B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Scottsdale, Arizona Building Permit Cost Calculator

Estimates permit cost in Scottsdale from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Base fee, any single-family permit category
Flat fee $237.00
$237.00
○Livable area with A/C, per square foot
Flat fee $0.94
$0.94
○Covered area, non A/C, per square foot
Flat fee $0.54
$0.54
○Certificate of Occupancy (custom home, addition, detached structure)
Flat fee $195.00
$195.00
○GIS fee (custom home, addition, detached structure)
Flat fee $379.00
$379.00
○Lowest Floor Certificate Review, special flood hazard areas
Flat fee $363.00
$363.00
How this jurisdiction calculates the fee

Scottsdale prices single-family building permits as a flat base fee plus an area rate, per the FY26-27 Permit Fee Schedule adopted by Resolution No. 13661, effective July 1, 2026. Every residential category carries a $237 base fee, then $0.94 per square foot of livable area with A/C and $0.54 per square foot of covered non-A/C area. A remodel is charged at 30% of the livable rate, and a remodel that modifies the roof at 70%. New construction and additions add a $195 Certificate of Occupancy fee and a $379 GIS fee, and plan review is billed separately at $0.54 per square foot of livable area and $0.34 per square foot of covered area.

Source: published fee schedule · Verified 10/30/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum Permit (one discipline)
Flat fee $121.00
$121.00
○Minimum Combination (all disciplines)
Flat fee $379.00
$379.00
○Temporary Power Pole
Flat fee $121.00
$121.00
○Solar Residential
Flat fee $168.00
$168.00
How this jurisdiction calculates the fee

Scottsdale publishes no line item for a standalone electrical permit anywhere in the FY26-27 fee schedules (Resolution No. 13661, effective July 1, 2026). Electrical is instead one of the four trade disciplines (building, plumbing, electrical, mechanical) selected on the city Building Permit Fee Calculator, so an electrical-only permit falls to the Miscellaneous Minimum Permit fee for one discipline, and a permit covering all trades to the Minimum Combination fee. Where electrical work is part of a larger residential project, its cost is already carried by that project base fee and area rates. A few electrical items are separately priced, notably a temporary power pole and residential solar.

Source: published fee schedule · Verified 11/13/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Fence walls, base fee
Flat fee $237.00
$237.00
○Fence walls, per linear foot
Flat fee $0.27
$0.27
○Retaining walls, base fee
Flat fee $237.00
$237.00
○Retaining walls, per linear foot
Flat fee $2.49
$2.49
How this jurisdiction calculates the fee

Walls and fences over 3 feet need a permit, priced under the Fence walls line of the FY26-27 Single Family Residential Permit Fee Schedule (Resolution No. 13661, effective July 1, 2026): a $237 base fee plus $0.27 per linear foot. Plan review is billed separately at $0.18 per linear foot, or $121 per hour plus $0.18 per linear foot when the fence is reviewed on its own. Note that a retaining wall is a distinct line item at the same $237 base fee but a much higher $2.49 per linear foot.

Source: published fee schedule · Verified 10/29/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum Permit (one discipline)
Flat fee $121.00
$121.00
○Minimum Combination (all disciplines)
Flat fee $379.00
$379.00
○Reinspection
Flat fee $121.00
$121.00
How this jurisdiction calculates the fee

Roof recovering with similar material needs no permit, and Scottsdale publishes no reroof-specific fee line in any FY26-27 fee schedule (Resolution No. 13661, effective July 1, 2026). The city re-roofing handout states a building permit is required if any part of the roof sheathing or structural framing is repaired or replaced. A roof-only permit therefore falls to the Miscellaneous Minimum Permit fee for a single discipline. Where the roof work is part of a house remodel, the Single Family Remodel with Roof Modification category applies instead, at a $237 base fee plus 70% of the $0.94 per square foot livable rate.

Source: published fee schedule · Verified 10/29/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Retaining Walls - Base fee
Flat fee $237.00
$237.00
Retaining Walls - Linear footage
$2.49 ln. ft.
see rule
How this jurisdiction calculates the fee

A retaining wall permit is charged as a base fee plus a rate per linear foot of wall. | 2026-09-25 (lane B run 1754) RE-VERIFIED VERBATIM against the Scottsdale FY26-27 residential permit fee schedule: Retaining Walls base fee $237 plus $2.49 per linear foot. The cited path is itself the fees-fy26-27 directory, i.e. the current fiscal-year edition.

Source: published fee schedule · Verified 11/11/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Single Family Detached Structure, base fee
Flat fee $237.00
$237.00
○Livable area with A/C, per square foot
Flat fee $0.94
$0.94
○Covered area, non A/C, per square foot
Flat fee $0.54
$0.54
○Certificate of Occupancy
Flat fee $195.00
$195.00
○GIS fee
Flat fee $379.00
$379.00
How this jurisdiction calculates the fee

A detached, non-habitable structure under 200 square feet needs no building permit, only a courtesy site plan review. A shed that does require a permit is charged under the Single Family Detached Structure line of the FY26-27 Permit Fee Schedule (Resolution No. 13661, effective July 1, 2026): a $237 base fee plus $0.94 per square foot of livable area with A/C and $0.54 per square foot of covered non-A/C area. A Certificate of Occupancy fee of $195 and a GIS fee of $379 also apply to this category, and plan review is billed separately.

Source: published fee schedule · Verified 11/13/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Water Heaters (except solar)
Flat fee $63.00
$63.00
○Solar Water Heaters
Flat fee $90.00
$90.00
○Minimum Permit (one discipline), per the same schedule
Flat fee $121.00
$121.00
How this jurisdiction calculates the fee

Scottsdale charges a flat, published fee for a water heater rather than pricing it by valuation. The FY26-27 Miscellaneous Permit Fee Schedule (Resolution No. 13661, effective July 1, 2026) lists Water Heaters (except solar) at $63 and Solar Water Heaters at $90. Note that the same schedule sets a Minimum Permit (one discipline) fee of $121, which appears to sit above the specific water heater line, so confirm the amount with the One Stop Shop when applying.

Source: published fee schedule · Verified 11/13/2026

See the full write-up: Scottsdale building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.