Erosion Control

Description

208.01. This work consists of constructing, installing, maintaining, and removing when

required, control measures during the life of the Contract to prevent or minimize erosion, sedimentation, and pollution of any state waters as defined in subsection 101, including wetlands.

Stormwater runoff from all disturbed areas and soil storage areas, must flow to at least one control measure to minimize sediment in the discharge. This shall be accomplished through filtering, settling, or straining. The control measure shall be selected, designed, installed, and adequately sized per good engineering, hydrologic, and pollution control practices. The control measures shall contain or filter flows in order to prevent the bypass of flows without treatment and shall be appropriate for stormwater runoff from disturbed areas and for the expected flow rate, duration, and flow conditions (i.e., sheet or concentrated flow).

The Contractor shall coordinate the construction of temporary control measures with the construction of permanent control measures to assure economical, effective, and continuous erosion and sediment control throughout the construction period.

When a provision of Section 208 or an order by the Engineer requires that an action be immediate or taken immediately, it shall be understood that the Contractor shall at once begin affecting completion of the action and pursue it to completion in a manner acceptable to the Engineer, and per the Colorado Discharge Permit System Stormwater Construction Permit (CDPS- SCP) requirements.

Materials

208.02Erosion control materials are subject to acceptance per subsection 106.01. Erosion

control materials shall be subject to the following approval process:

208.02

Table 208-1 Approval Process for Erosion Control Materials Approval Material Notes Process The Contractor shall provide a transit certificate number, or a Erosion Bales (Weed Free) COC copy of the transit certificate as supplied from the producer. Silt Fence COC Silt Berm APL Erosion Log (Type 1, Type 2, and COC Type 3) Silt Dikes COC Prefabricated Concrete Washout Structures APL (above ground) Prefabricated Vehicle Tracking Pad APL Aggregate Bag COC Storm Drain Inlet Protection (Type APL I, II, and III) Table 208-1 Notes: COC = Certificate of Compliance; APL= Approved Product List

The material for control measures shall conform to the following:

(a)Erosion Bales: Material for erosion bales shall consist of Certified Weed Free hay or

straw. The hay or straw shall be certified under the Colorado Department of Agriculture Weed Free Forage Certification Program and inspected as regulated by the Weed Free Forage Act, Title 35, Article 27.5, CRS. Each certified weed free erosion bale shall be identified by blue and orange twine binding the bales. The Contractor shall not place certified weed free erosion bales or remove their identifying twine until the Engineer has inspected them.

The Contractor may obtain a current list of Colorado Weed Free Forage Crop Producers who have completed certification by contacting the Colorado Department of Agriculture, Weed Free Forage Program, 305 Interlocken Pkwy, Broomfield, CO 80021, Contact: Weed Free Forage Coordinator at (303) 869-9038. Also available at www.colorado.gov/ag/csd.

Bales shall be approximately 5 cubic feet of material and weigh at least 35 pounds. Stakes shall be wood and shall be 2 inch by 2 inch nominal.

208.02

(b)Silt Fence. Silt fence posts shall be wood with a minimum length of 46 inches. Wood posts

shall be 1.5-inch width by 1.5-inch thickness actual dimensions with 1/8-inch tolerance. Geotextile shall be attached to wood posts with three or more staples per post. Silt fence geotextile shall conform to the following requirements:

Table 208-2 Physical Requirements for Silt Fence Geotextiles Self- Supported Wire Fence Requirements Property Supported Test Method Geotextile Requirements Elongation <50% Grab Strength, 90 minimum 124 minimum ASTM D4632 lbs. Permittivity 0.05 0.05 ASTM D4491 sec-1 Minimum 70% Minimum 70% Ultraviolet Strength Strength ASTM D4355 Stability Retained Retained

(c)Silt Fence (Reinforced). Silt fence posts shall be metal "studded tee" T-post with a minimum

length of 66 inches. Metal posts shall be “studded tee” with .095-inch minimum wall thickness. Wire fabric reinforcement for the silt fence geotextile shall be a minimum of 14 gauge with a maximum mesh spacing of 6 inches. Geotextile shall be attached to welded wire fabric with ties or nylon cable ties at 12 inches on center at top, middle, and bottom wire. Welded wire fabric shall be attached to the post with a minimum three 12-gauge wire ties per post. Vinyl or rubber safety caps shall be installed on all T-post.

(d)Temporary Berms. Temporary berms shall be constructed out of embankment (subsoil) and

not out of salvaged topsoil.

(e)Temporary Slope Drains. Temporary slope drains shall consist of fiber mats, plastic sheets,

stone, concrete or asphalt gutters, half-round pipe, metal or plastic pipe, wood flume, flexible rubber, or other materials suitable to carry accumulated water down the slopes. Outlet protection riprap shall conform to Section 506. Erosion control geotextile shall be a minimum Class 2, conforming to subsection 712.08.

(f)Silt Berm. Silt berm shall consist of permeable multi-use material consisting of ultraviolet
(UV)stabilized high-density polyethylene or other approved material effective in reducing

water velocity. Designed and tested system shall be installed on a Turf Reinforcement Mat or Soil Retention Blanket per Section 216. The segment shall be secured to the ground with either metal or wood stakes. Minimum requirements for securing stakes shall be per the plans. Dimensions of individual segments shall meet the following criteria:

208.02

Table 208-3 Silt Berm Dimensions Width 6 - 11 inches Height 6 - 10 inches Weight > 0.25 lbs./sq. ft. Percent Open 20% – 50% Area

(g)Rock Check Dam. Rock Check dams shall be constructed of stone. Stone shall meet the

requirements of Section 506.

(h)Sediment Trap. In constructing an excavated sediment trap, excavated soil may be used

to construct the dam embankment, provided the soil meets the requirements of subsection 203.03. Outlet protection riprap shall be the size specified in the Contract and shall conform to Section 506. Erosion control geotextile shall be a minimum Class 1, conforming to subsection 712.08.

(i)Erosion Logs. Erosion logs, also known as sediment control logs, shall be one of the

following types unless otherwise shown on the plans:

1.Erosion Log (Type 1) shall consist of cylinder casings filled with curled aspen wood

excelsior with a consistent width of fibers evenly distributed throughout the log. The casing shall be seamless, photodegradable tube netting. The curled aspen wood excelsior shall be fungus free, resin free, and free of growth or germination inhibiting substances.

2.Erosion Log (Type 2) shall consist of cylinder casings filled with Erosion Log (Type 2)

Compost per subsection 212.02. The compost-wood chip blend may be pneumatically shot into a geotextile cylindrical casing or be pre-manufactured. The geotextile casing shall consist of high density polyethylene (HDPE) or polypropylene mesh (knitted, not extruded) with openings of 1/8 to 3/8 inch and contain the compost-wood chip material while not limiting water infiltration.

3.Erosion Log (Type 3) shall consist of cylinder casings filled with curled aspen wood

excelsior with a consistent width of fibers evenly distributed throughout the log. The casing shall be seamless, 100 percent natural fiber cylinder netting (compostable) and shall have minimum dimensions as shown in Table 208-4, based on the diameter of the log shown on the plans. Netting shall be a woven cotton or cellulose base mesh that has an approval to compost certification with a maximum mesh size of 0.075 inches and index values as shown in Table 208-5. The curled aspen wood excelsior shall be fungus free, resin free, and free of growth or germination inhibiting substances. Natural compostable fiber netting shall not contain any synthetic material woven into the netting such as polypropylene, nylon, polyethylene, or polyester dyes. Oxo- degradable or oxo-biodegradable petrochemical-based fiber shall not be part of the netting material. Burlap netting material shall not be used for Erosion Log (Type 3).

Erosion Log (Type 1, Type 2, and Type 3) shall have minimum dimensions as shown in Table 208-4, based on the specified diameter of the log.

208.02

Table 208-4

Erosion Log Dimensions

Diameter Type 1 Diameter Min. Max. Min. and 3 Type 2 Length Length Weight Stake Dimensions

(Inches)(Inches) (feet) (feet) (lb/ft) (Inches)

0.75 thickness by 9 8 10 180 1.6 0.75 width by 18 long 1.5 thickness by 1.25 12 12 10 180 2.5 width by 24 long 1.5 thickness by 1.25 20 18 10 180 4 width by 30 long Table 208-4 Notes: Wood stake acceptable tolerance +/- 1/8 inch. Table 208-5 Index Values for Natural Fiber Netting

Property Requirement Test Method

Fabric Tensile >70 lbs. ASTM D3822 Strength Biodegradable 100% ASTM D5988 Mesh Pattern Rib

Stakes to secure erosion logs shall consist of pinewood or hardwood.

(j)Silt Dikes. Silt dikes shall be pre-manufactured flexible sediment barrier that will fully

rebound when driven over by heavy equipment. Material shall consist of outer geotextile fabric covering closed cell urethane or polyethylene foam core. The geotextile fabric aprons shall extend beyond the foam core a minimum of 8 inches on both sides.

Table 208-6 Geotextile Requirements

Property Requirement Test Method

Water Flow Rate 100 - 150 gallons per minute/square foot ASTM D4491 Grab Breaking Load 200 lbs. minimum in each direction ASTM D4632 Ultraviolet 70% of original unexposed grab breaking ASTM D4595 Degradation load after 500 hours

Each silt dike segment shall have the following dimensions:

Dimension Length

208.02

Vertical height after installation >5 inches

Geotextile sleeve section to interlock >8 inches segments

Silt dike segments shall be anchored down using the minimum requirements shown in Table 208-7.

