Earthwork (200-299)

213Section 213

CO · 2023 Standard SpecificationsBook pages 279288View official source ↗

213.01 213-1 SECTION 213 MULCHING DESCRIPTION

213.01 This work consists of mulching the seeded areas, furnishing and placing wood chip

mulch in the planting beds and plant saucers, furnishing and applying hydromulch with tackifier on roadway ditches and slopes, furnishing and placing tackifier on mulch or soil on roadway ditches or slopes, an d furnishing and installing metal landscape border for the separation of planting beds, per the Contract or as directed. Mulching may be accomplished by the crimping method using straw or hay, by the hydraulic method using wood cellulose fiber mulch, or by other approved methods with approved materials. When a specific mulching method is required, it will be designated in the Contract. This work includes furnishing and applying spray -on mulch blanket or bonded fiber matrix on top of rock cuts and slopes after seeding or as temporary stabilization as shown on the plans or as directed by the Engineer. MATERIALS

213.02 Materials shall conform to the following requirements.

a.Mulching . Materials for mulching shall consist of Certified Weed Free field or marsh hay or straw of oats, barley, wheat, rye, or triticale certified under the Colorado Department of Agriculture Weed Free Forage Certification Program and inspected as regulated by the Weed Free Forage Act, Title 35, Article 27.5, CRS. Each certified weed free mulch bale shall be identified by one of the following:
1.One of the ties binding the bale shall consist of blue and orange twine, or
2.The bale shall have a regional Forage Certification Program tag indicating the Regional Forage Certification Program Number. Mulch shall be inspected for and Regionally Certified as weed free based on the Regionally Designated Noxious Weed and Undesirable Plant List for Colorado, Wyoming, Montana, Nebraska, Utah, Idaho, Kansas, and South Dakota. The Contractor shall not unload certified weed free mulch bales or remove their identifying twine, wire, or tags until the Engineer has inspected and accepted them. The Contracto r shall provide a transit certificate that has been filled out and signed by the grower and by the Department of Agriculture inspector. The Contractor may obtain a current list of Colorado Weed Free Forage Crop Producers who have completed certification by contacting the Colorado Department of Agriculture, Division of Plant Industry. Straw or hay in a stage of decomposition (discolored, brittle, rotten, or moldy) or old, dry mulch that breaks in the crimping process will not be accepted. The type and application rate of mulch material shall be as designated in the Contract. 213.02 213-2 (b) Wood Cellulose Fiber Mulch. Wood cellulose fiber mulch shall consist of virgin wood fibers manufactured expressly from clean whole wood chips. The chips shall be processed in such a manner as to contain no growth or germination inhibiting factors. Fiber shall not be produced from recycled materials such as sawdust, paper, cardboard, or residue from pulp and paper plants. The wood cellulose fibers of the mulch must maintain uniform suspension in water under agitation. Upon application, the mulch material shall form a blotter like mat covering the ground. This mat shall have the characteristics of moisture absorption and percolation and shall cover and hold seed in contact with the soil. The Contractor shall obtain certifications from suppliers that laboratory and field testing of their product has been accom plished, and that it meets all of the foregoing requirements pertaining to wood cellulose fiber mulch. The wood cellulose fiber mulch shall conform to the following requirements : Table 213-1 WOOD CELLULOSE FIBER MULCH REQUIREMENTS Property Requirement Percent moisture content 10.0% ± 3.0% Percent Organic Matter* (Wood Cellulose Fiber) 99.3% ± 0.2% Percent Ash Content* 0.7% ± 0.2% pH 4.9 ± 0.5 Water Holding Capacity* 1200-1600 grams** Table 213 -1 Notes: *Oven Dried Basis **Per 100 grams of fiber The wood cellulose fiber mulch shall be packaged in units containing current labels, with the manufacturer’s name, the net weight, and certification that the material meets the foregoing requirements for wood cellulose fiber mulch.
c.Mulch Tackifier. Material for mulch tackifier shall consist of a free -flowing, noncorrosive powder produced either from the natural plant gum of Plantago Insularis (Desert Indianwheat) or pre -gelatinized 100 percent natural corn starch polymer. The powders shall possess the following properties: Table 213-2 PROPERTIES OF PLANTAGO INSULARIS (DESERT INDIANWHEAT) Property Requirement pH 1% solution 6.5 - 8.0 213.02 213-3 Table 213-3 PROPERTIES OF PRE -GELATINIZED 100 PERCENT NATURAL CORN STARCH POLYMER Property Requirement Organic Nitrogen as protein 5.5-7% Ash content 0-2% Fiber 4-5% pH 1% solution 6.5 – 8.0 Size 100% thru 850 microns (20 mesh) Settleable solids <2% All fibers shall be colored green or yellow with a biodegradable dye. The material used for mulch tackifier shall not contain any mineral filler, recycled cellulose fiber, clays, or other substances that may inhibit germination or growth of plants. Water shall conform to subsection 209.02.
