Effective with the December 2018 Letting 329 2019 Standard Spec ifications Section 603 Concrete Barrier
603.1Description
603.2Materials
Joint filler .................................................. ................................................................................................ 415.2.3 Steel rail, cap ra il, and fittings ............................ .......................................................................................... 614.2 Delineator brackets and delineator ref lectors ................. ............................................................................. 633.2
in 716. For cast-in-place barrier, p rovide QMP for class II ancillary concrete as specified in 716.
strength bar steel reinforcement in 505.2.4 .
APL. Provide an ordinary surface finish as specified in 502.3.7.2 on exposed precast surfaces unless the forms provide a suitable fi nish. Cure precast barrier as sp ecified in 415.3.12.2 using a curing compound conforming to 501.2.9 . The contractor may steam cure precast barrier, if the enginee r approves the temperature and procedure. Apply curing compound after steaming.
strength the plans show. Provide the adhesive manufacturer’s in stallation instructions to the engineer before installing anchors.
603.3Construction
603.3.1 Permanent Barrier 603.3.1.1 General
TABLE 603-1 CONCRETE BARRIER BID ITEM ENCODING
BARRIER BID ITEM TYPES DESCRIPTION CODE
SHAPE New Jersey shape NJ F shape F Vertical V example: Concrete Barrier Type S36A is a 36" single sloped median retaining wall barrier Single slope barrierS TRANSITION BID ITEM TYPES CLASS Standard barrier section none Median retaining wall A Short barrier section B Roadside retaining wall C example: Concrete Barrier Transition Type F32SF to S32 is a transition from 32" singl e faced F barrier to a 32" single sloped barrier FACES Double faced barrier DF Single faced barrier SF
out the pavement full depth in the r equired excavation area. Ba ckfill, dispose of excess material, and restore the grade after placing footings.
forms or engineer-approved slip form methods for barrier. Use f orms for transitions. C onstruct barrier on horizontal curves as a series of 12-foot or shorter chords.
603.3.1.2 Anchor Dowels
anchor dowels in the supporting su rface, or secure them in dril led holes with adhesive. Clean drilled holes and install dowels according to the adhesive manufacturer 's recommendations. Ensure installed dowels develop the str ength the plans show.
Effective with the December 2018 Letting 330 2019 Standard Spec ifications 603.3.1.3 Joints
and at plan locations. Use filler material sized to conform to the cross-section of the barrier and footing. 603.3.1.4 Curing
603.3.1.5 Straightedging
for trueness with a 10-foot str aightedge. Test the total surfac e area of the barrier top and face by holding the straightedge in successive positions parallel to the length of the barrier. Straightedge the barrier in successive stages o f not more than 1/2 the length of the straightedge.
mixed concrete or strike-o ff and refinish the surface. 603.3.1.6 Surface Finish
exposed formed surfaces as specified in 502.3.7.5 . 603.3.1.7 Surface Smoothness Tolerance
Do not straightedge the front face across chord boundaries on h orizontal curves . The engineer will accept areas that show high spots or depressions greater than 3 /8 inch but not greater than 3/4 inch in 10 feet. The contractor may grind high spots to less than 3/4 i nch in 10 feet tole rance. Remove and replace areas that have high spots or depressions in excess of 3/4 inch in 10 feet on the barrier top or face surfaces.
to the pavement surface. 603.3.2 Temporary Precast Barrier 603.3.2.1 General
delivered to the project, both for initial use and for replacing barrier damaged on t he project, meets the criteria for acceptable barrier . Maintain barrier on the projec t at or above the marginal level and replace barrier if its condition becomes unacceptable.
rail and install steel cap rail on the first abutting section o f temporary barrier. 603.3.2.2 Delivery, On-The-Project Trucking, and Removal
barrier to work sites within the project and remove it upon pro ject completion.
603.3.2.3 Installation
identified locations or as the engineer directs. Also make contract-identified or engineer-directed moves that do not require trucki ng and reinstall at those new l ocations. 603.3.2.4 Anchoring Barrier
design notes of the plan details r equire. Move and re-anchor as required to continuously protect construction operations. Fill holes as the engineer directs if the bridge deck will re main in service.
603.4Measurement
Barrier Double-Faced 32-Inch, Concrete Barrier Transition Secti on 32-Inch bid items by the linear foot acceptably completed, measured along the base of the barrier.
acceptably completed, measured as the centerline length within the pay limits the plans show.