Table 208-7 Silt Dike Segment Requirements

Surface Nail Washers

Installed in 4-inch-deep trench with Soil Surface 6-inch nails no more than 4 feet O.C. 1-inch washers (on center) 1-inch washers 1-inch concrete nails no more than 4 and solvent-free Hard Surface feet O.C. adhesive

(k)Concrete Washout Structure. The Contractor shall construct a washout structure that

will contain washout from concrete and masonry placement, construction equipment cleaning operations, and residue from cutting, coring, grinding, grooving, and hydroconcrete demolition. Embankment required for the concrete washout structure may be excavated material, if this material meets the requirements of Section 203 for embankment. If the bottom of the excavated structure is within 5 feet of anticipated high ground water elevation or the soil does not have adequate buffering capacity to meet water quality standards, an impermeable synthetic liner shall be installed with the minimum properties shown in Table 208-8.

Table 208-8 Impermeable Synthetic Liner Requirements

Tested Property Test Method Units Value Thickness ASTM D5199 mil >30 +/- 1.5 Tear Strength ASTM D1004 lbs. >8 Low Temperature ASTM D1790 °F Pass at -20 Impact

208.02

(l)Prefabricated Concrete Washout Structure. Prefabricated Concrete Washout Structures shall

be one of the following types unless otherwise shown on the plans:

1.Prefabricated Concrete Washout Structure (Type 1). Type 1 portable bins shall be used

only when specified in the Contract. It shall consist of a watertight multi-use container designed to contain liquid concrete and masonry washout wastewater, solid residual concrete waste from washout operations, and residue from saw cutting, coring, grinding, grooving, and hydro-concrete demolition. Minimum capacity including freeboard shall be 440 gallons. Prefabricated Concrete Washout Structure (Type 2). Type 2 portable bins shall be used only when specified in the Contract. It shall consist of a watertight one- time use container designed to contain liquid concrete washout wastewater, solid residual concrete waste from washout operations, and residue from saw cutting, coring, grinding, grooving, and hydro-concrete demolition. The structure shall have a system to secure to the ground. Minimum capacity including freeboard shall be 50 gallons.

(m)Vehicle Tracking Pad (VTP). Aggregate for the vehicle-tracking pad shall be crushed natural aggregate with at least two fractured faces that meets the following gradation requirements:

Table 208-9 Aggregate Gradation for Vehicle Tracking Pad Sieve size Percent by weight Passing Square Mesh Sieves 75 mm (3 inch) 100 50 mm (2 inch) 0-25 19.0 mm (3/4 0-15 inch)

Recycled crushed concrete or asphalt shall not be used for vehicle tracking pads.

Erosion control geotextile shall be a minimum Class 2, conforming to subsection 712.08.

Prefabricated or manufactured vehicle tracking pads shall only be used if specified in the Contract. Multi-use pads shall consist of industrial grade materials and shall be designed to minimize sediment leaving the project.

Minimum dimensions of the modular systems shall be:

Table 208-10 Minimum Dimensions for Vehicle Tracking Pad Width 12 feet Length of pad 35 feet Weight (min.) (lbs./sq. ft.) 8 Crush strength (min.) (psi) 400

208.02

To accommodate construction traffic turning radii between the tracking pad and a stabilized surface, additional flared sections of approved pads or aggregate per this specification shall be used at no additional cost to CDOT.

If pads weigh less than 8 pounds per square foot, an anchoring system approved by the manufacturer shall be used for pads placed on soil and hard surfaces.

A thin layer of stone, geotextile, or other stable surface may be required to stop rutting under the pad or area where the vehicles mount or dismount the manufactured trackout control device.

(n)Aggregate Bag. Aggregate bags shall consist of crushed stone or recycled rubber filled

fabric with the following properties:

Table 208-11 Aggregate Bag Properties

Diameter Weight

(inches)(minimum)

(lb/ft) 6-8 6 10 10 12 15

Rubber used in bags shall be clean, 95 percent free of metal and particulates.

Crushed stone contained in the aggregate bags shall conform to Table 703-1 for Coarse Aggregate No. 6.

The aggregate bag shall consist of a woven geotextile fabric with the following properties:

Table 208-12 Geotextile Properties for Aggregate Bag

Property Requirement Test Method Grab Tensile Strength 90 lbs. min. ASTM D4632 Trapezoid Tear Strength 25 lbs. min. ASTM D4533 Mullen Burst 300 psi ASTM D3786 Ultraviolet Resistance 70% ASTM D4355

(o)Storm Drain Inlet Protection. Storm drain inlet protection shall consist of aggregate

filled fabric with the following dimensions:

208.02

Table 208-13 Aggregate Bag Dimensions for Storm Drain Inlet Protection

Storm Drain Inlet *Protection #Protection ^Protection Protection Properties Type I Type II Type III Diameter 4 in. 4 in. N/A Minimum Section 7 ft. 5 ft. 5 ft. Length Apron Insert --- 30 in. or 30 in. or sized to sized to grate grate Table 208-13 Notes: *Type I protection shall be used with Inlet Type R. #Type II protection shall be used with Combination Inlet. Option A or B ^Type III protection shall be used with Vane Grate Inlet only. Option A or B Note: Options A and B are shown on Standard Plan M-208-1.

The Storm Drain Inlet Protection (Type I, II, and III) shall consist of a woven geotextile fabric with the following properties: Table 208-14 Woven Geotextile Fabric for Storm Drain Inlet Protection

Property Test Unit Requirement Method Grab tensile ASTM D4632 lbs. minimum strength 150x200 Mullen Burst ASTM D3786 lbs. 400 Strength Trapezoid Tear ASTM D4533 lbs. minimum Strength 60x60 Percent Open COE-22125- % ≥20 Area 86 Water Flow Rate ASTM D4491 gal./min./sq. ≥100 ft. Ultraviolet ASTM D4355 % ≥70 Resistance

Curb roll for Storm Drain Inlet Protection (Type I and II) shall have a weight greater than 4 pounds per linear foot of device. The device shall be capable of conforming to the shape of the curb. Aggregate contained in the storm drain inlet device shall consist of gravel or crushed stone conforming Table 703-1 for Coarse Aggregate No. 6.

208.03

Construction Requirements

208.03Project Review, Schedule, and Erosion Control Management. Before construction,

an on-site Environmental Preconstruction conference shall be held. The conference shall be attended by:

(1)The Engineer.
(2)The Superintendent.
(3)The Contractor's Stormwater Management Plan (SWMP) Administrator. The SWMP

Administrator is equivalent to the CDPS-SCP Qualified Stormwater Manager.

(4)Supervisors or Foremen of subcontractors working on the project.
(5)The Region Water Pollution Control Manager (RWPCM).
(6)CDOT personnel (e.g., CDOT Landscape Architect) who prepared or reviewed the

Stormwater Management Plan (SWMP). At this Conference, the attendees shall discuss the SWMP, CDPS-SCP, sensitive habitats on- site, wetlands, other vegetation to be protected, and the enforcement mechanisms for not meeting the requirements of this specification.

Before beginning construction, the Contractor shall evaluate the project site for stormwater draining into or through the site. When such drainage is identified, control measures shall be used if possible, to divert stormwater from running on-site and becoming contaminated with sediment or other pollutants. The diversion may be accomplished with a temporary pipe or other conveyance to prevent water contamination or contact with pollutants. Run- on water that cannot be diverted shall be treated as construction runoff and adequate control measures shall be employed.

The SWMP Administrator shall evaluate all non-stormwater coming onto the site, such as springs, seeps, and landscape irrigation return flow. If such flow is identified, control measures shall be used to protect off-site water from becoming contaminated with sediment or other pollutants.

The SWMP Administrator shall review existing inlets and culverts to determine if inlet protection is needed due to water flow patterns. Before beginning construction, inlets and culverts needing protection shall be protected and the location of the implemented control measure added to the SWMP Site Map.

Before construction, the Contractor shall implement appropriate control measures for protection of wetlands, sensitive habitat, and existing vegetation from ground disturbance and other pollutant sources, per the approved project schedule as described in subsection

(b). Upgradient control measures shall be installed immediately adjacent to

vegetative buffers.

When additional control measures are required and approved by the Engineer, the Contractor shall implement the additional control measures and the SWMP Administrator shall record and describe them on the SWMP Site Map. The approved control measures will be measured and paid for per subsections 208.11 and 208.12.

208.03

(a)Project Review. The Contractor may submit modifications to the Contract’s control

measures in a written proposal to the Engineer. The written proposal shall include the following information:

1.Reasons for changing the control measures.
2.Diagrams showing details and locations of all proposed changes.
3.List of appropriate pay items indicating new and revised quantities.
4.Schedules for accomplishing all erosion and sediment control work.
5.Effects on permits or certifications caused by the proposed changes.

The Engineer will approve or reject the written proposal in writing within seven days after receipt of the submittal. The Engineer may require additional control measures before approving the proposed modifications. Additional modifications and additional control measures will be paid for at the Contract Unit Price for the specific items involved. If no items exist, they will be paid for as extra work per subsection 109.04.

(b)Erosion and Sediment Control Activities. The erosion and sediment control activities shall

be included in the weekly meeting update. The project schedule shall specifically indicate the sequence of clearing and grubbing, earthwork operations, and construction of temporary and permanent erosion control features and stabilization. Temporary control measures shall be installed prior to commencing construction activities associated with water quality. The project schedule shall include erosion and sediment control work for haul roads, borrow pits, storage and asphalt or concrete batch sites, and all areas within the LOC. If during construction the Contractor proposes changes that would affect the Contract's control measures, the Contractor shall propose revised control measures to the Engineer for approval in writing. If necessary, the SWMP Administrator shall update proposed sequencing of major activities in the SWMP. Revisions shall not be implemented until the proposed measures have been approved in writing by the Engineer.

