Tucson, Arizona Building Permit Cost Calculator
Estimates permit cost in Tucson from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Construction valuation $1 to $2,000 $89.45 base fee | see rule |
Construction valuation $2,000.01 to $25,000 $89.45 base fee plus $22.95 per additional $1,000 | see rule |
Construction valuation $25,000.01 to $50,000 $617.30 base fee plus $16.83 per additional $1,000 | see rule |
Construction valuation $50,000.01 to $100,000 $1,038.05 base fee plus $9.64 per additional $1,000 | see rule |
Construction valuation $100,000.01 to $500,000 $1,520.05 base fee plus $8.25 per additional $1,000 | see rule |
Construction valuation $500,000.01 to $1,000,000 $4,800.05 base fee plus $7.45 per additional $1,000 | see rule |
Construction valuation $1,000,000.01 and above $8,525.05 base fee plus $5.45 per additional $1,000 | see rule |
Building staff review and deferred submittal, residential · add-on 50% of building permit fee — select the permit fee line above to calculate | see rule |
Deferred submittal of staff review · add-on 25% of building staff review fee — select the permit fee line above to calculate | see rule |
Residential Level 1 alteration - removal and replacement of existing materials and equipment, or fixtures · add-on 5% of standard valuation — select the permit fee line above to calculate | see rule |
Residential Level 2 alteration, as classified under the International Existing Building Code · add-on 15% of standard valuation — select the permit fee line above to calculate | see rule |
Residential Level 3 alteration - work area exceeds 50% of the building area · add-on 30% of standard valuation — select the permit fee line above to calculate | see rule |
Phased projects, residential, Phase 1 - Foundation · add-on 25% of building fee — select the permit fee line above to calculate | see rule |
Phased projects, residential, Phase 2 - Completion · add-on 75% of building fee — select the permit fee line above to calculate | see rule |
○Trade permits, single item Flat fee $150.00 | $150.00 |
Trade permits, 2 or more items $150.00 for first item + $50.00 for each additional item | see rule |
○Solar permits - photovoltaic electrical, 1 to 30 panels Flat fee $122.46 | $122.46 |
Private swimming pool $730.28 + plan review fee at standard hourly rate, minimum 1 hour | see rule |
Masonry walls $16.85 + $33.70 per 500 square feet of surface area + plan review fee at standard hourly rate, minimum 1/2 hour | see rule |
Wood and metal fences $28.08 + $5.62 per 100 linear feet + plan review fee at standard hourly rate, minimum 1/2 hour | see rule |
○Interior and/or exterior demolition $0.02 x 2,000 = $33.70 | $33.70 |
Digital filing fee · add-on 1% of the total fee, minimum $18.54 — select the permit fee line above to calculate | see rule |
○Pre-application conference - residential development of 1 to 4 units Flat fee $150.00 | $150.00 |
Plan re-submittal, beyond first two submittals prior to issuance · add-on 25% of original staff review fee — select the permit fee line above to calculate | see rule |
Expedited staff review - review completed in half of maximum standard review time · add-on 100% of original staff review fee — select the permit fee line above to calculate | see rule |
Re-inspection of a single item, beyond the first two inspections Per hour, minimum 1 hour | see rule |
Inspections after regular business hours, same-day, weekend and holidays Overtime hourly rate, minimum 2 hours | see rule |
Work started without required permit - penalty · add-on 100% of permit fee — select the permit fee line above to calculate | see rule |
○Standard hourly rate Flat fee $100.00 | $100.00 |
○Overtime hourly rate Flat fee $200.00 | $200.00 |
How this jurisdiction calculates the fee
