Effective with the December 2018 Letting 128 2019 Standard Spec ifications Section 312 Select Crushed Material
312.1Description
improvement.
312.2Materials
unconsolidated overburden materials, topsoil, organic materials, steel, and other deleterious materials.
soundness on record. The engineer may also approve other sources as follows:
a primary crusher, will produce a material similar in size and texture to that produced from a quarry face.
deleterious material; and when p rocessed through a primary crus her produces a material similar in size and texture to that produ ced from a quarry face.
as sandstone, shale, slate, disintegrated granite, or heavily w eathered rock.
SIEVE PERCENT PASSING (by weight) 5-inch 90 - 100 1 1/2-inch 20 - 50 No. 10 0 - 10
the 1 1/2-inch sieve with at least 2 fractured faces.
visual inspection. The departmen t may also test for gradation o r fracture.
312.3Construction
adequate moisture in the aggre gate during placing, shaping, and compacting to prevent segregation and achieve adequate compaction.
may allow thicker layers to address soft foundation conditions. Compact select crushed material using standard compaction conforming to 301.3.4.2 .
312.4Measurement
acceptably completed. 312.5 Payment
items: ITEM NUMBER DESCRIPTION UNIT
312.0110 Select Crushed Material TON
15 Select Crushed Material CY
Effective with the December 2018 Letting 129 2019 Standard Spec ifications Section 313 Pit Run
313.1Description
improvement.
313.2Materials
retained on the 1 1/2 sieve, wit h the remaining material composed of sand with a nominal quantity of silt/clay. The maximum size of an individual piece cannot be mo re that 2/3 of the specified individual layer thickness. Obtain material from a department-approved sou rce substantially free of topsoil, organic materials, and other deleterious materials.
soundness on record. The engineer may also approve other sources conforming to the following criteria:
engineer’s judgem ent, conform to 313.2(1) .
The engineer may reject material produced from any pit with exc essive non-durable rock such as sandstone, shale, slate, disintegrated granite, or heavily weathered rock.
to 311.2 , or select crushed material conforming to 312.2 for pit run material.
313.3Construction
in the aggregate during placing, shaping, and compacting to pre vent segregation and achieve adequate compaction.
layers to address so ft foundation conditions . Compact pit run u sing standard compaction conforming to 301.3.4.2 .
313.4Measurement
313.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
313.0110 Pit Run TON
15 Pit Run CY
inch base, breaker run, or select crushed material for pit run as allowed under 313.2 , the department will pay for that material at the Pit Run unit price.