(c)Erosion Control Management (ECM). Erosion Control Management for this project shall

consist of SWMP administration and assessment of site conditions. All ECM staff shall have working knowledge and experience in construction and shall hold a current Transportation Erosion Control Supervisor Certification (TECS) as provided by the Department. The Superintendent cannot serve in an ECM role. The Erosion Control Inspector (ECI) and the SWMP Administrator may be the same person in projects with not more than 40 acres of disturbed area. The ECI and the SWMP Administrator are equivalent to the CDPS-SCP Qualified Stormwater Manager.

ECM staff shall implement and maintain control measures in effective operating condition. At any time, regardless of the inspection schedule, CDOT or the Contractor shall identify control measures requiring corrective action. Identified noncompliance shall be corrected immediately, but no later than 2 calendar days from the time of observation. Discharges outside of the LOC or spills occurring within the project shall be addressed upon observation.

1.SWMP Administration. The SWMP Administrator shall maintain the SWMP. Record the

name of the SWMP Administrator on the SWMP. The SWMP Administrator shall have full responsibility to maintain and update the SWMP and identify to the Superintendent critical action items needed to conform to the CDPS-SCP as follows:

208.03

A.Complete the SWMP as described in subsection 208.03(d). Initial and date changes

to the SWMP.

B.Participate in the Environmental Pre-construction Conference.
C.Attend weekly meetings.
D.Attend all Department-led Monthly Audit Reports (MARs). The Contractor and the

Contractor’s SWMP Administrator will be notified a minimum of five days in advance of each MAR.

E.Coordinate with the Superintendent to implement necessary actions to reduce

anticipated or presently existing water quality or erosion problems resulting from construction activities.

F.Coordinate with the Superintendent to ensure that all labor, material, and

equipment needed to install, maintain, and remove control measures are available as needed.

G.During construction, update the Site Map to reflect current site conditions, initial,

date, and describe changes. Site Maps shall include, at a minimum, the following:

(1)Limits of Construction (LOC).
(2)Areas of Disturbance (AD), including areas of borrow and fill.
(3)Limits of Disturbed Area (LDA).
(4)Areas used for storage of construction materials, equipment, soils, or wastes.
(5)Location of dedicated asphalt, concrete batch plants, and masonry mixing

machines.

(6)Location of field offices and staging areas.
(7)Location of work access routes during construction.
(8)Location of waste storage areas, including areas for liquid, concrete, masonry,

and asphalt.

(9)Location of daily, temporary, and permanent stabilization.

(10)Location of outfalls. (11)Flow arrows that depict stormwater flow directions on-site and runoff direction. (12)Location of structural and non-structural control measures. (13)Location of springs, streams, wetlands, diversions, and other state waters, within or bordering the site, including areas that require pre-existing vegetation be maintained within 50 horizontal feet of a receiving water, unless infeasible. (14)Location of stream crossings located within the LOC.

(15)A clear and legible map legend or control measure key with symbology that

applies uniformly across all Site Maps. (16)Protected trees, shrubs, mature vegetation, and cultural resources. (17)Locations of pumped stormwater including intake and discharge points. (18)Locations of dewatering activities covered under the CDPS-SCP, low risk guidance, or other dewatering permit.

H.The SWMP shall reflect the site conditions and shall be amended to reflect control

measures, including the following:

208.03

(1)A change in design, construction, operation, or maintenance of the site that would

require the implementation of new or revised control measures; or

(2)Changes when the SWMP proves to be ineffective in achieving the general

objectives of controlling pollutants in stormwater discharges associated with construction activity.

(3)Changes when control measures are no longer necessary and are removed.
I.Complete vegetative survey transects when required per CDOT Erosion Control and

Stormwater Quality Guide.

J.Start a new Site Map before the current one becomes illegible. All Site Maps shall

remain as part of the SWMP.

K.Document all inspections and corrective actions. Keep the SWMP and documentation

on the project site.

L.Add a narrative when adding or revising control measures in the SWMP, including

drawings, dimensions, installation information, materials, implementation processes, control measure-specific inspection expectations, and maintenance requirements of the control measure. Non-standard details must be approved by the Engineer prior to installation.

M.If using existing topography (landform), vegetation, etc. as a control measure, label it

as such on the Site Map; add a narrative as to when, where, why, and how the control measure is being used.

N.Indicate control measures in use or not in use by recording them on Standard Plans M-

208-1 and M-216-1 in the SWMP.

O.Record on the SWMP the approved Method Statement for Containing Pollutant

Byproducts.

P.Update the potential pollutants list in the SWMP and Spill Response Plan throughout

construction.

2.Erosion Control Inspector.

One ECI is required for every 40 acres of total disturbed area that is currently receiving daily and temporary stabilization as defined in subsection 208.04(e). An ECI shall not be responsible for more than 40 acres in the project. Accepted permanent stabilization methods as defined in subsection 208.04(e) will not be included in the 40 acres.

Coordinate with the SWMP Administrator on the results of Form 1176 Inspections.

The ECI duties include the following inspection responsibilities:

A.Form 1176 Inspections

The ECI shall conduct Form 1176 Inspections every seven days at a minimum. Form 1176 Inspections shall be conducted before commencing construction activities associated with water quality. Inspection types include:

(1)Routine Form 1176 Inspection. Conduct with the Superintendent and the Engineer, or

their designated representatives, all areas noted in subsection 208.03(c)2.B.

208.03

When a MAR is conducted that meets all requirements of subsection 208.03(c)2.B, it may be counted as a Routine Form 1176 Inspection. If any portion of the requirements listed in subsection 208.03(c)2.B are not met by the MAR, a Routine Form 1176 Inspection shall be conducted to address the remaining requirements. The ECI shall document in the Corrective Action Log of the Form 1176 that a MAR occurred.

(2)Winter Conditions. Routine Form 1176 Inspections are not required at sites when

all of the following conditions are met: i Construction activities associated with water quality are temporarily halted ii Snow cover exists over the entire site for an extended period (i.e. high- elevation winter season)

iii Melting conditions posing a risk of surface erosion do not exist.

The winter conditions exception is applicable only during the period where melting conditions do not exist and applies to the Form 1176 Inspections. When this inspection exclusion is implemented, the following information must be documented on Form 1176: dates when snow cover existed, date when construction activities ceased, and date melting conditions began.

B.Form 1176 Inspection Points
(1)Form 1176 Inspections and post-storm inspections shall include inspection of

the following areas for evidence of, or the potential for, pollutants leaving the LOC, entering the stormwater drainage system, or discharging to state waters: i Construction site perimeter. ii All disturbed areas, including areas that are temporarily stabilized. iii Designated haul routes. iv Material and waste storage areas exposed to precipitation. v Locations where stormwater has the potential to discharge offsite. vi Locations where vehicles exit the site. vii Locations of pumped stormwater, including all intake and discharge points. viii Staging Areas.

(2)While inspecting, evaluate and document on the Form 1176:

i Visually verify whether all implemented control measures are in effective operational condition and are working as designed in their specifications to minimize pollutant discharges. ii Determine if there are new potential sources of pollutants. iii Assess the adequacy of control measures at the site to identify areas requiring new or modified control measures to minimize pollutant discharges. iv Identify all areas of non-compliance with the CDPS-SCP requirements and, if necessary, implement corrective action per the CDPS-SCP.

208.03

v When pumped stormwater discharges offsite, assess the adequacy of control measures for pumped stormwater (for example, sediment plume, suspended solids, unusual color, decreased clarity, presence of odor or foam, or other evidence of pollutants).

C.Inspection Documentation

Form 1176 (Stormwater Field Inspection Report – Active Construction) shall be used for all Form 1176 Inspections. The ECI shall fill out the Form 1176 in full.

During inspection, the ECI shall note any findings on the Form 1176’s Corrective Action Log. The Corrective Action Log shall note in the appropriate column: findings, location, control measure being assessed, finding type (additional, repair, or remove), and a description of the corrective action needed. When additional line items for multiple findings are needed, print out additional Correction Actions Logs from the Form 1176.

Any finding not completed from the previous Form 1176 Inspection shall be noted on the current Form 1176 as a current action item.

Compliance Certification on Form 1176 shall be signed when all corrective actions are noted as corrected or if no findings are noted on the Form 1176 Inspection.

D.Corrective Actions and Interim Responses

When addressing findings noted in section 208.03(c)2.C, note all corrective actions on the Form 1176 Corrective Action Log.

(1)Corrective Action Response Time. All findings noted on Form 1176 shall be

corrected immediately, but no later than 2 calendar days from the time of observation. Findings associated with discharges outside of the LOC or spills occurring within the project shall be addressed immediately upon observation. The ECI shall document the completion date of each corrective action on the Form 1176 Corrective Action Log.

(2)When a finding cannot be completed immediately within the Corrective Action

Response Time of 2 calendar days, an Interim Action Response Plan shall be submitted to the Engineer for each finding under consideration. The Interim Action Response Plan shall include: i Individual finding that is being requested for Interim Action Response ii Reason why each finding cannot be corrected within the Corrective Action Response Time iii Additional control measures to be implemented until each finding is corrected and accepted. iv Milestones to measure progress toward completion and projected corrective completion dates for each finding. The Department will discuss the Interim Action Response Plan request and may meet with the Superintendent to recommend modifications to the plan. The Engineer will initial and date each line item on the Form 1176’s Corrective Action Log when the plan is accepted.

208.03

Preparation of Interim Action Response Plan documentation and additional materials, including additional control measures, required to complete the plan shall be at the Contractor’s expense. The Corrective Action Response Time in

(c)2.D.1 must be met unless the Interim Action Response Plan is

approved.

E.Noncompliance Reporting. The Contractor shall immediately report the following

circumstances to the CDOT Project Engineer. The Department will notify the Contractor if the incident requires reporting to CDPHE-WQCD. When directed by the Department to report, the Contractor shall notify CDPHE-WQCD immediately, but no later than 24 hours from the time of observation. The Contractor shall be responsible for all follow-up correspondence, requirements, and timelines noted within the CDPS-SCP. Reportable circumstances include:

(1)Noncompliance that may endanger health or the environment, regardless of the

cause of the incident.