d.Wood Chip Mulch. Wood chip mulch shall consist of fresh, moist pole peelings material having approximate dimensions; Width: 1/4 to 1/2 inch; Length: 3 to 4 inches. The Contractor shall submit a sample to the Engineer for approval at least 30 days before placing on the project.
e.Metal Landscape Border. The metal landscape border shall consist of a strip of metal such as steel conforming to ASTM A1011 or approved equal.
f.Spray -on Mulch Blanket . Spray on mulch blanket shall be one of the following, unless otherwise shown on the plans:
1.Spray -on Mulch Blanket (Type 1) shall be a hydraulically applied matrix conform ing to the following: 213.02 213-4 Table 213-4 PROPERTIES OF MULCH BLANKET (TYPE 1) Properties Requirement Test Method Organic Fibers 71% Min. ASTM D2974 Cross Linked Mulch Tackifiers 10% ± 2% Min. Reinforcing Fibers 2.5% Min. Biodegradability 100% ASTM D5338 Ground Cover at Application Rate 90% Min. ASTM D6567 Functional Longevity 12 Months Min. Cure Time < 8 hours Application Application Rate 3000 lb/acre The organic fiber shall not contain lead paint, printing ink, varnish, petroleum products, seed germination inhibitors, or chlorine bleach. The organic fibers and reinforcing interlocking fibers cannot be produced from sawdust, cardboard, paper , or paper by- products.
2.Spray -on Mulch Blanket (Type 2) shall be a hydraulically applied matrix pre- packaged in 50-pound bags containing both a soil and fiber stabilizing compound and thermally processed wood fiber. The wood fiber mulch shall be manufactured through a thermo -mechanical defibrating process containing a specific range of fiber lengths averaging 0.25 inches or longer. 213.02 213-5 Mulch Blanket (Type 2) shall meet the following requirements: Table 213-5 PROPERTIES OF MULCH BLANKET (TYPE 2) Property Requirement Test Method Fiber Retention On 28 - Mesh Screen ≥ 40% Tyler Ro -Tap Method Moisture Content 12% ± 2% Total Air Dry Weight Basis Organic Matter 99.2% ± 0.2% Oven Dry Weight Basis Ash Content 0.8% ± 0.2% Oven Dry Weight Basis pH at 3% Consistency In Water 4.5-7.0 ± 0.5% Sterilized Weed -Free Yes Non-Toxic To Plant or Animal Life Yes Application Application rate 3,000 lb./acre The soil and fiber stabilizing compound shall be composed of linear anionic copolymers of acrylamide pre- packed within the bag having a minimum content of 1.0 percent. The compound shall conform to the following: Table 213-6 SOIL AND FIBER STABILIZING COMPOUND PROPERTIES Property Requirement Molecular Weight ≥ 12x106 Charge Density > 25% Non-Toxic To Plant or Animal Life Yes
g.Bonded Fiber Matrices (BFM). BFM shall consist of hydraulically -applied matrix with a minimum of 70 percent non -toxic thermally processed or refined long strand organic fibers and water soluble tackifier to provide erosion control and shall be designed to be functional for a minimum of 9 months. BFMs form an erosion -resistant blanket that promotes vegetation and prevents soil erosion. The BFM shall be 100 percent biodegradable. The binder in the BFM shall also be biodegradable. BFMs shall conform to the following requirements: 213.03 213-6 Table 213-7 BONDED FIBER MATRICES PROPERTIES Property Requirement Test Method Ground Cover (%) 95 ASTM D6567 Biodegradability (%) 100 ASTM D5338 functional Longevity (months) 9 months minimum Cure Time (hours) 24-48 Cross -linked Tackifier 10% minimum Application Application Rate (lbs./Acre) 3000 The fibers shall not contain lead paint, printing ink, varnish, petroleum products, seed germination inhibitors, or chlorine bleach. Fiber shall not be produced from sawdust, cardboard, paper, or paper by -products. CONSTRUCTION REQUIREMENTS 213.03
a.Hay or Straw Mulch ing. After seeding has been completed or when required for erosion control, hay or straw shall be uniformly applied, with no bare soil showing, at the rate designated in the Contract or as directed. It shall be crimped in with a crimper or other approved equ ipment. The Engineer may order hand -crimping on areas where mechanical methods cannot be used. The seeded area shall be mulched and crimped within four hours after seeding. Areas not mulched and crimped within four hours after seeding or before precipitation or damaging winds on site shall be reseeded with the specified seed mix at the Contractor's expense, before mulching and crimping. When tackifier is required in the Contract it shall be applied in the following order: (1) mulching, (2) mulch tackifier.
b.Hydraulic Mulch ing. Wood cellulose fiber mulch and mulch tackifier shall be added to water to form a homogeneous slurry. The operator shall spray apply the slurry mixture uniformly over the designated seeded area. Hydraulic mulching shall not be done in the presence of free surface water. Mixing procedure for the hydraulic mulch and tackifier mixture shall be as follows:
1.Fill tank with water approximately 1/4 full.
2.Continue filling while agitating with engine at full rpm.
