General Provisions (00100-00999)

602Payment will be made at the Contract unit price per linear foot for ea ch size of support

WV · 2023 Standard SpecificationsBook pages 622624View official source ↗

at the Contract unit price per linear foot for ea ch size of support required by the Plans. Such price and payment shall be full compensation for furnishing and erecting the supports, and all labor, equipment, tools, materials, and incidentals necessary to complete the work.

657.5.5 -Steel Beam Supports: Measurement for payment of “Steel Beam Supports ” will be based on the number of linear feet of supports for each size necessary to complete the work. The supports shall be measured from the bottom of the base plate, and along the centerline of the web , to the top of the support. The quantity to be paid for shall include the supports, hinge plate connections including hardware, and the base plate connection including hardware except as noted herein. The length shall be the Plan quantity unless otherwise directed by the Engineer. Lengths will be computed to the nearest ½ -foot for each installation and the nearest one ( 1) foot for the total length. In cases where an Omni -Directional Breakaway Device is specified to be used with the assembly, all mater ial and labor costs associated with the device shall be paid for under the provided Omni -Directional Breakaway Device bid item. Payment will be made at the contract unit price per linear foot of support for each size and shall be full compensation for fu rnishing and erecting all supports and materials, tools, labor, and equipment necessary to complete the work.

657.5.6 -Pipe Post Supports: Measurement for payment of “Pipe Post Supports ” will be based on the actual number of pipe posts necessary to comp lete the work. This quantity shall be the Plan quantity unless otherwise directed by the Engineer. The quantity to be paid for shall include the supports, arm connections including hardware, and the base plate connection including hardware. In cases wh ere a pipe post support is to be installed using a Type L Bridge or Retaining Wall Sign Mounting Bracket, all material and labor costs associated with the bracket shall be paid for under the provided Bridge or Retaining Wall Bracket bid item. Payment wil l be made at the contract unit price per support and shall be full compensation for furnishing and erecting all supports and materials, tools, labor, and equipment necessary to complete the work.

657.5.7 -Omni -Directional Breakaway Devices: Measurement for payment of “Omni - Directional Breakaway Devices ” will be based on the actual number of devices necessary to complete the work. This shall equate to the total number of individual supports requiring the installation of an Omni -Directional Breakaway Device. The total cost of each device shall include all components of the device including hardware. The number of units paid for shall be the Plan quantity unless otherwise directed by the Engineer. Payment will be made at the Contract unit price per unit , and shall be full compensation for materials, tools, labor, and equipment necessary to complete the work.

657.5.8 -Back to Back U -Channel Breakaway Devices: Measurement for payment of “Back to Back U -Channel Breakaway Devices ” will be based on the act ual number of devices necessary to complete the work. This shall equate to the total number of individual supports requiring the installation of a Back to Back U -Channel Breakaway Device. The total cost of each device shall include all components of the device including hardware. The number of units paid for shall be the Plan quantity unless otherwise directed by the Engineer.

603 Payment will be made at the Contract unit price per unit, and shall be full compensation for materials, tools, labor, and equ ipment necessary to complete the work.

657.5.9-Surface Mount Breakaway Devices: Measurement for payment of “Surface Mount Breakaway Devices” will be based on the actual number of devices necessary to complete the work. This shall equate to the total n umber of individual supports requiring the installation of a Surface Mount Breakaway Device. No differentiation in payment shall be made based on differentiation in cost of the device for each different size support. The total cost of each device shall i nclude all components of the device including hardware. The number of units paid for shall be the Plan quantity unless otherwise directed by the Engineer. Payment will be made at the Contract unit price per unit, and shall be full compensation for mater ials, tools, labor, and equipment necessary to complete the work.

657.5.10 -Bridge, Retaining Wall, and Barrier Wall Brackets: Measurement for payment of “Bridge or Retaining Wall Brackets” and “Barrier Wall Brackets” will be based on the actual number of brackets necessary to complete the work. The total cost of each bracket shall include all components of the bracket including parapet, wall, or barrier connection hardware. With the exception of the Type D Barrier Wall Bracket, the vertical sup port(s) of each bracket shall be paid for separately under the applicable bid item. The number of units paid for shall be the Plan quantity unless otherwise directed by the Engineer. Payment will be made at the Contract unit price per unit, and shall be full compensation for materials, tools, labor, and equipment necessary to complete the work.

657.5.11 -Support or Bracket Removal: Measurement for payment of “Support or Bracket Removal ” will be based on the actual number of supports and/or brackets th at are required to be removed. This quantity shall be the Plan quantity unless otherwise directed by the Engineer. In cases where a bracket is designated for removal, any supports attached to the bracket shall not be counted as additional quantities. Payment will be made at the contract unit price per support or bracket. This price shall also be full compensation for the removal and disposal of the signs and sign assemblies, including hardware and bracing, the removal and disposal of the supports and t he restoration of the ground surface to its original condition. No differentiation in payment shall be made based on support size, bracket type, or the method that was originally used to anchor the support.

657.6 -BASIS OF PAYMENT : The quantities, determined as provided, will be paid for at the contract unit price for the items listed below, which prices and payment shall be full compensation for furnishing all the material and doing all the work prescribed in a workmanlike and acceptable manner, including all tools, equipment, supplies and incidentals necessary to complete the work. All incidental work and materials for which no basis of payment is provided will be considered as completely covere d by the prices bid for the items included in the Contract.

604 657.7 -PAY ITEMS : ITEM DESCRIPTION UNIT 657006 -001 S4X7.7 Steel Beam Support Linear Foot 657006 -005 W6X12 Steel Beam Support Linear Foot 657006 -010 W8X18 Steel Beam Support Linear Foot 657006 -015 W10X22 Steel Beam Support Linear Foot 657008 -* 2.00 LB Channel Post Linear Foot 657010 -* 3.00 LB Channel Post Linear Foot 657012 -* 4.00 LB Back to Back Channel Post Linear Foot 657014 -* 6.00 LB Back to Back Channel Post Linear Foot 657016 -* Class B Concrete Footing, Plain, Roadside Cubic Yard 657017 -* Class B Concrete Footing, Reinforced, Roadside Cubic Yard 657018 -* Support or Bracket Removal Each 657019 -* Pipe Post Each 657035 -* Square Tube Support, 2.00X14GA Linear Foot 657040 -* Omni -Directional Breakaway Device Each 657041 -* Back to Back U -Channel Breakaway Device Each 657042 -* Surface Mount Breakaway Device Each 657050 -* Bridge or Retaining Wall Bracket, Type Each 657060 -* Barrier Wall Bracket, Type Each

* Sequence Number

Source: West Virginia Standard Specifications for Road and Bridge Construction, 2023 Edition. Pages 622624 of 1,006.