Glendale, Arizona Building Permit Cost Calculator
Estimates permit cost in Glendale from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Valuation $1.00 to $500.00 Flat fee $29.79 | $29.79 |
Valuation $501.00 to $2,000.00 $29.79 for the first $500.00 plus $3.85 for each additional $100.00, or fraction thereof, to and including $2,000.00 | see rule |
Valuation $2,001.00 to $25,000.00 $86.64 for the first $2,000.00 plus $17.74 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 | see rule |
Valuation $25,001.00 to $50,000.00 $494.66 for the first $25,000.00 plus $12.78 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 | see rule |
Valuation $50,001.00 to $100,000.00 $814.16 for the first $50,000.00 plus $8.86 for each additional $1,000.00 or fraction thereof, to and including $100,000.00 | see rule |
○Valuation $100,001.00 to $500,000.00 $1,257.16 for the first $100,000.00, plus 150 x $7.07 for $150,000.00 over (rounded up per "or fraction thereof") = $2,317.66 | $2,317.66 |
○Valuation $500,001.00 to $1,000,000.00 $250,000.00 is within the first $500,000.00, so the base $4,085.16 applies | $4,085.16 |
○Valuation $1,000,001.00 and up $250,000.00 is within the first $1,000,000.00, so the base $7,090.16 applies | $7,090.16 |
How this jurisdiction calculates the fee
Building permit fees are based on the valuation of the project as determined by the Building Official, per Table 3A; plan review is charged in addition to the permit fee at 75 percent of the building permit fee (minimum $122.88). | 2026-09-25 (lane B run 1754) SUCCESSOR HUNT DRIVEN TO A DEFINITE ANSWER, NEGATIVE. The cited schedule is headed "Effective May 10, 2019" and is seven years old, which made it the highest-probability supersession in this batch. It is nonetheless CURRENT: the City's Building Permits > Fee Schedule page links exactly /files/assets/city/v/1/econ-dev/documents/may-10-2019-fee-schedule-revised.pdf and labels it "Fee Schedule (PDF, 461KB)", matching the 471,979-byte file downloaded today. The only other fee documents that page links are the impact fee schedule (effective 9-8-25, revised 06-24-2026) and the 2025 DIF Fee Study, neither of which prices building permits. All eight Table 3A valuation tiers verify verbatim, as does the 75-percent plan review with its $122.88 minimum. Note the host 403s a plain client; recovered with a cookie-jar root touch plus same-origin Referer and Sec-Fetch headers.
Source: published fee schedule · Verified 9/25/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Base Permit Fee Flat fee $29.79 | $29.79 |
○Electrical Service - 200A or less Flat fee $38.64 | $38.64 |
○Electrical Service - over 200A Flat fee $78.75 | $78.75 |
○Sub panels Flat fee $38.64 | $38.64 |
Receptacles/Switches/Outlets - first 20 fixtures $1.36 EA | see rule |
Receptacles/Switches/Outlets - additional fixtures $0.89 EA | see rule |
Lighting Fixtures - first 20 fixtures $1.36 EA | see rule |
Lighting Fixtures - additional fixtures $0.89 EA | see rule |
Appliances - 1 HP or less (dishwasher, cook tops, ranges, wall a/c, washing machines, garbage disposals, water heaters, clothes dryers, space heaters, trash compacters) $6.00 EA | see rule |
Livable Floor Area $0.06 SF | see rule |
How this jurisdiction calculates the fee
Electric permit fees are itemized as a base permit fee plus unit charges for each service, panel, fixture and appliance; electrical plan review is 75 percent of the electrical permit fee (minimum $122.88). UNRESOLVED READ, 2026-09-11, ROW LEFT UNSTAMPED: the May 10 2019 Community Development Fee Schedule is confirmed still current (the Building Permits Fee Schedule page links exactly this PDF), and the building, fence and retaining_wall rows were re-read clean against it. The ELECTRICAL section could not be: with curl egress refused this pass, WebFetch was the only reader, and two successive reads returned mutually inconsistent, plainly column-misaligned values for it (Electrical Service 200A or less as $59.01, which is the residential demolition per-structure fee; first 20 fixtures as $6.00 and then $9.19, where this row carries $1.36; Appliances 1 HP or less as $0.06 SF, which