B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

CaliforniaRiverside

Shed permit checklist — Riverside, California

Assembled from Riverside’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Riverside requires a permit for a shed.

When a permit is not required

One-story detached accessory structures used as a tool or storage shed, playhouse or similar use are exempt from a building permit when the floor area does not exceed 120 square feet. The Building & Safety Division's permits page states that 120-square-foot threshold on its own; the division's Work Exempt from Building Permits handout limits the same exemption to detached accessory structures of 120 square feet or less that will not be electrically wired.

Loading the full checklist…

Sources

Other permits Riverside publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Riverside permit requirementsRiverside permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Riverside before you build.

Shed permit checklist — Riverside, California | BuildSpec