B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in

Texas › Arlington

Retaining wall permit checklist — Arlington, Texas

Assembled from Arlington’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Arlington requires a permit for a retaining wall.

When a permit is not required

Arlington's Work Exempt from Permitting technical bulletin is the list of items that need no building permit, and retaining walls are on it at a developed height of 4 feet (1219 mm) or less at every point, sized from the footing base up to the wall's highest point. A wall comes back off the list if it carries a surcharge or other imposed load, if it holds back Class I, II or IIIA liquids, or if it sits inside a FEMA floodplain. For tiered walls the bulletin refers the reader to Article 1 of the Construction Chapter.

What Arlington publishes for this permit

  • 11 submittal documents to include with the application
  • 5 required inspections, in the city's published order
  • 1 process step from application to final
  • 1 published fee line from the city's fee schedule
  • Checked against Arlington's documents on November 16, 2026

Loading the full checklist…

Sources

Other permits Arlington publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Arlington permit requirementsArlington permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Arlington before you build.

Retaining wall permit checklist — Arlington, Texas | BuildSpec