the word POISON and symbols thereof shall be six (6) inches. All other lettering shall be a minimum of four ( 4) inches. The sign shall be made of weather resistant materials such as plastic or exterior plywood and shall be securely fastened to the building. Where buildings to be demolished have had exterior poison warning signs placed upon them during the Divisio n’s phase of the rodent control program, the signs remaining on the buildings to be demolished will serve as adequate warning and the signing requirement of this Section is waived. Exterior poison warning signs previously placed by the Division shall, upo n demolition of the buildings, remain Division property and shall be stored on the project for removal by the Division. Dead rodents shall be removed from the building demolition area daily and shall be buried at a minimum depth of two ( 2) feet. The disp osal area shall be provided by the Contractor and shall be subject to approval by the Engineer.
202.4.2 -Insurance Requirements: In addition to the insurance required of the Contractor on all Division Contracts, the Contractor is required to maintain Li ability Insurance for this work in the amounts and form as set forth below for the duration of the work:
Public Liability $1,000,000 Products Liability $1,000,000 Owner Liability $1,000,000
The above insurance shall be purchased by the Contractor on behalf of the Division from a company authorized to do business in the State of West Virginia.
202.5 -WELLS : The Contractor shall plug the well prior to starting any o ther construction in the vicinity of the well.
202.5.1 -Materials: Materials for plugging water wells shall meet the requirements of
MATERIAL SUBSECTION Bentonite 715.45 ** Concrete 601
** Class D with or without air entrainment at the option of the Contractor.
202.5.2 -Gas and Oil Wells: The well shall be plugged using bentonite and cement as provided for by law, and the work shall be accomplished by a qualified service company meeting the approval of the Department of Environmental Protection office of Oil and Gas. All work pertaining to plugging the well must be performed under the supervision of the representative of the DEP office of Oil and Gas. The Contractor shall notify the Project Engineer and the DEP office of Oil and Gas at least 14 days in advance of the date on which the Contractor intends to begin work.