(2)Unanticipated bypass that exceeds any effluent limitations per the CDPS-SCP.
(3)Upset conditions that causes an exceedance of any effluent limitation per the

CDPS-SCP.

(4)Daily maximum violations for any of the pollutants limited by the CDPS-SCP.

This includes any toxic pollutant or hazardous substance, or any pollutant specifically identified as the method to control any toxic pollutant or hazardous substance.

F.Upon observation, spills, leaks, or overflows must immediately be contained and

disposed of properly. Document spills, leaks, or overflows that result in the discharge of pollutants. The ECI shall record the time and date, weather conditions, reasons for spill, and how it was remediated.

(d)Documentation Available on the Project. The following Contract documents and

references will be made available for reference at the CDOT field office during construction:

1.SWMP. The Engineer will provide an approved SWMP design at the Pre-construction

Conference, which shall remain the property of CDOT. The SWMP shall be available upon request to CDPHE-WQCD, EPA, or CDOT. Before construction, CDOT will provide the documentation for SWMP Tabs (1) through (4), and (18) as listed below. The Contractor shall provide the contents required for items (5) through (17). The SWMP shall be stored in the CDOT field office or at another on-site location approved by CDPHE-WQCD. The SWMP Administrator shall modify and update the SWMP as needed to reflect actual site conditions , within two calendar days of the change. The following Contract documents and reports shall be kept, maintained, and updated in the SWMP under the appropriate items by the SWMP Administrator:

A.(Tab 1) SWMP Plan Sheets – Notes, tabulation, site description. The SWMP site

description shall include, at a minimum, the following:

(1)The nature of the construction activity at the site, including if it is a public

emergency related site.

(2)The proposed schedule for the sequence for major construction activities and the

planned implementation of control measures for each phase (clearing, grading, utilities, vertical, etc.).

208.03

(3)Estimates of the total acreage of the site, and the acreage expected to be disturbed

by clearing, excavation, grading, or any other construction activities.

(4)A description of the erodibility of identified soil types and a summary of any existing

data used in the development of the construction site plans or SWMP that describe the soil or existing potential for soil erosion.

(5)A description of the percent of existing vegetative ground cover relative to the entire

site and the method for determining the percentage, per CDOT Erosion Control and Stormwater Quality Guide.

(6)A description of any allowable non-stormwater discharges at the site, including those

being discharged under a CDPHE-WQCD low risk discharge guidance policy.

(7)A description of areas receiving discharge from the site. Including a description of

the immediate source receiving the discharge. If the stormwater discharge is to a municipal separate storm sewer system (MS4), the name of the entity owning the system, the location of the storm sewer discharge, and the ultimate receiving water(s).

(8)A description of all stream crossings located within the LOC.
B.(Tab 2) Site Maps and Project Plan Title Sheet.
C.(Tab 3) Specifications – Standard and project special provisions related to stormwater

and erosion control.

D.(Tab 4) Standard Plans M-208-1 and M-216-1.
E.(Tab 5) Control Measure Details not in Standard Plan M-208-1 or M-216-1– Non-standard

details.

F.(Tab 6) Weekly meeting sign-in sheet and weekly meeting notes.
G.(Tab 7) Calendar of Inspections – Calendar of inspections marking when all Form 1176

Inspections and MARs take place.

H.(Tab 8) Contractor Stormwater Field Inspection Reports (Forms 1176 and 1177).
I.(Tab 9) All Monthly Audit Reports (MAR) and Form 105(s) relating to Water Quality.
J.(Tab 10) Description of Inspection and Maintenance Methods – Description of inspection

and maintenance methods implemented at the site to maintain all control measures identified in the SWMP and items not addressed in the design.

K.(Tab 11) Spill Response Plan – Reports of reportable spills submitted to CDPHE-WQCD.
L.(Tab 12) List and Evaluation of Potential Pollutants – List of potential pollutants as

described in subsection 107.25 and approved Method Statement for Containing Pollutant Byproducts.

M.(Tab 13) Other Correspondence including agreements with other MS4s, approved deferral

request, CDPHE-WQCD audit documentation, Water Quality Permit Transfer to Maintenance Punch List, and other miscellaneous documentation such as documented use agreements for areas outside of the permitted area.

N.(Tab 14) TECS Certifications of the SWMP Administrator and all ECIs, kept current through

the life of the project.

208.03

O.(Tab 15) Environmental Pre-construction Conference – Conference agenda with a

certification of understanding of the terms and conditions of the CDPS-SCP and SWMP. All attendees shall sign the certification. A certification shall also be signed by all attendees of meetings held for new subcontractors beginning work on the project that could adversely affect water quality after the Environmental Pre-construction Conference has been held.

P.(Tab 16) Project Environmental Permits – All project environmental permits and

associated applications and certifications, including: CDPS-SCP, USACE 404, temporary stream crossings, dewatering, biological opinions, emergency projects, low risk discharge guidance, and all other permits applicable to the project, including any separate CDPS-SCP obtained by the Contractor for staging areas on private property, asphalt or concrete batch plants.

Q.(Tab 17) Photographs Documenting Existing Vegetation – Project photographs shall

include the following information with the record: project number, project code, name of the person who took the picture, date and time the picture was taken, and location and approximate station number or mile marker. The Contractor shall submit photographs documenting existing vegetation, before construction commencing, on paper with a maximum of four colored images per side of 8 1/2 inch by 11-inch sheet or a digital copy on CD-ROM/Flash Drive (JPG format) as directed by the Engineer.

R.(Tab 18) Permanent Water Quality Plan Sheets – Plan sheets and specifications for

permanent water quality structures and riprap.

The Engineer will incorporate the documents and reports available at the time of award. The Contractor shall provide and insert all other documents and reports as they become available during construction. The SWMP Administrator shall finalize the SWMP for CDOT Maintenance use upon completion of the project. The Engineer shall approve SWMP completeness. Corrections to the SWMP shall be made at the Contractor’s expense.

2.Reference Materials. The following Reference materials shall be used:
(1)CDOT Erosion Control and Stormwater Quality Guide.
(2)CDOT Erosion Control and Stormwater Quality Field Guide.
(e)Weekly Meetings: The Engineer, the Superintendent, and the SWMP Administrator shall

conduct a weekly meeting with supervisors involved in construction activities associated with water quality. The meeting shall follow an agenda prepared by the Engineer, or a designated representative, and have a sign-in sheet recording the names of all attendees. The SWMP Administrator shall take notes of water quality comments and action items at each weekly meeting and place the agenda and sign-in sheet in the SWMP. At this meeting the following shall be discussed and recorded in Tab 6 of the SWMP:

(1)Recalcitrant, chronic, and severe MAR findings.
(2)Unresolved issues from previous Form 1176 Inspections and/or MARs.
(3)Requirements of the SWMP.
(4)Problems that may have arisen in implementing the site specific SWMP or maintaining

control measures.

(5)Control measures that are to be installed, removed, modified, or maintained, and

associated SWMP modifications.

208.04

(6)Planned activities that will affect stormwater in order to proactively phase control

measures. All subcontractors not in attendance at the Environmental Pre-construction Conference shall be briefed on the project by the Engineer, Superintendent, and the SWMP Administrator before start of work. The SWMP Administrator shall record the names of these subcontractors as an addendum to the list of attendees and add it to the SWMP.

208.04Control Measures for Stormwater. The SWMP Administrator shall modify the SWMP to

clearly describe and locate all control measures implemented at the site to control potential sediment discharges. Vehicle tracking pads shall be used at all vehicle and equipment exit points from the site to prevent sediment exiting the LOC of the project site. Access shall be provided only at locations approved by the Engineer. The SWMP Administrator shall record vehicle tracking pad locations on the Site Map. New inlets and culverts shall be protected during their construction. Appropriate protection of each culvert and inlet shall be installed immediately. When riprap is called for at the outlet of a culvert, it shall be installed within 24 hours of completion of each pipe. The Contractor shall remove sediment, millings, debris, and other pollutants from within the newly constructed drainage system per the CDPS-SCP, before use, at the Contractor’s expense. All removed sediment shall be disposed of outside the LOC per all applicable regulations. Concrete or masonry products wasted on the ground during construction including, but not limited to, excess concrete removed from forms, spills, slop, and all other unused concrete or masonry are potential pollutants that shall be removed from the site or contained at a preapproved containment area that has been identified in the SWMP. The concrete or masonry shall be picked up and recycled per 6 CCR 1007-2 (CDPHE Regulations Pertaining to Solid Waste Sites and Facilities) at regular intervals, as needed, or as directed by the Engineer. The uses of recycled concrete from permitted recycling facilities shall be per Section 203.

(a)Unforeseen Conditions. The Contractor shall design and implement erosion and sediment

control measures for correcting conditions unforeseen during the design of the project, or for emergency situations, that develop during construction. The Department’s Erosion Control and Stormwater Quality Guide shall be used as a reference document for the purpose of designing erosion and sediment control measures. Measures and methods proposed by the Contractor shall be reviewed and approved in writing by the Engineer before installation.

(b)Other Agencies. If CDPHE-WQCD, US Army Corps of Engineers (USACE), the Environmental

Protection Agency (EPA), or a Local Agency reviews the project site and requires additional measures to prevent and control erosion, sediment, or pollutants, the Contractor shall cease and desist activities resulting in pollutant discharge and immediately implement these measures. If the work may negatively affect another MS4, the Contractor shall cease and desist activities resulting in the discharge and shall implement appropriate measures to protect the neighboring MS4, including installing additional measures. Implementation of these additional measures will be paid for at contract unit prices.

