General building work permit checklist — Washington, Utah

Assembled from Washington’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Washington requires a permit for general building work.

When a permit is not required

City Code 8-1-2 adopts the current uniform/international building code adopted by the state, requires a written permit application with plans and specifications, prohibits variation from the approved plans without authorization, and makes a violation a misdemeanor (Class C for a homeowner, Class B for a paid contractor) with an exception for projects under $500; the city council sets permit fees by resolution and the building official determines valuation. Effective July 1, 2026 all plans submitted for permit must reflect the Utah adopted statewide codes: 2023 NEC, 2021 Utah State Residential Code, 2024 IBC, 2024 IMC, 2024 IPC, 2024 IFCI, 2024 IECC, 2024 ISPSC, 2024 IEBC and ICC A117.1-2009 or 2017 standard.

Loading the full checklist…

Sources

Other permits Washington publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Washington permit requirementsWashington permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Washington before you build.