Electrical work permit checklist — Cedar City, Utah

Assembled from Cedar City’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Cedar City requires a permit for electrical work.

When a permit is not required

A permit is required for electrical changes, including electric and gas meter upgrades and installations and solar PV installations. The city refers readers to 2021 IRC R105.2 and 2021 IBC 105.2 for the exempt list.

What Cedar City publishes for this permit

  • 1 submittal document to include with the application
  • 1 process step from application to final
  • 1 published fee line from the city's fee schedule
  • Checked against Cedar City's documents on November 9, 2026

Loading the full checklist…

Sources

Other permits Cedar City publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Cedar City permit requirementsCedar City permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Cedar City before you build.

Electrical work permit checklist — Cedar City, Utah | BuildSpec