Effective with the December 2018 Letting 331 2019 Standard Spec ifications (3) The department will measure the Co ncrete Barrier Transition bid items as each individual transition acceptably completed.
acceptably completed, measured as the linear feet of installed length once for each c ontract-identified work site within the project and other moves the engineer direc ts. The department will only measure moves requiring a truck haul. The department will not measure m oves made solely to accommodate the contractor's means and methods.
acceptably completed, measured along the base of the barrier after installation for each contract- identified or engineer directed initial installation. The depar tment will also measure subsequent contract-identified or engineer d irected reinstallations. The d epartment will not measure installations made solely to accommodate the contractor's means and methods.
acceptably completed, measured a fter anchoring along the base of the barrier anchored to the deck. The department will measure anchored barrier moved and anchored in a new location on the bridge deck. The department will not measure anchoring required on str uctural bridge approaches or solely to accommodate the contractor's means and methods.
603.5Payment
603.5.1 General
items: ITEM NUMBER DESCRIPTION UNIT
603.0105 Concrete Barrier Single-Faced 32-Inch LF
603.0205 Concrete Barrier Double-Faced 32-Inch LF
603.0405 Concrete Barrier Transition Section 32-Inch LF
603.1000 - 1999 Concrete Barrier (type) LF
603.2000 - 2999 Concrete Barrier Fixed Object Protection (type) L F
603.3000 - 3999 Concrete Barrier Transition (type) EACH
603.8000 Concrete Barrier Temporary Precast Delivered LF
603.8125 Concrete Barrier Temporary Precast Installed LF
603.8505 Anchoring Concrete Barrier on Bridge Decks LF
603.5.2 Permanent Barrier
compensation for providing barrier or the specified transition; for excavating and bac kfilling for all types except roadside retaining wall; and for disposing of excess mat erial; for restoring the grade.
greater than 3/4 inch, or ground to less than 3/4 inch, at 75 p ercent of the contract unit price. The department will administer the pr ice adjustment under the Nonco nforming Smoothness Concrete Barrier administrative item.
- Sawing existing concrete or asphalt not placed under the cont ract, under the Sawing Concrete or Sawing Asphalt bid item as specified in 690.5 . - Excavating and backfilling re quired for roadside retaining wa ll barrier, Concrete Barrier TypeS(size)C bid items, under the Excavation bid items as specified in 205.5 and under the Backfill St ructure bid items as specified in 210.5 . - Providing delineators for per manent barrier, under the Deline ator Brackets and Delin eator Reflectors bid items as specified in 633.5 . 603.5.3 Temporary Barrier
initial delivery, trucking between work sites, and removing after contract completion.
including providing steel rail connections and steel cap rail f or installations abutting permanent barrier.
Effective with the December 2018 Letting 332 2019 Standard Spec ifications 603.5.4 Anchoring Barrier
devices; for moves required during construction; for coring the bridge deck; for removing anchoring devices; and for filling holes.
Effective with the December 2018 Letting 333 2019 Standard Spec ifications Section 604 Slope Paving
604.1Description
crushed aggregate slope paving to control and prevent erosion o f the slopes and waterways.
604.2Materials
Water ......................................................... .................................................................................................. 501.2 Crushed ag gregate ............................................. ......................................................................................... 501.2 Select crushed material ....................................... ........................................................................................ 312.2 Expansion jo int filler ........................................ .......................................................................................... 415.2.3 Asphaltic materials ....................................................................................................................................... 450.2
Provide QMP for class III ancilla ry concrete as specified in 716.
conforming to coarse concrete aggr egate size No. 2 but with the additional requirement that at least 75 percent of the particles, by count, have at least one fractured face. Determine fracture according to ASTM D5821 as modified in CMM 8-60 .
to 312.2 except the material need not be from a department-approved sou rce.
slope paving.
conforming to AASHTO M208 for the asphaltic material in crushed aggregate slope paving.
604.3Construction
604.3.1 General
lines, grades and cross-sections the plans show, and the engineer directs. Prepare the foundation by excavating high places and backf illing and compacting low places until it conforms to the required elevation and slope, and is unifo rm in density. Dispose of exce ss excavated material as specified for disposal of surplus or unsuitable material in 205.3.12 , or as the engineer directs.
abutments, or other solid fixtures. 604.3.2 Crushed Aggregate Slope Paving
and consolidate it to provide a stable, even, and uniform surface.
penetration and binding of the parti cles in the upper 2 inches of the aggregate blanket. Avoid excessive application of asphalti c material and exercise care t o prevent material run-off. Protect the surface of the adjacent structure to prevent splattering or dis coloration by asphaltic material, and immediately remove material accumulations at the foot of the sl ope paving. 604.3.3 Select Crushed Material Slope Paving
shape and consolidat e it to provide a stable, even, and uniform surface. Do not apply asphaltic material binder. 604.3.4 Concrete Slope Paving 604.3.4.1 General
concrete slab a minimum 4 inches thick. Ensure the concrete is a workable consistency when placed, but dry enough to retain its position when struck off. Strike-o ff the concrete with a straightedge supported on the forms and finish with a wood float.