Building permit fees for new construction are calculated from the project's construction valuation using a table of base fees plus an increment for each additional $1,000 of valuation. Construction valuation is taken from the signed construction contract, or from the ICC Building Valuation Table where no contract value is provided; alterations to existing buildings are instead valued as a percentage of that standard valuation according to the level of alteration. Building staff review is charged as a percentage of the building permit fee, and a digital filing fee applies to all activities. Values are rounded up to the nearest fee threshold, except acreage-based fees, which are rounded to the nearest hundredth of an acre. Residential projects are defined as one- and two-family dwellings and their associated structures. BLOCK RESOLVED 2026-09-03: tucsonaz.gov returns 403 to browser user-agents but serves the PDF normally to a plain "curl/8.5.0" user-agent. The FY27 Planning and Permitting Fee Schedule was downloaded and read with pdftotext -layout, and section 4-02.4.0 Construction Valuation Table confirms every stored figure with its own two-column structure of Base fee and Increment per additional $1,000: $89.45/$0.00, $89.45/$22.95, $617.30/$16.83, $1,038.05/$9.64, $1,520.05/$8.25, $4,800.05/$7.45 and $8,525.05/$5.45. The row misalignment reported by the two prior passes was an artifact of reading this table through WebFetch, not a defect in the stored data. UNRESOLVED READ, 2026-09-11, ROW LEFT UNSTAMPED: the FY27 schedule at the cited URL is still live, but with curl egress refused this pass it could only be read through WebFetch, whose output for the Construction Valuation Table is demonstrably column-misaligned (it returned the Flat Fees/Variable Fees columns against the wrong bands). Two figures came back that do not match this row and must be checked against a pdftotext -layout read before anything is changed: the $1-$2,000 band returned $9.64 where this row carries an $89.45 base fee, and the Overtime Hourly Rate returned $308.96 where this row carries $200.00. Nothing was rewritten and no figure was treated as superseded. 2026-09-11b RE-READ, STILL NOT RESOLVED, ROW LEFT UNSTAMPED: the FY27 schedule is still live at the cited URL. Asking WebFetch for the Construction Valuation Table column headers first returned "Section | Planning and Permitting Fee Schedule | Flat Fees | Variable Fees | Comments" and then a set of band values that are SHIFTED BY ONE BAND against this row: it reported $9.64 at the $1-$2,000 band (our $50,000.01-$100,000 increment), $337.05 and $617.30 and $1,038.05 and $1,520.05 and $4,800.05 each one band lower than we store them, and never returned $89.45, $8.25, $7.45, $5.45 or $8,525.05 at all. That the reported values are our own figures displaced by exactly one row is positive evidence of a WebFetch table-alignment artifact rather than a fee change, and is why nothing was written. Overtime Hourly Rate again returned $308.96 against our $200.00 and is subject to the same doubt. One pdftotext -layout read closes this out. | 2026-09-14 (lane B run 1131), STANDING WEBFETCH DISAGREEMENT RESOLVED. Runs 681/698/712 recorded that WebFetch returned band values shifted by one band and figures that never appear in the document. The FY27 schedule PDF (fy27_fee_schedule_nt.pdf, produced 2026-07-01) was downloaded DIRECTLY this pass and read with pdftotext -layout. Sections 4-02.4.2 through 4-02.4.8 print exactly $89.45/$0.00, $89.45/$22.95, $617.30/$16.83, $1,038.05/$9.64, $1,520.05/$8.25, $4,800.05/$7.45, $8,525.05/$5.45. Standard hourly rate $100.00 and overtime $200.00 (4-01.6.1/6.2), private swimming pool $730.28 (4-02.10.7), digital filing fee 1% min $18.54 (4-01.5.1), trade permits $150.00 / $150.00+$50.00 (4-02.9.1/9.2), solar PV $122.46, masonry walls $16.85+$33.70, wood and metal fences $28.08+$5.62 per 100 lf, demolition $84.26 per 5,000 sq ft, alteration levels 5/15/30 percent, phased 25/75 percent. ALL 30 STORED FIGURES CONFIRMED VERBATIM. The WebFetch readings were artifacts, not fee changes.
