Effective with the December 2018 Letting 379 2019 Standard Spec ifications Section 627 Mulching
627.1Description
seeding the surfaces of the roadway.
627.2Materials
other suitable material of a similar nature that the engineer a pproves, and is substantially free of noxious weed seeds and objectionable foreign matter.
erosion control prod uct acceptability list ( PAL). The contractor may obtai n a copy of the department's PAL and the prequalification procedur e for products not on the dep artment's PAL.
627.3Construction
627.3.1 General
seeding.
proper mulch placement.
but thick enough to shade the gr ound, conserve soil moisture, a nd prevent or reduce erosion.
causes. 627.3.2 Placing
or Method C, or a combination o f the 3, unless a specific metho d is specified in the contract. 627.3.2.1 Method A, Netting
inches. Use a specific rate o f application; dependent on the character of the material, that results in a cover conforming to the requi rements specified above in 627.3.1 . Loosen or make fluffy the mulch material from compacted bales before spreading in place. Unless directed otherwise, begin mulching at the top of the slopes a nd proceed downward.
pegs or staples to prevent it fr om floating as the vegetation g rows. Instead of this anchorage, the contractor may secure mulch by heavy biodegradable twine fastened by pegs or staples to form a grid with 6 to 10 feet spacing.
instead of separately applying mulch and netting. 627.3.2.2 Method B, Tackifier
in one operation. Place straw o r hay uniformly over the area 1/2 to 1 inch deep, using 1/2 to 3 tons of mulch per acre. Mix and place tackifier according to the department's PAL. Within the above limits, the engineer will determine, on the job, the application rate of the mulch and the tackifier, and the engineer may vary the rates during mulching to produce the desi red results. Use an engineer- approved machine to place the mulc h that blows or ejects by con stant air stream a controlled quantity of mulch and applies a spray of tackifier to partially coat the straw or hay, sufficient to hold together and keep in place the deposited straw or hay. The contractor ma y apply the tackifier as an overspray in a separate operation after placing the straw or hay.
engineer-approved methods, that p lace a controlled quantity of mulch uniformly over the area 1/2 to 1 1/2 inches deep. Treat areas receiving wood chip mulch, with one pound of available nitrogen per 1000 square feet before or after applying the chips.
uniform ejection from the disc harge spout, and operate in a pos ition to produce mulch of uniform depth and coverage.
Effective with the December 2018 Letting 380 2019 Standard Spec ifications 627.3.2.3 Method C, Crimping
inches, using 1/2 to 3 tons of mul ch per acre, by blowing from a machine, as specified in Method B, or by other engineer-a pproved methods.
series of dull, flat discs with notched edges. Space the 20 inc h diameter discs at about 8 inch centers. Equip the crimper with a ballas t compartment to allow adjusting the weight for depth control.
will not allow mulch crimpers to operate on slopes so steep tha t damage to the mulch, seedbed, or soil occurs. Anchor the mulch on these areas by one of the following methods: Method A or Method B. Equip and operate tractors to minimize disturbing or displacing the soil. This process may require more than one pass of the crim per to ensure adequate anchoring of the mulch.
627.4Measurement
whichever the contract specifies.
area that the contractor applied the mulch.
and acceptably completed.
627.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
627.0200 Mulching SY
05 Mulching TON
all hauling, treating, placing, s preading, and an choring of the mulch material; and for maintaining the work and repairing all damaged areas.
mulch and netting, the departmen t will pay for it at the contra ct unit price for Mulching only.
Effective with the December 2018 Letting 381 2019 Standard Spec ifications Section 628 Erosion Control
628.1Description
and other erosion control devices.
628.2Materials
628.2.1 General 628.2.1.1 Acronyms
ECRM Class I, II, and IIIA erosion co ntrol revegetative mats. TRM Class III B, C, and D turf reinforcement mats. 628.2.1.2 Product Acceptability
specifies, furnish pr oducts of the class, type, and subject to the seasonal limitati ons the department's PAL designates. Before installing a product from the department's PAL , submit to the engineer a written copy of the manufacturer' s specifications for installin g that product on slopes, channels, shorelines, high wind locations , and next to live traffic lanes as applicable to the contract installation. Install products from the department's PAL conforming to those manufacturer's specifications. The department may specify modificati ons to the manufacturer's proc edures for individual materials here within 628.
department's PAL prequalification requirements . Provide samples as the engineer directs. 628.2.2 Erosion Mat
from the department's PAL.
class and type of erosion mat t he plans show or the engineer sp ecifies. The contractor may furnish any prequalified erosion mat p roduct of the class and type the plans show or that the engineer specifies.
single jute yarn. Use a jute ya rn of loosely twisted constructi on with an average twist of not less than 1 1/2 turns per one inch. Ensure the average size of the warp and weft yarns are a pproximately the same. Furnish the woven fabric i n rolled strips. Submit a certi ficate of compliance certifying that the jute fabric erosion mat conforms to the following: - Is a minimum 48 inches wide with a tolerance of minus one inch. - Has 78 warp ends, +/- one for each 48 inches of width. Has 45 weft yarns, +/- 2, per linear yard of length. - Weighs 92 pounds per 100 square yards +/ - 10 percent, measure d under average atmospheric conditions. - Is non-toxic to vegetation. 628.2.3 Staples
material, are one to 2 inches wide, and not less than 6 inches long for firm soils and not less than 12 inches for loose soils. The contractor may use anchors the staple gun manufacturer recommends, either lighter gage staples or equivalent, for engineer-approve d staple gun systems. 628.2.4 Bales
the plans show. 628.2.5 Stakes
628.2.6 Silt Fence 628.2.6.1 Geotextile
nylon, polyethylene, or polyvinylidene chloride. For non-woven fabric the contractor may use needle punched, heat bonded, resin bonded, or combinations of all 3. S ubmit a certificate of compliance certifying that the geotextile conforms to the following: