B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Chandler, Arizona Building Permit Cost Calculator

Estimates permit cost in Chandler from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Minimum permit fee
$60.00, based on a valuation of $500.00 or less
see rule
How this jurisdiction calculates the fee

Building permit and plan check fees are charged according to the valuation of the project, which is estimated based on the approximate cost to have a contractor do the job including labor and materials. The City of Chandler Fee Schedule uses the ICC Building Valuation Data to determine the minimum value per square foot for newly constructed buildings, and where the valuation provided is less than the valuation in the adopted schedule the fees are based upon the City Fee Schedule. All valuation adjustments are computed as part of the plan review process. The Homeowner Building Permit Manual states that the minimum permit fee is $60.00, based on a valuation of $500.00 or less, and that the permit fee increases from this point; the City of Chandler Fee Schedule sets a building permit fee of $50.00 for a total valuation of $1.00 to $500 and a fee of $60.00 for permit issuance when no other fees apply.

Source: published fee schedule · Verified 11/16/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Electrical service 400 amps or less
Flat fee $100.00
$100.00
○Miscellaneous minor residential work (1-6 gas outlets, 1-2 branch electrical circuits, 1-6 plbg. openings, etc.)
Flat fee $100.00
$100.00
○Residential solar photovoltaic system permit fee
Flat fee $150.00
$150.00
○Building permit fee, total valuation $1.00 to $500
Flat fee $50.00
$50.00
○Building permit fee, total valuation $501 to $2,000
$50.00 for the first $500.00, plus 2,495 x $1.20 for $249,500.00 over (rounded up per "or fraction thereof") = $3,044.00
$3,044.00
Building plan review fee · add-on
65% of building permit fee — select the permit fee line above to calculate
see rule
Re-inspection fee
$60.00/hour, 1 hour minimum
see rule
Inspection outside normal business hours
$75.00/hour, 2 hour minimum
see rule
○Permit issuance when no other fees apply
Flat fee $60.00
$60.00
Work started without a permit
Permit fees are doubled
see rule
How this jurisdiction calculates the fee

A residential electrical service rated 400 amperes or less carries a flat miscellaneous permit fee. Minor residential work covering one or two branch electrical circuits is charged a separate flat miscellaneous fee. Electrical work outside those categories is folded into the building permit fee, charged on the valuation of the project under section 4.6.1, with building plan review at 65 percent of the permit fee. Permit fees are doubled where work is built without a permit. Fees are effective March 2, 2026.

Source: published fee schedule · Verified 11/16/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Zoning Clearance (required for all fences and walls regardless of height)
Flat fee $120.00
$120.00
Fence up to seven feet tall
No building permit required
see rule
○Fence over seven feet tall - building permit, total valuation $1.00 to $500
Flat fee $50.00
$50.00
○Fence over seven feet tall - building permit, total valuation $501 to $2,000
$50.00 for the first $500.00, plus 2,495 x $1.20 for $249,500.00 over (rounded up per "or fraction thereof") = $3,044.00
$3,044.00
○Fence over seven feet tall - building permit, total valuation $2,001 to $25,000
$68.00 for the first $2,000.00, plus 248 x $12.50 for $248,000.00 over (rounded up per "or fraction thereof") = $3,168.00
$3,168.00
Building plan review fee · add-on
65% of building permit fee — select the permit fee line above to calculate
see rule
Re-inspection fee
$60.00/hour, 1 hour minimum
see rule
○Permit issuance when no other fees apply
Flat fee $60.00
$60.00
Work started without a permit
Permit fees are doubled
see rule
How this jurisdiction calculates the fee

Chandler publishes no flat fence permit fee. A fence up to seven feet tall needs no building permit, but every fence and wall requires zoning clearance from Planning whatever its height, and the zoning clearance fee is published in the citywide fee schedule. A taller fence needs prior Planning approval and a building permit, priced on the valuation of the work under section 4.6.1 with plan review at 65 percent of the permit fee. A permit is also required where a fence is placed on top of a retaining wall. Fees are effective March 2, 2026.

Source: published fee schedule · Verified 11/13/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Like-for-like roof covering replacement that adds no load to the structural frame
No permit required
see rule
○Building permit fee, total valuation $1.00 to $500
Flat fee $50.00
$50.00
○Building permit fee, total valuation $501 to $2,000
$50.00 for the first $500.00, plus 2,495 x $1.20 for $249,500.00 over (rounded up per "or fraction thereof") = $3,044.00
$3,044.00
○Building permit fee, total valuation $2,001 to $25,000
$68.00 for the first $2,000.00, plus 248 x $12.50 for $248,000.00 over (rounded up per "or fraction thereof") = $3,168.00
$3,168.00
○Building permit fee, total valuation $25,001 to $50,000
$355.50 for the first $25,000.00, plus 225 x $9.00 for $225,000.00 over (rounded up per "or fraction thereof") = $2,380.50
$2,380.50
Building plan review fee · add-on
65% of building permit fee — select the permit fee line above to calculate
see rule
Re-inspection fee
$60.00/hour, 1 hour minimum
see rule
○Permit issuance when no other fees apply
Flat fee $60.00
$60.00
Work started without a permit
Permit fees are doubled
see rule
How this jurisdiction calculates the fee

