B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

CaliforniaOakland

Shed permit checklist — Oakland, California

Assembled from Oakland’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Oakland requires a permit for a shed.

When a permit is not required

Up to one accessory structure per property measuring less than 120 sq. ft. is generally permitted outright and does not count towards total lot coverage. A Building Permit is not required for such a structure unless Mechanical, Electrical or Plumbing (MEP) work is involved or the structure is greater than 120 sq. ft. Zoning review is still required.

Loading the full checklist…

Sources

Other permits Oakland publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Oakland permit requirementsOakland permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Oakland before you build.

Shed permit checklist — Oakland, California | BuildSpec