3.Pour tackifier , at a moderate rate, directly into area of greatest turbulence. 213.03 213-7 4. With the recommended amount of tackifier in solution, add wood cellulose fiber mulch. Do not add fertilizer. Apply the hydromulch and tackifier mixture at the following rate: Wood Cellulose Fiber Mulch Tackifier 2,000 lb/acre 100 lb/acre
c.Mulch Tackifier . Mixing procedure for mulch tackifier shall be as follows:
1.Fill tank with desired amount of water and run engine at full R.P .M.
2.Add wood cellulose fiber. Agitate until a homogenous, non -lumpy slurry is formed. Do not add fertilizer.
3.Slowly sift powdered tackifier into slurry and continue to agitate for at least five minutes. Mulch tackifier shall be sprayed over hay or straw using a nozzle that will disperse the spray into a mist that will uniformly cover the mulch. Application Rate: Apply this as an overspray at the following rate or as approved by the Engineer. Mulch Tackifier Powder Wood Cellulose Fiber Water 200 lb/acre 300 lb/acre 2,000 gal acre
d.General . Mulch shall be tacked simultaneously or immediately upon completion of mulching and crimping to avoid nonuniform coverage. Areas not properly mulched, or areas damaged due to the Contractor's negligence, shall be repaired and remulched as described abo ve, at the Contractor's expense. Mulch removed by circumstances beyond the Contractor's control shall be repaired and remulched as ordered. Payment for this ordered corrective work shall be at the contract prices. The Engineer may order test sections be established for adjusting the mulching equipment to assure conformance with the specified application rate. The Engineer may order equipment readjustment at any time.
e.Wood Chip Mulch. A 4 -inch layer , unless otherwise shown in the plans, of wood chip mulch shall be uniformly applied to all planting beds as shown on the plans or as directed. Wood chip mulch shall be placed in all tree and shrub saucers in seeded areas. Wood chip mulch shall be capable of matting together to resist scattering by the wind.
f.Metal Landscape Border. Metal landscape border shall be installed along the lines and at the grades shown on the plans by an approved method that will not damage the border. Ends of metal landscape border shall overlap the next adjacent section a minimum of 6 inches. Metal lan dscape border shall be anchored with wire tie -downs at intervals of approximately 2 feet. Wire tie -downs shall be 9 -gauge wire at least 14 inches long. Metal landscape border shall be inserted into the ground by driving against the wire tiedowns; ground may be moistened to ease entrance into the ground. Driving on edge of metal landscape border will not be permitted except when the edge is properly shielded. Metal landscape border may be bent for sharp angles and overlapped at closure of perimeter. 213.04 213-8 (g) Spray -On Mulch Blanket. Spray -on mulch blanket installation shall strictly comply with the Manufacturer’s mixing recommendations and installation instructions. No chemical additives with the exception of fertilizer, soil pH modifiers, extended -term dyes and bio nutrients will be permitted. The spray -on mulch blanket shall be mixed and applied as follows: The hydromulching vessel shall be filled with water to at least 1/3 capacity (high enough to cover agitators) before adding any material. Continue to fill vessel with water and slowly add the fibers while agitators are in motion. Run agitators at 3/4 speed. Continue to mix tank a minimum of 10 minutes before application. Apply spray -on mulch blanket in a uniform application using a minimum 22 -degree arc type nozzle. Apply hydro slurry in two directions (from top of slope down and from toe of the slope up, as well as, be applied at a minimum of two layers). Co-polymer shall not be used use in channels, swales, or other areas where concentrated flows are anticipated and should not be used on saturated soils that have groundwater seeps.
h.Bonded Fiber Matrices (BFM). Bonded fiber matrices shall strictly comply with the Manufacturer’s mixing recommendations and installation instructions. No chemical additives with the exception of fertilizer, soil pH modifiers, extended -term dyes, and bio stimulant materials shall b e permitted. BFMs shall be applied in a uniform application using a minimum 22 -degree arc type nozzle. BFMs shall be applied in two directions (from top of slope down and from toe of the slope up, as well as, be applied at a minimum of two layers. Biodegradable BFMs shall not be applied immediately before, during, or immediately after rainfall if the soil is saturated. BFMs shall not be used use in channels, swales, or other areas where concentrated flows are anticipated and shall not be used on saturated soils that have groundwater seeps. Foot traffic, mechanical traffic or grazing shall not be permitted on treated areas until vegetated. Treated areas damaged due to circumstances beyond the Contractor’s control shall be repaired or re -applied as ordered. Payment for corrective work, when ordered, shall be at contract unit prices. METHOD OF MEASUREMENT