Source: published fee schedule · Verified 9/30/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Deck sitting 30 inches or less off the ground, not over a basement, outside setbacks No permit required | see rule |
Construction valuation $1 to $2,000 $89.45 base fee | see rule |
Construction valuation $2,000.01 to $25,000 $89.45 base fee plus $22.95 per additional $1,000 | see rule |
Construction valuation $25,000.01 to $50,000 $617.30 base fee plus $16.83 per additional $1,000 | see rule |
Construction valuation $50,000.01 to $100,000 $1,038.05 base fee plus $9.64 per additional $1,000 | see rule |
Building staff review and deferred submittal, residential · add-on 50% of building permit fee — select the permit fee line above to calculate | see rule |
Plan re-submittal, beyond first two submittals prior to issuance · add-on 25% of original staff review fee — select the permit fee line above to calculate | see rule |
Re-inspection of a single item, beyond the first two inspections Per hour, minimum 1 hour | see rule |
Inspections after regular business hours, same-day, weekend and holidays Overtime hourly rate, minimum 2 hours | see rule |
Work started without required permit - penalty · add-on 100% of permit fee — select the permit fee line above to calculate | see rule |
○Standard hourly rate Flat fee $100.00 | $100.00 |
○Overtime hourly rate Flat fee $200.00 | $200.00 |
Digital filing fee · add-on 1% of the total fee, minimum $18.54 — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
A deck whose surface sits 30 inches or less off the ground needs no permit, provided it is not built over a basement and clears the required setbacks. Anything higher does need one, and the schedule carries no deck-specific amount. The charge is therefore the building permit fee for new construction taken from the construction valuation table, plus building staff review at 50% of that fee for residential work, plus the digital filing fee of 1% of the total with an $18.54 minimum. Amounts are from the FY27 Planning and Permitting Fee Schedule, adopted by Mayor and Council on May 19, 2026 and effective July 1, 2026.
Source: published fee schedule · Verified 9/30/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Trade permits, single item Flat fee $150.00 | $150.00 |
Trade permits, 2 or more items $150.00 for first item + $50.00 for each additional item | see rule |
○Solar permits - photovoltaic electrical, 1 to 30 panels Flat fee $122.46 | $122.46 |
○Solar permits - photovoltaic electrical, 31 to 100 panels Flat fee $199.98 | $199.98 |
Solar permits - photovoltaic electrical, 101 or more panels $199.98 + $1.12 for each panel over 100 | see rule |
Supplementary equipment for photovoltaic electrical systems $28.09 for each additional item | see rule |
○Sign review - electrical Flat fee $97.11 | $97.11 |
Building staff review and deferred submittal, residential · add-on 50% of building permit fee — select the permit fee line above to calculate | see rule |
Plan re-submittal, beyond first two submittals prior to issuance · add-on 25% of original staff review fee — select the permit fee line above to calculate | see rule |
Re-inspection of a single item, beyond the first two inspections Per hour, minimum 1 hour | see rule |
Inspections after regular business hours, same-day, weekend and holidays Overtime hourly rate, minimum 2 hours | see rule |
Work started without required permit - penalty · add-on 100% of permit fee — select the permit fee line above to calculate | see rule |
○Standard hourly rate Flat fee $100.00 | $100.00 |
○Overtime hourly rate Flat fee $200.00 | $200.00 |
Digital filing fee · add-on 1% of the total fee, minimum $18.54 — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Most small electrical jobs are priced as trade permits at a flat $150.00, which buys up to half an hour of staff review and permit processing together with two inspections. The listed items include an electric clearance with no new work, replacing an electric service panel like for like up to 400 amps, upgrading or modifying a service panel up to 400 amps, and a new circuit of at most two 20 amp branches. Where one permit covers two or more items the charge is $150.00 for the first and $50.00 for each further item. Photovoltaic systems are priced separately by panel count. Further review or inspection time is billed at the standard hourly rate of $100.00 with a half-hour minimum, and the digital filing fee applies. Amounts are from the FY27 Planning and Permitting Fee Schedule, adopted May 19, 2026 and effective July 1, 2026.
Source: published fee schedule · Verified 10/1/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Wood and metal fences $28.08 + $5.62 per 100 linear feet + plan review fee at standard hourly rate, minimum 1/2 hour | see rule |
Masonry walls $16.85 + $33.70 per 500 square feet of surface area + plan review fee at standard hourly rate, minimum 1/2 hour | see rule |
Building staff review and deferred submittal, residential · add-on 50% of building permit fee — select the permit fee line above to calculate | see rule |
Plan re-submittal, beyond first two submittals prior to issuance · add-on 25% of original staff review fee — select the permit fee line above to calculate | see rule |
Re-inspection of a single item, beyond the first two inspections Per hour, minimum 1 hour | see rule |
Inspections after regular business hours, same-day, weekend and holidays Overtime hourly rate, minimum 2 hours | see rule |
Work started without required permit - penalty · add-on 100% of permit fee — select the permit fee line above to calculate | see rule |
○Standard hourly rate Flat fee $100.00 | $100.00 |
○Overtime hourly rate Flat fee $200.00 | $200.00 |
Digital filing fee · add-on 1% of the total fee, minimum $18.54 — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Fences and walls need a permit so that zoning review can be carried out, and engineered plans are required once a fence passes 6 feet or acts as a retaining wall. A wood or metal fence costs $28.08 plus $5.62 for every 100 linear feet, together with a plan review fee at the standard hourly rate subject to a half-hour minimum. A masonry wall costs $16.85 plus $33.70 for every 500 square feet of surface area on the same plan review basis. The digital filing fee of 1% of the total, with an $18.54 minimum, applies. Amounts are from the FY27 Planning and Permitting Fee Schedule, adopted May 19, 2026 and effective July 1, 2026.
