Gilbert, Arizona Building Permit Cost Calculator
Estimates permit cost in Gilbert from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Total valuation $1.00 to $1,100.00 Flat fee $50.00 | $50.00 |
Total valuation $1,100.01 to $2,000.00 $50.00 for the first $1,100 plus $3.00 for each additional $100 or fraction thereof, to and including $2,000 | see rule |
Total valuation $2,000.01 to $25,000.00 $75.00 for the first $2,000 plus $12.50 for each additional $1,000 or fraction thereof, to and including $25,000 | see rule |
Total valuation $25,000.01 to $50,000.00 $355.00 for the first $25,000 plus $9.00 for each additional $1,000 or fraction thereof, to and including $50,000 | see rule |
Total valuation $50,000.01 to $100,000.00 $580.00 for the first $50,000 plus $6.25 for each additional $1,000 or fraction thereof, to and including $100,000 | see rule |
○Total valuation $100,000.01 to $250,000.00 $895.00 for the first $100,000.00, plus 150 x $5.00 for $150,000.00 over (rounded up per "or fraction thereof") = $1,645.00 | $1,645.00 |
○Total valuation $250,000.01 to $500,000.00 $250,000.00 is within the first $250,000.00, so the base $2,900.00 applies | $2,900.00 |
○Total valuation $500,000.01 to $1,000,000.00 $250,000.00 is within the first $500,000.00, so the base $5,000.00 applies | $5,000.00 |
○Total valuation $1,000,000.01 and up $250,000.00 is within the first $1,000,000.00, so the base $3,500.00 applies | $3,500.00 |
Building plan review fee · add-on 65% of calculated Building Permit Fee — select the permit fee line above to calculate | see rule |
Express Permitting Plan Review Fee + 60% of the total plan fee | see rule |
Permit by Appointment (PBA) Plan Review Fee + 20% of the total plan review fee + $93/hour for each staff member required to be in attendance | see rule |
Expedited Plan Review 2 times the total plan review fee | see rule |
○Standard Home Review Flat fee $80.00 | $80.00 |
○Demolition Permit Flat fee $150.00 | $150.00 |
○Re-inspection Fee Flat fee $150.00 | $150.00 |
○Inspection outside normal business hours Flat fee $150.00 | $150.00 |
○Inspections w/o specific fee Flat fee $150.00 | $150.00 |
○Plan review/revisions where no fee specifically indicated Flat fee $150.00 | $150.00 |
○Additional plan review charge may be assessed when a 3rd or subsequent review is necessary Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
The building permit fee is set by a graduated table keyed to total valuation, determined from the Building Valuation Data as released by the International Code Council. The building plan review fee is 65% of the calculated building permit fee. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). The Gilbert Development Services Fee Schedules PDF (20 pages) was downloaded and read in full. THE 9/15/2026 REVISION SCARE IS RESOLVED FOR A SECOND CONSECUTIVE PASS AND NOW PRECISELY LOCATED: only page 1, the table of contents, is footed "Revised 9/15/2026"; every one of pages 2 through 20 is footed "Revised 7/1/2026", and the Building Valuation Data and Permit Fees section (pages 7-8) and Applied Miscellaneous Building Fees section (pages 9-10) that carry every figure on this row are among them. All figures re-read verbatim, including the $50.00 fee for total valuation $1.00 to $1,100.00, the whole valuation ladder up to "$3,500.00 for the first $1,000,000 plus $1.25", the 65 percent building plan review, the $80 Standard Home Review, the $150 Demolition Permit and the $150 Re-inspection Fee. No supersession.
Source: published fee schedule · Verified 9/28/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Individual Electrical Permit - Residential Flat fee $150.00 | $150.00 |
○Individual Electrical Permit - Commercial Flat fee $300.00 | $300.00 |
○Re-inspection Fee Flat fee $150.00 | $150.00 |
○Inspection outside normal business hours Flat fee $150.00 | $150.00 |
○Inspections w/o specific fee Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
Electrical work permitted on its own is charged a flat individual trade permit fee, with additional inspection and plan review charges billed separately. | 2026-09-25 (lane B run 1754) RE-VERIFIED VERBATIM, DOCUMENT REVISED SINCE OUR LAST CHECK BUT NOT ON THIS ROW'S PAGES. The cited showpublisheddocument now carries "Revised 9/15/2026" on page 1, ten days newer than our previous verified_at, which made it a supersession candidate. It is not one: the 9/15/2026 revision is confined to the Planning & Development Fees page; every Building Safety page, including the Applied Miscellaneous Building Fees page that carries these fees, is footed "Revised 7/1/2026". All five stored figures read verbatim - Individual Electrical Permit Residential $150 and Commercial $300, Re-inspection Fee $150, Inspection outside normal business hours $150 per hour (2 hour minimum), Inspections w/o specific fee $150 per hour (1 hour minimum).
Source: published fee schedule · Verified 9/25/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Walls/Fences with single family permit Flat fee $120.00 | $120.00 |
○Walls/Fences separate permit - single family Flat fee $180.00 | $180.00 |
○Walls/Fences separate permit - non-single family Flat fee $260.00 | $260.00 |
○Walls/Fences subdivision perimeter Flat fee $700.00 | $700.00 |
How this jurisdiction calculates the fee
Walls and fences are charged a flat permit fee that depends on whether the work is included with a single family permit or applied for separately.