213.04 The quantity of hay and straw mulch, wood chip mulch, wood fiber and, spray -on

mulch blanket, bonded fiber matrix, and tackifier will not be measured but shall be the quantity designated in the Contract, except that measurements will be made for revisions requested by the Engineer, or for discrepancies of plus or minus five percent of the total quantity designated in the Contract. Measurement for acres will be by slope distances. The quantity of mulch tackifier to be measured will be the actual number of pounds of dry tackifier powder used. Metal landscape border will be measured by the linear foot of completed and accepted metal border. Measured length of metal landscape border will not include required overlap splices. 213.05 213-9 Spray -on mulch blanket and bonded fiber matrix will be measured by the acre or by the actual pounds of product applied, as shown on the plans. The area will be calculated on the basis of actual or computed slope measurements. The Contractor shall verify, before application, weight of spray on mulch blanket and bonded fiber matrix bags for certification of materials and application rate. BASIS OF PAYMENT

213.05 The accepted quantities will be paid for at the contract unit price for each of the pay

items listed below that appear in the bid schedule. Payment will be made under: Pay Item Pay Unit Mulching ( ) Acre Mulching (Hydraulic) Acre Mulching (Weed Free Hay) Acre Mulching (Weed Free Straw) Acre Mulching (Wood Chip) Cubic Foot Mulch Tackifier Pound Metal Landscape Border Linear Foot Spray -on Mulch Blanket Acre Spray -on Mulch Blanket Pound Bonded Fiber Matrix Acre Bonded fiber Matrix Pound Water, wood fiber, mixing and application for mulch tackifier will not be measured and paid for separately but shall be included in the work. Adjusting or readjusting mulching equipment will not be paid for separately but shall be included in the work. Payment for spray –on mulch blanket and bonded fiber matrix will be full compensation for all work and materials necessary to complete the item. 213.05 213-10 THIS PAGE INTENTIONALLY LEFT BLANK 214.01 214-1 Section 109SECTION 214 PLANTING DESCRIPTION

214.01 This work consists of furnishing all plants, labor, materials and equipment to install

herbaceous and woody plant material, hereinafter referred to as “nursery stock”. The work may also consist of obtaining live “unrooted cuttings” from approved donor pla nts and installing them on the site as shown on the plans. All approvals and direction required from the Engineer in this specification will involve the Engineer working directly with Region or Headquarters Environmental Staff, as identified in the Contract. MATERIALS

214.02 Nursery Stock and unrooted cuttings shall be of the minimum sizes and species as

designated on the plans, in healthy condition with normal well -developed branch and root systems and shall conform to the requirements of the American Standard for Nursery Stock (ANSI Z60.1- 2014). For specified deep rooted container stock the container class volume ranges shall be substituted with the requirements of this specification. See subsection 1.1.3.3 of the American Standard for Nursery Stock regarding unclassified c ontainers. All nursery stock and unrooted cuttings shall be free from plant diseases and insect pests. All shipments of plants shall comply with all nursery inspection and plant quarantine regulations of the State of origin and destination, and the Federal regulations governing Interstate movement of nursery stock. The Contractor shall submit proof of deposit that nursery stock, Contract species and Contract quantity have been secured 30 days post Environmental Pre -Construction Conference. For multi- year projects (t wo or more continuous years) the contractor shall submit a schedule for approval documenting when proof of deposits on nursery stock will be provided. The minimum acceptable sizes of all nursery stock, with branches in normal position, shall conform to the measurements specified in the Landscape/Mitigation Plans. Hardiness zones are defined in U.S. Department of Agriculture (USDA) 2012 Plant Hardiness Zone Map publications. Only Nursery Stock rated for USDA Hardiness Zones 2, 3, 4, and 5 will be accepted. Other than approved unrooted cuttings or as otherwise approved by the Engineer, plants shall be nursery grown for at least one growing season, or plants that have established themselves in accordance with definitions set forth in the Colorado Nursery Act, Title 35, Article 26, CRS. Field collected trees and shrubs shall have been root -pruned during their growing period in the nursery in accordance with standard nursery practice outlined in the American Standard for Nursery Stock.

Source: Colorado Standard Specifications for Road and Bridge Construction, 2023 Edition. Pages 279288 of 943.