Source: published fee schedule · Verified 10/1/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Replacing roofing material with the same type, no structural work, outside a historic preservation zone No permit required | see rule |
Residential Level 1 alteration - removal and replacement of existing materials and equipment, or fixtures · add-on 5% of standard valuation — select the permit fee line above to calculate | see rule |
Residential Level 2 alteration, as classified under the International Existing Building Code · add-on 15% of standard valuation — select the permit fee line above to calculate | see rule |
Construction valuation $1 to $2,000 $89.45 base fee | see rule |
Construction valuation $2,000.01 to $25,000 $89.45 base fee plus $22.95 per additional $1,000 | see rule |
Construction valuation $25,000.01 to $50,000 $617.30 base fee plus $16.83 per additional $1,000 | see rule |
Construction valuation $50,000.01 to $100,000 $1,038.05 base fee plus $9.64 per additional $1,000 | see rule |
Building staff review and deferred submittal, residential · add-on 50% of building permit fee — select the permit fee line above to calculate | see rule |
Plan re-submittal, beyond first two submittals prior to issuance · add-on 25% of original staff review fee — select the permit fee line above to calculate | see rule |
Re-inspection of a single item, beyond the first two inspections Per hour, minimum 1 hour | see rule |
Inspections after regular business hours, same-day, weekend and holidays Overtime hourly rate, minimum 2 hours | see rule |
Work started without required permit - penalty · add-on 100% of permit fee — select the permit fee line above to calculate | see rule |
○Standard hourly rate Flat fee $100.00 | $100.00 |
○Overtime hourly rate Flat fee $200.00 | $200.00 |
Digital filing fee · add-on 1% of the total fee, minimum $18.54 — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Tucson requires no permit to replace roofing material with the same type where no structural work is involved and the property lies outside a historic preservation zone, so an ordinary reroof attracts no fee at all. Once the work reaches the structure beneath, such as replacing sheathing, decking, joists or trusses, a permit is required and the schedule carries no roofing-specific amount. That work is priced as a residential alteration, valued at a percentage of the standard valuation according to the level of alteration, and the resulting valuation drives the building permit fee, with building staff review at 50% of it and the digital filing fee on top. Amounts are from the FY27 Planning and Permitting Fee Schedule, adopted May 19, 2026 and effective July 1, 2026.
Source: published fee schedule · Verified 11/16/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Masonry walls $16.85 + $33.70 per 500 square feet of surface area + plan review fee at standard hourly rate, minimum 1/2 hour | see rule |
Construction valuation $1 to $2,000 $89.45 base fee | see rule |
Construction valuation $2,000.01 to $25,000 $89.45 base fee plus $22.95 per additional $1,000 | see rule |
Construction valuation $25,000.01 to $50,000 $617.30 base fee plus $16.83 per additional $1,000 | see rule |
Construction valuation $50,000.01 to $100,000 $1,038.05 base fee plus $9.64 per additional $1,000 | see rule |
Building staff review and deferred submittal, residential · add-on 50% of building permit fee — select the permit fee line above to calculate | see rule |
Plan re-submittal, beyond first two submittals prior to issuance · add-on 25% of original staff review fee — select the permit fee line above to calculate | see rule |
Re-inspection of a single item, beyond the first two inspections Per hour, minimum 1 hour | see rule |
Inspections after regular business hours, same-day, weekend and holidays Overtime hourly rate, minimum 2 hours | see rule |
Work started without required permit - penalty · add-on 100% of permit fee — select the permit fee line above to calculate | see rule |
○Standard hourly rate Flat fee $100.00 | $100.00 |
○Overtime hourly rate Flat fee $200.00 | $200.00 |
Digital filing fee · add-on 1% of the total fee, minimum $18.54 — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
The schedule carries no line item for retaining walls as such. A wall that acts as a retaining wall needs engineered plans, and where it is built of masonry the masonry wall charge applies at $16.85 plus $33.70 for every 500 square feet of surface area, together with a plan review fee at the standard hourly rate subject to a half-hour minimum. A retaining wall of other materials falls back on the building permit fee for new construction from the construction valuation table, plus building staff review at 50% of that fee for residential work. The digital filing fee of 1% of the total, with an $18.54 minimum, applies. Amounts are from the FY27 Planning and Permitting Fee Schedule, adopted May 19, 2026 and effective July 1, 2026.