208.04

(c)Work Outside the Right of Way. Disturbed areas, including staging areas, that are

outside CDOT ROW and outside easements acquired by CDOT for construction, are the responsibility of the Contractor. These areas shall be subject to a separate CDPS-SCP and all other necessary permits, as they are considered a common plan of development if within a 1/4 mile of the construction site. The Contractor shall acquire these permits and submit copies to the Engineer before any disturbance. These permits shall be acquired, and all erosion and sediment control work performed at the Contractor's expense. These areas are subject to audits by CDOT or any other agency, as agreed upon in writing. A documented use agreement between the permittee and the owner or operator of any control measures located outside of the LOC that are utilized by the permittee’s construction site for compliance with the CDPS-SCP, but not under the direct control of the permittee shall be placed in the project’s SWMP.

(d)Construction Implementation. The Contractor shall incorporate control measures into the

project as outlined in the accepted schedule.

(e)Stabilization. Once earthwork has started, the Contractor shall maintain erosion control

measures until permanent stabilization of the area has been completed and accepted. Failure to properly maintain erosion control and stabilization methods, either through improper phasing or sequencing will require the Contractor to repair or replace sections of earthwork at the Contractor’s expense. The Contractor shall schedule and implement the following stabilization measures during the course of the project:

1.Daily Stabilization. At the end of each working day, the Contractor shall stabilize

disturbed areas by surface roughening, vertical tracking, or a combination thereof. Disturbed areas are locations where actions have been taken to alter the existing vegetation or underlying soil of a site, such as clearing, grading, roadbed preparation, soil compaction, and movement and stockpiling of sediment and materials. Designated topsoil distributed on the surface or in stockpiles shall not receive daily stabilization. Other stabilization measures may be implemented, as approved. The maximum area of daily stabilization (excluding areas of designated topsoil) shall not exceed 20 acres.

2.Temporary Stabilization. Temporary stabilization shall be implemented for earth

disturbing activities on any portion of the site where construction activities associated with water quality have permanently or temporarily ceased for more than 14 calendar days. These areas shall be stabilized using one or more of the following methods:

A.Application of 1.5 tons per acre of mechanically crimped certified weed free hay

or straw in combination with an approved organic mulch tackifier.

B.Placement of bonded fiber matrix per Section 213.
C.Placement of mulching (hydraulic) wood cellulose fiber mulch with tackifier, per
D.Application of spray-on mulch blanket per Section 213. Magnesium Chloride,

Potassium Chloride, and Sodium Chloride or other salt products shall not be used as a stabilization method.

E.Topsoil stockpiles shall receive temporary stabilization unless specified per Section

207 as a different material than the other disturbed areas on-site.

208.04

3.Summer and Winter Stabilization. Summer and winter stabilization is defined as

stabilization during months when seeding is not permitted. As soon as the Contractor knows shutdown is to occur, temporary stabilization shall be applied to the disturbed area. Protection of the temporary stabilization method is required. Reapplication of temporary stabilization may be required as directed.

4.Permanent Stabilization. Permanent stabilization is defined as the covering of disturbed

areas with topsoil, seeding, mulching with tackifier, soil retention coverings, and such non-erodible methods as riprap, road shouldering, etc., or a combination as required by the Contract. Other permanent stabilization techniques may be proposed by the Contractor, in writing, and shall be used if approved in writing by the Engineer. Permanent stabilization requirements shown on the plans shall be completed within four working days of the placement of the topsoil per Section 207.

5.Final Stabilization. Final stabilization is achieved when all ground-disturbing activities at

the site have been completed, and uniform vegetative cover has been established with an individual plant density of at least 70 percent of predisturbance levels, or equivalent permanent physical erosion reduction methods have been employed.

(f)Maintenance. Erosion and sediment control practices and other protective measures

identified in the SWMP as control measures for stormwater pollution prevention shall be maintained in effective operating condition until the CDPS-SCP has been transferred to CDOT. Control measures shall be continuously maintained per good engineering, hydrologic, and pollution control practices, including removal of collected sediment when silt depth is 50 percent or more of the effective height of the erosion control device. When possible, the Contractor shall use equipment with an operator rather than labor alone to remove the sediment. Maintenance of erosion and sediment control devices shall include replacement of such devices upon the end of their useful service life as recommended by the Contractor and approved by the Engineer. Maintenance of rock check dams and vehicle tracking pads shall be limited to removal and disposal of sediment or addition of aggregate. Damages resulting from failure to maintain control measures shall be repaired at the Contactor’s expense.

Complete site assessment shall be performed as part of comprehensive inspection and maintenance procedures to assess the adequacy of control measures at the site and the necessity of changes to those control measures to ensure continued effective performance. Where site assessment results in the determination that new or replacement control measures are necessary, the control measures shall be installed to ensure continuous effectiveness. When identified, control measures shall be maintained, added, modified or replaced per 208.03(c)2.D.

Approved new or replaced control measures will be measured and paid for per subsections

208.11and 208.12. Devices damaged due to the Contractor's negligence shall be replaced at

the Contractor’s expense. From the time seeding and mulching work begins until project acceptance the Contractor shall maintain all seeded areas. Damage to seeded areas or to mulch materials shall be immediately restored. Damage to seeded areas or to mulch materials due to Contractor negligence shall be immediately restored at the Contractor’s expense. Restoration of other damaged areas will be measured and paid for under the appropriate bid item.

208.05

Temporary control measures may be removed upon completion of the project, as determined by the Water Quality Partial Acceptance walk-through. If removed, the area where these control measures were constructed shall be returned to a condition similar to what existed before its disturbance. Removed control measures shall become the property of the Contractor. If the Contractor fails to complete construction within the approved contract time, the Contractor shall continue erosion and sediment control operations at its expense until acceptance of the work.

Sediment removed during maintenance of control measures and material from street sweeping may be used in or on embankment, provided it meets the requirements of Section 203 and is distributed evenly across the embankment.

Whenever sediment collects on the paved surface, the surface shall be cleaned. Street washing will not be allowed. Storm drain inlet protection shall be in place before shoveling, sweeping, or vacuuming. Sweeping shall be completed with a pickup broom or equipment capable of collecting sediment. Sweeping with a kick broom will not be allowed.

Material from pavement saw cutting operations shall be cleaned from the roadway surface during operations using a vacuum. A control measure, such as a berm, shall be placed to contain slurry from joint flushing operations until the residue can be removed from the soil surface. Aggregate bags, erosion logs or other permeable control measures shall not be used. Residue shall not flow into driving lanes. It shall be removed and disposed of per subsection 107.25(b). Material containment and removal will not be paid for separately but shall be included in the work.

208.05Construction of Control Measures. Control measures shall be constructed per Standard

Plans M-208-1 and M-216-1, and with the following:

(a)Seeding, Mulching, Sodding, Soil Retention Blanket. Seeding, mulching, sodding, and soil

retention blanket installation shall be performed per Sections 212, 213, and 216.

(b)Erosion Bales. The bales shall be anchored securely to the ground with wood stakes.
(c)Silt Fence. Silt fence shall be installed in locations specified in the Contract.
(d)Temporary Berms. Berms shall be constructed to the dimensions shown in the Contract, and

sufficiently compacted to prevent erosion or failure. If the berm erodes or fails, it shall be immediately repaired or replaced at the Contractor's expense.

(e)Temporary Diversion. Diversions shall be constructed to the dimensions shown in the

Contract and graded to drain to a designated outlet. The berm shall be sufficiently compacted to prevent erosion or failure. If the diversion erodes or fails, it shall be immediately repaired or replaced at the Contractor's expense.

(f)Temporary Slope Drains. Temporary slope drains shall be installed before installation of

permanent facilities or growth of adequate ground cover on the slopes. Temporary slope drains shall be securely anchored to the slope. The inlets and outlets of temporary slope drains shall be protected to prevent erosion.

208.05

(g)Silt Berm. Before installation of silt berms, the Contractor shall prepare the surface of the

areas where the berms are to be installed such that are they free of materials greater than 2 inches in diameter and are suitably smooth for the installation of the silt berms, as approved. Silt berms shall be secured with spikes. The Contractor shall install the silt berm in a manner that will prevent water from going around or under the silt berm. Silt berms shall be installed on top of soil retention blanket or turf reinforcement blanket.

(h)Rock Check Dam. Rock shall be installed at locations shown on the plans. Rock check dams

shall conform to the dimensions shown on the plans.

(i)Rip rap Outlet Protection. Geotextile used shall be protected from cutting or tearing.

Overlaps between two pieces of geotextile shall be 1-foot minimum. Riprap size shall be as shown on the plans.

(j)Storm Drain Inlet Protection. Before installation, the Contractor shall sweep the surface of

the area where the storm drain inlet protection devices are to be installed such that the pavement is free of sediment and debris. The ends of the inlet protection Type 1 and Type 2 shall extend a minimum of 1 foot past each end of the inlet. The Contractor shall remove all accumulated sediment and debris from the surface surrounding all storm drain inlet protection devices after each rain event or as directed. The Contractor shall remove accumulated sediment from each Type II and III containment area when it is more than one third full of sediment, or as directed.

The Contractor shall protect storm drain facilities adjacent to locations where pavement cutting operations involving wheel cutting, saw cutting, sand blasting, or abrasive water jet blasting are to take place.

(k)Sediment Trap. Sediment traps shall be installed to collect sediment-laden water and to

minimize the potential of pollutants leaving the project site. Locations shall be as shown on the plans or as directed. Sediment traps shall be constructed before disturbance of upslope areas and shall be placed in locations where runoff from disturbed areas can be diverted into the trap.

The area under the embankment shall be cleared, grubbed, and stripped of any vegetation and roots.

Fill material for the embankment shall be free of roots or other vegetation, organic material, large stones, and other objectionable material.

Sediment shall be removed from the trap when it has accumulated to one half of the wet storage depth of the trap and shall be disposed of per subsection 208.04(f).

