. 200 2.0 - 12.0 2.0 - 12.0[1][3] 5.0 - 15.0[2] [1] Limited to a maximum of 8.0 per cent for base pl aced between ol d and new pavement. [2] 8.0 - 15.0 percent if base is >= 50 percent crushed gravel. [3] 4.0 - 10.0 percent if base is >= 50 percent crushed gravel.
may substitute 3-inch for 1 1/4- inch in lower base zones including material underlying the shoulder.
unpaved portion of the shoulder and on exposed shoulder foreslo pes. The contractor may substitute 1 1/4- inch for 3/4-inch elsewhere in shoulders and shoulder foreslopes. If using 1 1/4-inch, limit the al lowable reclaimed as phalt content to 50 percent or less. 305.2.2.2 Reclaimed Asphalt
base. The engineer will assess gradation primarily by visual in spection but may test questionable material.
305.3Construction
305.3.1 General
305.3.2 Compaction 305.3.2.1 General
standard compaction conforming to 301.3.4.2 . Final shaping of shoulder foreslopes does not require compaction.
Effective with the December 2018 Letting 124 2019 Standard Spec ifications 305.3.2.2 Compacting 1 1/4-Inch Base and 3/4-Inch Base
layer placed over a loose sandy subgrade, the contractor may, w ith the engineer's approval, increase the compacted layer thickness to 8 inches.
305.3.2.3 Compacting 3-Inch Base
layer. 305.3.3 Constructing Aggregate Shoulders 305.3.3.1 General
modifications needed to conform to other work.
limits. Recover uncontaminated material deposited outside the l imits and place within the limits.
Do not leave aggregate on the pavement overnight. After placing the shoulder aggregate, keep the pavement surface free of lose aggregate.
conforming to 301.3.4.2 .
305.3.3.2 Shoulders Adjacent to Concrete Pavement or Base
approximate grade and cr oss-section before o pening the pavement to public traffic. 305.3.3.3 Shoulders Adjacent to A sphaltic Pavement or Surfacin g
before opening the road.
within 3 feet or less from the edge of the traveled way, eliminate the drop-off within 48 hours after completing that days paving. Unless the special provisions spec ify otherwise, provide aggregate shoulder material compacted to a temporary 3:1 or flatter cross slope from the surface of the pavement edge.
completing shoulder construction to the required cross-section and flush with the asphaltic pavement or surfacing. 305.3.4 Shaping Shoulders
before the end of the day's work, to ensure proper drainage while salvaging existing pavement and constructing new pavement. Do no t contaminate the shoulder aggr egate with deleterious material. Incorporate material obtained from shaping shoulders in the new shoulder, in widening the roadbed, or as the plans show. 305.3.5 Constructing Detours
the plans show or the engineer d irects. Use 3/4-inch base unless the plans or special provisions specify otherwise. 305.4 Measurement
section by the ton or cubic ya rd acceptably completed. The depa rtment will determine weight or volume, adjust for moisture, and convert between weight and vol ume as specified in 301.4 . The department may deduct fo r contaminated aggregate o r unrecovered aggregate deposited outside the outer shoulder limits.
along the centerline for each shoulder separately.
Effective with the December 2018 Letting 125 2019 Standard Spec ifications 305.5 Payment
items: ITEM NUMBER DESCRIPTION UNIT
305.0110 Base Aggregate Dense 3/4-Inch TON
15 Base Aggregate Dense 3/4-Inch CY
20 Base Aggregate D ense 1 1/4-Inch TON
25 Base Aggregate Dense 1 1/4-Inch CY
30 Base Aggregate Dense 3-Inch TON
35 Base Aggregate Dense 3-Inch CY
305.0410 Aggregate Detours TON
15 Aggregate Detours CY
305.0500 Shaping Shoulders STA
preparing the foundation; and for placing, shaping, compacting, and maintaining the base.
maintaining the existing aggregate shoulders.
305.2.2.1 , the department will pay for the substitute material as follows: - At the Base Aggrega te Dense 1 1/4-Inch unit price if substitu ting 3-inch in base course. - At the Base Aggrega te Dense 3/4-Inch uni t price if substituti ng 1 1/4-inch in shoulders.
Effective with the December 2018 Letting 126 2019 Standard Spec ifications Section 310 Open-Graded Base
310.1Description
both.
310.2Materials
open-graded base as specified in 730. For gradation conform to the following: SIEVE PERCENT PASSING (by weight) 1-inch 90 - 100 3/8-inch 45 - 65 No. 4 15 - 45 No. 10 0 - 20 No. 40 0 - 10 No. 200 0 - 5.0
1 coarse aggregate in 501.2.5.4.4 if that material conforms to the fracture requirements for ope n- graded crushed gravel specified in 301.2.4.5 .
unless the contract specifies o r the engineer allows in writing .
310.3Construction
a compacted thickness of 6 inc hes per layer. If using a vibrato ry roller, do not exceed a compacted thickness of 8 inc hes per layer.
prevent contamination of the dense-graded material in the shoul der area.
310.4Measurement
completed. The department may deduct for contaminated aggregate or unrecovered aggregate deposited outside the outer shoulder limits. 310.5 Payment
items: ITEM NUMBER DESCRIPTION UNIT
310.0110 Base Aggregate Open-Graded TON
15 Base Aggregate Open-Graded CY
stockpiling, placing, shaping, compacting, and maintaining the base.