Source: published fee schedule · Verified 11/13/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Shed under 200 square feet with no utilities Site plan with zoning and engineering review; no building inspections | see rule |
Construction valuation $1 to $2,000 $89.45 base fee | see rule |
Construction valuation $2,000.01 to $25,000 $89.45 base fee plus $22.95 per additional $1,000 | see rule |
Construction valuation $25,000.01 to $50,000 $617.30 base fee plus $16.83 per additional $1,000 | see rule |
Construction valuation $50,000.01 to $100,000 $1,038.05 base fee plus $9.64 per additional $1,000 | see rule |
Building staff review and deferred submittal, residential · add-on 50% of building permit fee — select the permit fee line above to calculate | see rule |
Plan re-submittal, beyond first two submittals prior to issuance · add-on 25% of original staff review fee — select the permit fee line above to calculate | see rule |
Re-inspection of a single item, beyond the first two inspections Per hour, minimum 1 hour | see rule |
Inspections after regular business hours, same-day, weekend and holidays Overtime hourly rate, minimum 2 hours | see rule |
Work started without required permit - penalty · add-on 100% of permit fee — select the permit fee line above to calculate | see rule |
○Standard hourly rate Flat fee $100.00 | $100.00 |
○Overtime hourly rate Flat fee $200.00 | $200.00 |
Digital filing fee · add-on 1% of the total fee, minimum $18.54 — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Tucson asks for a permit application and review for every storage shed, playhouse and similar structure, whatever its size and whether or not it carries utilities. One under 200 square feet with no utilities needs a site plan and zoning and engineering review but no building inspections; one at 200 square feet or more, or carrying utilities, or attached to another structure, also needs a building plan and inspections. Fees follow the type of review required and the schedule carries no shed-specific amount, so a shed needing building review is priced from the construction valuation table with building staff review at 50% of the building permit fee, plus the digital filing fee. Amounts are from the FY27 Planning and Permitting Fee Schedule, adopted May 19, 2026 and effective July 1, 2026.
Source: published fee schedule · Verified 9/30/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Trade permits, single item Flat fee $150.00 | $150.00 |
Trade permits, 2 or more items $150.00 for first item + $50.00 for each additional item | see rule |
Building staff review and deferred submittal, residential · add-on 50% of building permit fee — select the permit fee line above to calculate | see rule |
Plan re-submittal, beyond first two submittals prior to issuance · add-on 25% of original staff review fee — select the permit fee line above to calculate | see rule |
Re-inspection of a single item, beyond the first two inspections Per hour, minimum 1 hour | see rule |
Inspections after regular business hours, same-day, weekend and holidays Overtime hourly rate, minimum 2 hours | see rule |
Work started without required permit - penalty · add-on 100% of permit fee — select the permit fee line above to calculate | see rule |
○Standard hourly rate Flat fee $100.00 | $100.00 |
○Overtime hourly rate Flat fee $200.00 | $200.00 |
Digital filing fee · add-on 1% of the total fee, minimum $18.54 — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
Water heater work is priced as a trade permit at a flat $150.00, which buys up to half an hour of staff review and permit processing together with two inspections. Both a like-for-like installation and one that changes fuel type appear on the trade permit list. Where a single permit covers two or more items the charge is $150.00 for the first and $50.00 for each further item. Further review or inspection time is billed at the standard hourly rate of $100.00 with a half-hour minimum, and the digital filing fee of 1% of the total, with an $18.54 minimum, applies. Amounts are from the FY27 Planning and Permitting Fee Schedule, adopted May 19, 2026 and effective July 1, 2026.
Source: published fee schedule · Verified 10/1/2026
See the full write-up: Tucson building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.