(l)Erosion Logs. Erosion logs, also known as sediment control logs, shall be embedded 2 inches

into the soil. Stakes shall be embedded so that the top of the stake does not extend past the top of the erosion log more than 2 inches, at the discretion of the Engineer, a shallower stake depth may be permitted if adverse site conditions are encountered, such as rock or The Contractor shall maintain the erosion logs during construction to prevent sediment from passing over or under the logs.

208.05

(m)Silt Dikes. Before installation of silt dikes, the Contractor shall prepare the surface of the areas where the silt dikes are to be installed such that they are free of materials greater than 2 inches in diameter and are suitably smooth for the installation of the silt dikes, as approved by the Engineer.

(n)Concrete Washout Structure. The concrete washout structure shall meet or exceed the

dimensions shown on the plans. Work on this structure shall not begin until the Engineer provides written acceptance of location. Implement control measures designed for concrete and masonry washout waste. If the bottom of the excavated structure is within 5 feet of anticipated high ground water elevation or the soil does not have adequate buffering capacity to meet water quality standards, an impermeable synthetic liner shall be installed with the minimum properties shown in Table 208-8 or use a prefabricated washout.

Meet the following requirements:

1.The structure shall contain all washout water.
2.Stormwater shall not carry wastes from washout and disposal locations.
3.The structure shall be located a minimum of 50 horizontal feet away from state

waters and shall meet all requirements for containment and disposal as defined in subsection 107.25.

4.The structure shall be signed as “Concrete Washout.”
5.The structure shall be accessible to appropriate vehicles.
6.Freeboard capacity shall be included in the structure design to reasonably ensure the

structure will not overtop during or because of a precipitation event.

7.The Contractor shall prevent tracking of washout material out of the washout

structure.

8.Do not add soaps, solvents, detergents, flocculants, and acid to wash water.
9.Surround the structure on three sides by a compacted berm.
10.The structure shall be fenced with orange plastic construction fencing to provide a

barrier to construction equipment and to aid in identification of the concrete washout structure.

11.Concrete and masonry waste, liquid and solid, shall not exceed 2/3 the storage

capacity of the washout structure.

(o)Prefabricated concrete washout structures (Type 1 and Type 2). Structures and sites

shall meet the following requirements:

1.Structure shall contain concrete and masonry washout water. If bins are determined

to be leaking, the Contractor shall replace the bin onsite and clean up the spilled material.

2.Structure shall be located a minimum of 50 horizontal feet away from state waters

and shall be confined so that no potential pollutants will enter state waters and other sensitive areas as defined in the Contract. Locations shall be as approved by the Engineer. Sign the prefabricated structure as “Concrete Washout”. Sign can be on portable bin.

3.The structure shall be accessible to appropriate vehicles.

208.05

4.Washout bins shall be covered with a tarp tied down to the structure or staked to the

ground when a storm event is anticipated.

5.Do not add soaps, solvents, detergents, flocculants, and acid to wash water.
6.Concrete and masonry waste, liquid and solid, shall not exceed ⅔ the storage capacity of

the washout structure.

7.Do not move prefabricated structures when they contain liquid, unless otherwise

approved.

8.The concrete washout structure shall be installed and ready for use before concrete

placement operations.

9.Check and maintain washout areas as required. Do not allow on-site permanent disposal

of concrete washout waste.

10.All liquid and solid wastes, including contaminated sediment and soils generated from

concrete washout shall be hauled away from the site and disposed of properly at the Contractor's expense.

11.Delivery to the site shall not occur until written acceptance is provided by the Engineer

for both the product and the concrete waste disposal facility.

(p)Vehicle Tracking Pad (VTP). Vehicle tracking pads shall be constructed to the minimum

dimensions shown in the Contract, unless otherwise directed by the Engineer. Construction of approved vehicle tracking pads shall be completed before any disturbance of the area.

The Contractor shall maintain each vehicle tracking pad during the entire time that it is in use for the project. The vehicle tracking pad shall be removed at the completion of the project unless otherwise directed by the Engineer. Additional aggregate may be required for maintenance and will be paid for under Pay Item, Maintenance Aggregate (Vehicle Tracking Pad).

(q)Detention Pond. Permanent detention ponds shown on the plans may be used as temporary

control measures if the following conditions are met:

1.The pond is designated as a construction control measure in the SWMP.
2.The pond outfall and outlet are designed and implemented for use as a control measure

during construction per good engineering, hydrologic, and pollution control practices. The stormwater discharges from the outfall shall not cause degradation or pollution of state waters and shall have control measures as appropriate.

3.All silt shall be removed, and the pond returned to the design grade and contour, before

project acceptance.

(r)Aggregate Bag. Aggregate bags shall be placed on a stable surface, consisting of hardscape

or compacted gravel. If approved by the Engineer, the aggregate bag may be placed on compacted dirt areas, where bags conform to the surface and can effectively minimize sediment transport. Aggregate bags shall not be placed in concentrated flow areas. Aggregate bags shall be placed to conform to the surface without gaps to ensure that discharge water does not cause erosion.

208.06

(s)Surface roughening. Surface roughening creates horizontal grooves along the contour of

the slope. Roughening may be accomplished by furrowing, scarifying, ripping, or disking the soil surface to create a 2 to 4-inch minimum variation in soil surface.

(t)Vertical Tracking. Vertical tracking involves driving a tracked vehicle up and down the

soil surface and creating horizontal grooves and ridges along the contour of the slope. Sandy soils or soils that are primarily rock need not be tracked.

(u)Topographical (Landform) Controls. Topographical controls consist of existing or created

landforms that minimize sediment from entering or leaving the areas of disturbance. If a landform directs flow of water to a concentrated outfall point, the outfall point shall be protected to prevent erosion and withdraw water from or near the surface.

208.06Materials Handling and Spill Prevention. The SWMP Administrator shall clearly

describe and record on the SWMP, all practices implemented at the site to minimize impacts from procedures or significant material that could contribute pollutants to runoff. Areas or procedures where potential spills can occur shall have a Spill Response Plan in place as specified in subsections 107.25(b) or 208.06(c). Construction equipment, fuels, lubricants, and other petroleum distillates shall not be stored or stockpiled within 50 horizontal feet of any state waters or more if the Contractor determines necessary. Equipment fueling and servicing shall occur only within approved designated areas.

(a)Bulk Storage Structures. Bulk storage structures for petroleum products and other

chemicals shall have impervious secondary containment or equivalent adequate protection to contain all spills and prevent any spilled material from entering state waters. Secondary containment shall be capable of containing the combined volume of all the storage containers plus at least 10 percent freeboard. For secondary containment that is used and may result in accumulation of stormwater within the containment, a plan shall be implemented to properly manage and dispose of all accumulated stormwater deemed to be contaminated (has an unusual odor or sheen).

(b)Lubricant Leaks. The Contractor shall inspect equipment, vehicles, and repair areas daily

to ensure petroleum, oils, and lubricants (POL) are not leaking onto the soil or pavement. Absorbent material or containers approved by the Engineer shall be used to prevent leaking POL from reaching the soil or pavement. The Contractor shall have onsite approved absorbent material or containers of sufficient capacity to contain any POL leak that can reasonably be foreseen. The Contractor shall inform all Spill Response Coordinators per the Spill Response Plan if unforeseen leakage is encountered. All materials resulting from POL leakage control and cleanup shall become the property of the Contractor and shall be removed from the site. Control, cleanup, and removal of by- products resulting from POL leaks shall be performed at the Contractor's expense.

(c)Spill Response Plan. A Spill Response Plan shall be developed and implemented to

establish operating procedures for handling potential pollutants and preventing spills. The Response Plan shall contain the following information:

1.Identification and contact information of each Spill Response Coordinator.
2.Locations of areas on the project site where equipment fueling and servicing

operations are permitted.

3.Location of clean-up kits.

208.07

4.Quantities of chemicals and locations stored on-site.
5.Label system for chemicals and Safety Data Sheets (SDS) for products.
6.Clean-up procedures to be implemented in the event of a spill that does not enter state

waters or ground water.

7.Procedures for spills of any size that enter surface waters or ground water or have the

potential to do so. CDOT’s Erosion Control and Stormwater Quality Guide contains spill notification contacts and phone numbers required in the Spill Response Plan.

8.A summary of the employee training provided.

Information in items (1) through (8) shall be updated in the SWMP when they change.

(d)Equipment Washing. When washing applicators and containers used for paint, form release

oils, curing compounds, or other similar construction materials, the wash water must be directed into a leak-proof container. Liquid and hardened wastes shall be removed from the site and disposed of properly.

208.07Stockpile Management. Material stockpiles shall be located 50 horizontal feet away

from state waters and shall be confined so that no potential pollutants will enter state waters and other sensitive areas as defined in the Contract. Locations shall be approved by the Engineer.

Erodible stockpiles (including topsoil) shall be contained with acceptable control measures at the toe (or within 20 feet of the toe) throughout construction. Control measures shall be approved by the Engineer. The SWMP Administrator shall describe, detail, and record the sediment control devices on the SWMP.

208.08Limits of Disturbance. The Contractor shall limit construction activities to those areas

within the LDA shown on the plans and cross-sections. Construction activities, in addition to the Contract work, shall include the on-site parking of vehicles or equipment, on-site staging, on-site batch plants, haul roads or work access, and all other activities that would disturb existing soil conditions. Staging areas within the LDA shall be as approved by the Engineer. Construction activities beyond the LDA due to Contractor negligence shall be restored to the original condition by the Contractor at the Contractor’s expense. The SWMP Administrator shall tabulate additional disturbances not identified in the CDPS-SCP application and indicate changes to locations and quantities on the SWMP. The Contractor shall report the changes and additional disturbances to the Engineer, CDPHE-WQCD, and all other involved agencies.