Source: published fee schedule · Verified 9/25/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Re-roofing that does not require a structural change - exempt from permit Flat fee $0.00 | $0.00 |
○Building permit fee where the re-roof does involve a structural change, lowest valuation bracket ($1.00 to $1,100) Flat fee $50.00 | $50.00 |
○Building permit fee, total valuation $2,000.01 to $25,000 $75.00 for the first $2,000.00, plus 248 x $12.50 for $248,000.00 over (rounded up per "or fraction thereof") = $3,175.00 | $3,175.00 |
Building plan review fee · add-on 65% of the calculated building permit fee — select the permit fee line above to calculate | see rule |
○Re-inspection fee Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
No permit, and therefore no fee, for a straightforward re-roof. Gilbert amends the work-exempt-from-permit lists in both the adopted building code and the adopted residential code (sections 105.2 and R105.2) to add re-roofing that does not require a structural change as exempt work. A re-roof that does involve a structural change needs a building permit, and that is priced from the Building Permit and Plan Review Fees Table in the Town of Gilbert Development Services Fee Schedules (revised 7/1/2026), using a total valuation taken from the ICC Building Valuation Data table that the Building Official adopts each July 1. Building plan review is 65% of the calculated building permit fee.
Source: published fee schedule · Verified 9/15/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Wall or fence permitted together with a single-family permit Flat fee $120.00 | $120.00 |
○Wall or fence, separate permit, single family Flat fee $180.00 | $180.00 |
○Wall or fence, separate permit, non-single-family Flat fee $260.00 | $260.00 |
○Subdivision perimeter wall or fence Flat fee $700.00 | $700.00 |
○Re-inspection fee Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
A retaining wall needs a permit in Gilbert - the adopted exempt-work list only excuses fences not over 3 feet high and equipment screen walls not over 5 feet, and retaining walls are not exempted. The charge is the flat Walls/Fences line in the Applied Miscellaneous Building Fees table of the Town of Gilbert Development Services Fee Schedules (revised 7/1/2026); it is not valuation-based. The amount depends on whether the wall is permitted alongside a single-family house permit or on its own, and on whether the property is single-family.
Source: published fee schedule · Verified 9/15/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Detached non-habitable accessory structure of 200 square feet or less - exempt from permit Flat fee $0.00 | $0.00 |
○Building permit fee for a shed requiring a permit, lowest valuation bracket ($1.00 to $1,100) Flat fee $50.00 | $50.00 |
○Building permit fee, total valuation $1,100.01 to $2,000 $50.00 for the first $1,100.00, plus 2,489 x $3.00 for $248,900.00 over (rounded up per "or fraction thereof") = $7,517.00 | $7,517.00 |
○Building permit fee, total valuation $2,000.01 to $25,000 $75.00 for the first $2,000.00, plus 248 x $12.50 for $248,000.00 over (rounded up per "or fraction thereof") = $3,175.00 | $3,175.00 |
Building plan review fee · add-on 65% of the calculated building permit fee — select the permit fee line above to calculate | see rule |
○Re-inspection fee Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
Small sheds are exempt. Gilbert's amended residential exempt-work list covers a one-story detached non-habitable accessory structure of not more than 200 square feet, provided it is not used for marijuana cultivation, extraction or industrial-type processes. The building-code list separately exempts a prefabricated non-combustible factory-built storage structure of not more than 160 square feet that is not served by utilities, sits at least 5 feet from a real or imaginary property line, and is the only such structure on the property. A shed above those limits needs a building permit, and Gilbert publishes no flat shed fee: it is priced from the Building Permit and Plan Review Fees Table in the Town of Gilbert Development Services Fee Schedules (revised 7/1/2026), using a total valuation from the ICC Building Valuation Data table the Building Official adopts each July 1, under which a detached utility structure is Group U utility/miscellaneous. Building plan review is 65% of the calculated permit fee.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Like-for-like non-tankless water heater replacement by an Arizona licensed contractor - exempt from permit Flat fee $0.00 | $0.00 |
○Individual Plumbing Permit, residential Flat fee $150.00 | $150.00 |
○Individual Plumbing Permit, commercial Flat fee $300.00 | $300.00 |
○Re-inspection fee Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
Most like-for-like water heater replacements are exempt from permit in Gilbert. The amended exempt-work lists cover replacement of solar, gas (at equal or lower BTU/CFH rating) and electric (at equal or lower amperage/voltage rating) water heating systems and appliances when installed by an Arizona licensed contractor and listed and labeled by a nationally recognized third-party testing agency; tankless systems are specifically excluded from the exemption. Where the exemption does not apply - a tankless conversion, an upsized unit, or work not performed by a licensed contractor - the work is permitted as an Individual Plumbing Permit, a flat fee in the Applied Miscellaneous Building Fees table of the Town of Gilbert Development Services Fee Schedules (revised 7/1/2026).
Source: published fee schedule · Verified 9/15/2026
See the full write-up: Gilbert building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.