Chandler publishes no flat reroofing fee. Swapping a roof covering for the same material does not require a permit so long as the replacement adds no load to the structural frame. A permit is required when the new roofing is a different material, in which case an engineering analysis must show the existing roof assembly can carry the added load, and also when like material is laid over a roof already carrying more than two layers. Where a permit is required the fee is charged on the valuation of the work under section 4.6.1, with plan review at 65 percent of the permit fee. Fees are effective March 2, 2026.

Source: published fee schedule · Verified 11/16/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Retaining wall four feet tall or under, carrying no surcharge
No permit required
see rule
○Building permit fee, total valuation $1.00 to $500
Flat fee $50.00
$50.00
○Building permit fee, total valuation $501 to $2,000
$50.00 for the first $500.00, plus 2,495 x $1.20 for $249,500.00 over (rounded up per "or fraction thereof") = $3,044.00
$3,044.00
○Building permit fee, total valuation $2,001 to $25,000
$68.00 for the first $2,000.00, plus 248 x $12.50 for $248,000.00 over (rounded up per "or fraction thereof") = $3,168.00
$3,168.00
○Building permit fee, total valuation $25,001 to $50,000
$355.50 for the first $25,000.00, plus 225 x $9.00 for $225,000.00 over (rounded up per "or fraction thereof") = $2,380.50
$2,380.50
○Zoning Clearance (required for all fences and walls)
Flat fee $120.00
$120.00
Building plan review fee · add-on
65% of building permit fee — select the permit fee line above to calculate
see rule
Re-inspection fee
$60.00/hour, 1 hour minimum
see rule
○Permit issuance when no other fees apply
Flat fee $60.00
$60.00
Work started without a permit
Permit fees are doubled
see rule
How this jurisdiction calculates the fee

Chandler publishes no flat retaining wall fee. A wall holding back earth needs a building permit once it stands more than four feet tall, measured from the base of the footing up to the wall crest, and a permit is required at any height where the wall carries a surcharge. City code separately limits wall height in front and side yards. Walls four inches thick are not an approved retaining system. Where a permit is required the fee is charged on the valuation of the work under section 4.6.1, with plan review at 65 percent of the permit fee. Fees are effective March 2, 2026.

Source: published fee schedule · Verified 11/16/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential ramada/accessory storage building permit fee
Flat fee $150.00
$150.00
One-story detached accessory structure of 120 square feet or less and no taller than seven feet
No building permit required
see rule
○Administrative fee for permits from approved standard plans
Flat fee $75.00
$75.00
Building plan review fee · add-on
65% of building permit fee — select the permit fee line above to calculate
see rule
Re-inspection fee
$60.00/hour, 1 hour minimum
see rule
○Permit issuance when no other fees apply
Flat fee $60.00
$60.00
Work started without a permit
Permit fees are doubled
see rule
How this jurisdiction calculates the fee

A residential ramada or accessory storage building carries a flat permit fee listed among the miscellaneous fees in section 4.6.4. A single story detached accessory structure needs no building permit where its floor area stays at or under 120 square feet and it stands no taller than seven feet. Zoning setbacks, a rear area coverage limit and a fifteen foot height cap still apply to accessory buildings. Fees are effective March 2, 2026.

Source: published fee schedule · Verified 11/13/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Like-for-like replacement of a residential water heater
No permit required, no fee
see rule
○Miscellaneous minor residential work (1-6 gas outlets, 1-2 branch electrical circuits, 1-6 plbg. openings, etc.)
Flat fee $100.00
$100.00
○Residential solar water heating system permit fee (a distinct product, not a storage water heater)
Flat fee $150.00
$150.00
○Building permit fee, total valuation $1.00 to $500
Flat fee $50.00
$50.00
Building plan review fee · add-on
65% of building permit fee — select the permit fee line above to calculate
see rule
Re-inspection fee
$60.00/hour, 1 hour minimum
see rule
○Permit issuance when no other fees apply
Flat fee $60.00
$60.00
Work started without a permit
Permit fees are doubled
see rule
How this jurisdiction calculates the fee

Chandler requires no permit to swap a residential water heater for a comparable unit, so a straight replacement carries no permit fee, and the citywide fee schedule has no line item for a conventional storage water heater. Where plumbing work does need a permit, minor residential work covering up to six plumbing openings is charged a flat miscellaneous fee and larger work is charged on the valuation of the project under section 4.6.1. A separate flat fee applies to a residential solar water heating system, which is a different product from a storage water heater. Fees are effective March 2, 2026.

Source: published fee schedule · Verified 11/16/2026

See the full write-up: Chandler building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.