The Contractor shall pursue stabilization of all disturbances to completion.

208.09Regulatory Mechanism for Water Quality The Department will identify and document

findings not in compliance with the Water Quality Specifications, as specified in subsection

(a)7, during MARs. The Engineer will immediately notify the Contractor of these findings

by issuing Form 105, which will be tracked in ESCAN/CARL software. Failure by the Contractor to clarify a finding location with the Engineer shall not interrupt the timelines noted in subsection 208.09(b).

(a)Timelines noted in subsection 208.09(b) do not indemnify the Contractor from failing to

comply with CDPS-SCP timelines for corrective actions. Corrective actions must be addressed in accordance with subsection 208.03(c). Definitions.

208.09

1.Compliance Assistance. A low-risk event as determined by the Region Water Pollution

Control Manager (RWPCM). Compliance assistance events are not considered Findings and not subject to the Regulatory Mechanism noted in subsection 208.09(b).

2.Deferment. A request from the Contractor to the Engineer to delay implementation of

corrective actions for Regular Findings pertaining to Water Quality Specifications. Deferments may only be granted due to extraordinary circumstances. However, it is at the Department’s discretion to approve or reject these requests.

3.Finding. An incident discovered through a MAR , which is noncompliant with the Water

Quality Specifications. A Finding will be classified as one of the following:

A.Regular Finding. A situation upon inspection that is in noncompliance with the

Water Quality Specifications.

B.Severe Finding. A discharge outside the project’s Limits of Construction (LOC),

subsection 107.25(a), to state waters or to a live inlet where the pollutant cannot be reclaimed.

C.Chronic Finding. A Chronic Finding is assessed when the same Regular Finding at

the same location is documented twice in the last three MARs. Engineer observed findings outside these MARs will not apply.

4.Inspection Form 105. The Form 105 issued by the Engineer documenting findings from

the MAR.

5.Location. The place where the finding was observed; can be a document (Stormwater

Management Plan [SWMP]) or physical location. A physical location must be described with enough detail to guide an independent party to the spot of the finding. Physical locations must be supported with at least one photograph.

6.Recalcitrance. Contractor has shown willful negligence or misrepresentation or

unwillingness to adhere to the Water Quality Specifications.

7.Water Quality Specifications. Subsection 107.25, Sections 208, 213 and 216, and

Standard Plans M-208-1 and M-216-1.

(b)Liquidated Damages and Stop Work Orders. The Contractor will be subject to Liquidated

Damages for incidents of failure to comply with the Water Quality Specifications and implement corrective actions to resolve noncompliance in the time frame established in subsection 208.09(b and c). Liquidated damages will not be considered a penalty but will be assessed to recover costs associated with environmental damages, and engineering and administrative expenses incurred by the Department for the Contractor’s failure to comply with the Water Quality Specifications. Liquidated damages will accumulate for each finding, for each cumulative day that the finding remains uncorrected. Liquidated damages associated with incidents pertaining to this subsection do not indemnify the Contractor of other Liquidated Damages associated with this project. In addition to Liquidated Damages, the Contractor will be subject to a project-wide Stop Work Order for recalcitrance and the Engineer may, in writing, issue a Stop Work Order for Chronic and Severe Findings per subsection 105.01.

208.09

Findings are closed when the corrective action is complete, reported to ESCAN and accepted by the Department. The Department will notify the Contractor through ESCAN when the corrective action is accepted or denied. Liquidated damages will be assessed by the type of finding as follows and will continue until the corrective action is approved by the Department.

1.Regular Finding. The time required to repair a Regular Finding shall begin at 11:59 PM on

the date the Inspection Form 105 is issued. The Contractor shall have no more than a seven-day grace period to correct the Regular Finding before Liquidated Damages are assessed. The grace period extends until 11:59 PM on the seventh day after the Inspection Form 105 was issued. The Engineer will issue a Form 105 notifying the Contractor that Liquidated Damages are accruing at $1,500 per day for each full or partial calendar day a Regular Finding remains uncorrected after the seven-day grace period. At 11:59 PM on the 14th day after the Form 105 was issued, each uncorrected, undeferred Regular Finding will be assessed as recalcitrant and the Engineer will issue a project-wide stop work order. The Contractor shall fix each recalcitrant finding and submit a plan to avoid future instances of each recalcitrance to the Department for approval. The recalcitrance plan shall be in writing, signed by the Superintendent and shall include:

A.Each Recalcitrant Finding.
B.Why the corrective action for each Recalcitrant Finding was not implemented within

14 days.

C.How the Contractor will avoid future recalcitrance.

The Department will discuss the recalcitrance plan and may meet with the Superintendent to recommend modifications, if needed. The Engineer will issue a Form 105 accepting or rejecting the recalcitrance plan within 24 hours of the Contractor submitting a plan or resubmitting a modified plan.

The Contractor will neither be reimbursed for costs incurred to fix each Recalcitrant Finding pertaining to a control measure in the SWMP plan nor costs to prepare the recalcitrance plan. The Contractor shall propose additional control measures, if needed, according to subsection 208.04(a). The project-wide Stop Work Order and Liquidated Damages will be assessed until approval of the corrective action for each Recalcitrant Finding and approval of the Contractor’s recalcitrance plan by the Department is given. After written approval by the Engineer, the project-wide Stop Work Order will be lifted, and accrual of Liquidated Damages will cease.

2.Severe Finding. In response to a Severe Finding, the Engineer will issue Inspection Form

105 and immediately assess Liquidated Damages of $3,500 per Severe Finding. Severe Findings shall not be eligible for the seven-day grace period (subsection 208.09(b)1). Liquidated damages will accrue at $3,500 per Severe Finding per calendar day beginning at 11:59 PM of day the Inspection Form 105 is issued.

A.If the Severe Finding is a discharge to state waters, the Contractor shall prevent any

further discharge and shall reclaim discharge that has not yet entered state waters. The Contractor shall report the discharge to CDPHE per CDPS-SCP requirements.

208.09

B.If the Severe Finding is a discharge outside the LOC that does not enter state

waters, the Contractor shall fully reclaim the discharge before it enters state waters and implement relevant CDPS-SCP noncompliance notification procedures. The Engineer may require the Contractor to submit a plan for permanent stabilization of disturbed areas outside the LOC per 208.04(e)4 for approval. Permanent stabilization plans pertaining to Severe Findings and subsequent stabilization activities are not subject to 208.09(b).

The Contractor shall not be reimbursed for activities undertaken to reclaim the discharge, stabilize areas outside the LOC and implement relevant CDPS-SCP noncompliance notification procedures.

3.Chronic Finding. In response to a Chronic Finding, the Engineer will issue Inspection

Form 105 and immediately assess Liquidated Damages of $1,500 per Chronic Finding. Chronic Findings shall not be eligible for the seven-day grace period (subsection

(b)). Liquidated damages will accrue at $1,500 per Chronic Finding per day

beginning at 11:59 PM of day the Inspection Form 105 is issued. When the Chronic Finding is comprised of two Severe Findings, the Department will assess Liquidated Damages per this specification.

(c)Deferment. If the Contractor seeks deferment, the Superintendent shall submit a deferment

request to the Engineer by 11:59 PM of the day after the issuance of Inspection Form 105. Chronic and Severe Findings are not eligible for deferment. The deferment request shall be in writing, signed by the Superintendent and shall include:

1.Regular Findings to be deferred.
2.The reasons why the Findings cannot be corrected in seven days.
3.An action plan containing:
A.Methodology to protect water quality until each deferred Finding is corrected and

accepted.

B.Milestones to measure progress toward completion.
C.Additional control measures to be implemented until each deferred Finding is

corrected and accepted.

D.Corrective completion dates for each Finding

The Department will discuss the deferment request and may meet with the Superintendent to recommend modifications to the action plan. The Engineer will issue a Form 105 accepting or rejecting the deferment request by 11:59 PM of the third day after the Inspection Form 105 documenting the Regular Finding is issued. The Department will not accept a deferment for operational error, lack of resources, improperly installed control measures, inadequate control measures, lack of preventative maintenance, careless or improper operation, or other non-proactive reason.

Preparation of deferment documentation and additional materials, including additional control measures, required to complete the action plan shall be at the Contractor’s expense. Time frames noted in subsection 208.09(b)1 will not be stopped during the deferment review period, therefore, Liquidated Damages will be assessed beginning

208.10

11:59 PM on calendar day seven if the deferment request is rejected and, furthermore, a rejected deferment plan (subsection 208.09(c)) shall not absolve the Contractor from recalcitrance.

The Engineer will assess Liquidated Damages of $1,500 per calendar day, and partial day, for each uncorrected Deferred Finding. These Liquidated Damages will start on the date the uncorrected work was deferred to be completed (subsection 208.09(c)(3)). In addition, Liquidated Damages of $1,500 per calendar day will be assessed retroactively to 11:59 PM of the day the finding was originally noted on the Inspection Form 105.

(d)Conflict Resolution. Subsections 105.22, 105.23, and 105.24 detail the process through

which the parties (CDOT and the Contractor) agree to resolve any issue that may result in a dispute.

(e)Exemptions. The Engineer will exempt from subsection 208.09(b) situations of Compliance

Assistance, Documented Upset Conditions, Documented Reportable Spills and Documented Winter Exemptions. Release from subsection 208.09(b) does not exempt the Contractor from compliance with the CDPS-SCP.

1.Documented Upset Condition. The Contractor shall report, both verbally and in writing,

the Upset Condition to CDPHE-WQCD per CDPS-SCP Part II.N and subsection 208.03(c) and provide written documentation to the Engineer. The Engineer will issue a Form 105 and recognize the exemption to the Regulatory Mechanism. The Contractor shall also update the SWMP with the Form 105 and the documented Upset Condition.

