Electrical work permit checklist — Aurora, Colorado

Assembled from Aurora’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Aurora requires a permit for electrical work.

When a permit is not required

No permit is needed for light installation, light replacements or repairs, repairing or replacing switches and outlets, smoke detectors, or carbon monoxide detectors, unless a new device is installed where none existed. Work on aluminum wiring does not need a permit unless a permit is desired. An electric vehicle charging station does not need a permit unless the system is hard wired. A garbage disposal does not need a permit unless a new outlet or switch is installed. A radon system does not need a permit unless new electrical is provided for the fan, and a sump pump does not need one unless new electrical is installed for the pump.

Loading the full checklist…

Sources

Other permits Aurora publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Aurora permit requirementsAurora permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Aurora before you build.