2.Documented Reportable Spills. The Contractor shall report, both verbally and in writing,

the Reportable Spill to CDPHE-WQCD per subsection 107.25(b) and provide written documentation to the Engineer. The Engineer will issue a Form 105 and recognize the exemption to the Regulatory Mechanism. The Contractor shall also update the SWMP with the Form 105 and the documented Reportable Spill.

3.Winter Exemptions. The Contractor is unable to address findings noted on the MAR due

to:

A.Snow covers the entire site for an extended period,
B.No construction activity, and
C.Melting conditions posing a risk of surface erosion do not exist.

The Contractor shall request a Winter Exemption to the Department. If approved, the Engineer will issue a Form 105 and recognize the exemption to subsection 208.09(b). The Contractor shall also update the SWMP with the Form 105 and the documented Winter Exemption. Liquidated Damages, if assessed, will only accrue up to the point where the Winter Exemptions are approved.

4.Compliance assistance during MARs. The RWPCM will record compliance assistance in

ESCAN/CARL software.

208.10Items to Be Completed Before Requesting Partial Acceptance of Water Quality Work

(a)Reclamation of Washout Areas. After concrete operations are complete, washout areas shall

be reclaimed per subsection 208.05(n) at the Contractor’s expense.

208.10

(b)Survey. When Permanent Water Quality (PWQ) control measures are required on the

project and once built, the Contractor shall survey the control measures to confirm that the PWQ control measures conform to the configuration, grade, and volume shown on the plans. The survey shall conform to Section 625. The results of the survey shall be submitted per CDOT’s Survey Manual (MicroStation to GIS and TMOSS Codes), or GIS with attribute tables, showing both designed and final elevations and configurations. The Contractor’s Surveyor shall submit electronically sealed control measure drawings. PWQ control measures that do not meet the Contract requirements will be identified in writing by the Engineer and shall be repaired or replaced at the Contractor’s expense. Correction surveys shall be performed at the Contractor’s expense to confirm the locations, dimensions, and volume certification (for water quality capture volume structures only) of each PWQ control measure. The Engineer, CDOT Hydraulics Engineer for the region, Headquarters Permanent Water Quality Manager, and Headquarters Maintenance staff will perform a walkthrough of the PWQ control measures to confirm conformance to material requirements, locations, and dimensions. Before the walkthrough, the Contractor shall provide the corrected survey to the Engineer, Regional, and Headquarters Permanent Water Quality Managers.

(c)Locations of Temporary Control Measures. The Engineer will identify locations where

modification, cleaning, or removal of temporary control measures are required and will provide these in writing to the Contractor. Upon completion of work required, the SWMP Administrator shall modify the SWMP to provide an accurate depiction of control measures to remain on the project site. Complete and approve all punch list and walkthrough items by the Engineer and Maintenance.

Method of Measurement

. Erosion Control Management will be measured as the actual number of days of ECM

work performed, regardless of the number of personnel required for SWMP Administration and Form 1176 Inspection, including Form 1176 Inspections, documentation, meeting participation, SWMP Administration, and the preparation of the SWMP. If the combined hours of SWMP Administration and Form 1176 Inspection is four hours or less in a day, the work will be measured as a half day. If the combined hours of SWMP Administration and Form 1176 Inspection is more than four hours in a day, the work will be measured as one day. Pay the total combined hours of ECM work exceeding eight hours in a day as one day.

Erosion bales and rock check dams will be measured by the actual number installed and accepted.

Silt fence, silt berms, erosion logs, aggregate bags, silt dikes, temporary berms, temporary diversions, and temporary slope drains, will be measured by the actual number of linear feet that are installed and accepted. Measured length will not include required overlap.

Concrete washout structure will be measured by the actual number of structures that are installed and accepted.

Prefabricated concrete washout structures will be measured by the actual number of structures delivered to the site. It shall not include structures moved on-site.

208.12

Storm drain inlet protection will be measured by linear foot or actual number of devices that are installed and accepted.

Sediment trap quantities will be measured by the actual number installed and accepted.

Removal of trash that is not generated by construction activities will be measured by the actual number of hours that Contractor workers actively remove trash from the project. Each week the Contractor shall submit to the Engineer a list of workers and the hours spent collecting such trash.

Removal of accumulated sediment from traps, basins, areas adjacent to silt fences and erosion bales, and other clean out excavation of accumulated sediment, and the disposal of such sediment, will be measured by the number of hours that equipment, labor, or both are used for sediment removal.

Vehicle tracking pads will be measured by the actual number constructed and accepted.

Additional aggregate required for maintaining vehicle-tracking pads will be measured as the actual number of cubic yards installed and accepted.

Prefabricated vehicle-tracking pads will be measured by the actual number of pads delivered to the site and set up to the minimum dimensions. It shall not include pads moved on-site.

Basis of Payment

208.12. Pay for ECM and control measures at the Contract unit price for each of the items

listed below that appear in the bid schedule.

Pay under:

Pay Item Pay Unit Aggregate Bag Linear foot Concrete Washout Structure Each Erosion Bales (Weed Free) Each Erosion Control Management Day Erosion Log (Type 1) (____ Inch) Linear foot Erosion Log (Type 2) (____ Inch) Linear foot Erosion Log (Type 3) (____ Inch) Linear foot Prefabrctd. Concrete Washout Structure(Type 1) Each Prefabrctd. Concrete Washout Structure(Type 2) Each Prefabricated Vehicle Tracking Pad Each Mtce. Aggregate (Veh. Tracking Pad) Cubic Yard Removal & Disposal of Sediment (Equip.) Hour Removal and Disposal of Sediment (Labor) Hour Removal of Trash Hour Rock Check Dam Each Sediment Basin Each

208.12

Pay Item Pay Unit Sediment Trap Each Silt Berm Linear Foot Silt Dike Linear Foot Silt Fence Linear Foot Silt Fence (Reinforced) Linear Foot Storm Drain Inlet Protection (Type__) Linear Foot Storm Drain Inlet Protection (Type__) Each Sweeping (Sediment Removal) Hour Temporary Berm Linear Foot Temporary Diversion Linear Foot Temporary Slope Drain Linear Foot Vehicle Tracking Pad Each

Payment for Erosion Control Management (ECM) will be full compensation for all labor, materials and equipment necessary for the SWMP Administrator and Erosion Control Inspectors to perform all the work described in this specification. This includes assembling Tabs 5 to 18 in subsection 208.03(d)1 and required updates to the SWMP.

The SWMP Administrator and ECI's commute times will not be measured and paid for separately but shall be included in the work.

Modifications to the SWMP due to construction errors or survey errors by the Contractor shall be made at the Contractor’s expense.

Surface roughening and vertical tracking (daily stabilization) will not be measured and paid for separately but shall be included in the work. Payment for each control measure item will be full compensation for all work and materials required to furnish, install, maintain, and remove the control measure when directed. Payment for Removal and Disposal of Sediment (Equipment) will be full compensation for use of the equipment, including the operator. Payment for Removal and Disposal of Sediment (Labor) will be full compensation for use of the labor. Payment for concrete washout structure, whether constructed or prefabricated, will be full compensation for all work and materials required to install, maintain, and remove the item. Maintenance and relocation, as required, of these structures throughout the duration of the project will not be measured and paid for separately but shall be included in the work. Silt berm spikes and wood spikes will not be measured and paid for separately but shall be included in the work. When required, soil retention blankets will be measured and paid for per Section 216. Compost and wood stakes for Erosion Log (Type 2) will not be measured and paid for separately but shall be included in the work. Spray-on mulch blankets required by the Contract, including those used in both temporary and final stabilization, will be measured and paid for per Section 213.

208.12

Payment for storm drain inlet protection will be full compensation for all work, materials, and equipment required to complete the item, including surface preparation, maintenance throughout the project, and removal upon completion of the work. Aggregate will not be measured and paid for separately but shall be included in the work.

Sweeping, when used as a control measure as shown in the Contract, will be measured by the number of hours that a pickup broom or equipment capable of collecting sediment, authorized by the Engineer, is used to remove sediment from the roadway or other paved surfaces. Each week the Contractor shall submit to the Engineer a statement detailing the type of sweeping equipment used and the number of hours it was used to pick up sediment. The operator will not be measured and paid for separately but shall be included in the work.

Stakes, anchors, connections, geotextile, riprap, and tie downs used for temporary slope drains will not be measured and paid for separately but shall be included in the work.

Payment for vehicle tracking pad will be full compensation for all work, materials and equipment required to construct, maintain, and remove the entrance upon completion of the work. Aggregate and geotextile will not be measured and paid for separately but shall be included in the work. If additional aggregate for maintenance of vehicle tracking pads is required, it will be measured by the cubic yard per Section 304 and will be paid for under this Section as Maintenance Aggregate (Vehicle Tracking Pad). Seeding, sod, mulching, soil retention blanket, and riprap will be measured and paid for per Sections 212, 213, 216, and 506. All work and materials required to perform the permanent control measure survey and furnish the electronic files shall be included in the original unit price bid for surveying. Surveying will be measured and paid for per Section 625. Payment will be made for control measures replaced as approved by the Engineer. Temporary erosion and sediment control measures required due to the Contractor’s negligence, carelessness, or failure to install permanent controls as a part of the work as scheduled or ordered by the Engineer or for the Contractor's convenience, shall be performed at the Contractor’s expense. If the Contractor fails to complete construction within the contract time, payment will not be made for Section 8 pay items for the period of time after expiration of the contract time. These items shall be provided at the Contractor's expense.

208.12

This Page Intentionally Left Blank

209.02

Get an email when 208 changes

Colorado revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Colorado Standard Specifications for Road and Bridge Construction, 2023 Edition. Pages 231–264 of 943. View official source ↗

Products that meet CO Section 208