is the Livable Floor Area rate). No figure was changed. This row needs a pdftotext -layout read. 2026-09-11b RE-READ, STILL NOT RESOLVED, ROW LEFT UNSTAMPED: a third WebFetch read, this time asking for the electric section column headers before the rows, again returned mutually inconsistent values and again disagreed with the two reads of the earlier pass - Electrical Service 200A or less came back $59.01 (the residential demolition per-structure fee), first 20 receptacles came back $6.00 EA where the previous pass got $9.19, Appliances 1 HP or less came back $9.19 where the previous pass got $0.06 SF, and "Receptacles/Switches/Outlets: Additional fixtures" came back $0.06 SF, which is the Livable Floor Area rate. The figures are swapping positions between reads, which is conclusive evidence of a WebFetch column-alignment artifact rather than a fee change. Nothing was written. The May 10 2019 schedule remains the document the city links. | 2026-09-14 (lane B run 1131), STANDING WEBFETCH DISAGREEMENT RESOLVED. Run 712 recorded that a third WebFetch read disagreed with itself and with the prior pass, with figures swapping positions. The fee schedule PDF (Effective May 10, 2019) was downloaded DIRECTLY this pass: Electric Permit section prints Base Permit Fee $29.79, Electrical Service 200A or less $38.64, over 200A $78.75, Sub panels $38.64, Appliances 1 HP or less $6.00 EA, Livable Floor Area $0.06 SF, Receptacles/Switches/Outlets first 20 fixtures $1.36 EA and additional $0.89 EA, Lighting Fixtures first 20 $1.36 EA and additional $0.89 EA. ALL 10 STORED FIGURES CONFIRMED VERBATIM. The $114.35 a WebFetch read attached to Sub panels is the Electrical Clearance line, and the $13.48 it attached to Appliances is the Mechanical Permit Air Handlers line - misalignment, not change. fee_source_url set.
Source: published fee schedule · Verified 9/30/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Structural Plan Review Flat fee $122.88 | $122.88 |
○Perimeter residential subdivision walls Flat fee $0.12 | $0.12 |
○Fence walls over 6 FT in height Flat fee $0.12 | $0.12 |
How this jurisdiction calculates the fee
Fence and wall permits are charged per square foot of wall under the Fence/Wall Permits schedule, plus a structural plan review fee. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). glendaleaz.gov returned HTTP 200 and the 40-page schedule was read in full. Still headed "Effective May 10, 2019" - seven years old - and still current: run 1754 established that the City's Building Permits Fee Schedule page links exactly this file and no successor. All three stored lines re-read verbatim under the "Fence/Wall Permits:" heading: "Structural Plan Review $122.88 ($61.44 min. for 1/2 hr.)", "Perimeter residential subdivision walls $0.12 per SF", "Fence walls over 6 FT in height $0.12 per SF". No supersession.
Source: published fee schedule · Verified 11/12/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Retaining walls of any height Flat fee $0.19 | $0.19 |
○Structural Plan Review Flat fee $122.88 | $122.88 |
How this jurisdiction calculates the fee
Retaining wall permits are charged per square foot of wall under the Fence/Wall Permits schedule, plus a structural plan review fee.
Source: published fee schedule · Verified 9/25/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Residential building permit, per building Based on the valuation of the project, see Table 3A | see rule |
○Table 3A, total valuation $1.00 to $500.00 Flat fee $29.79 | $29.79 |
Table 3A, total valuation $501.00 to $2,000.00 $29.79 for the first $500.00 plus $3.85 for each additional $100.00, or fraction thereof, to and including $2,000.00 | see rule |
Table 3A, total valuation $2,001.00 to $25,000.00 $86.64 for the first $2,000.00 plus $17.74 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 | see rule |
Residential building plan review (custom home, remodel, room addition plans) · add-on 75% of the building permit fee (min. $122.88) — select the permit fee line above to calculate | see rule |
○Residential site plan review Flat fee $61.44 | $61.44 |
Third or subsequent review of plans $122.88 per hr. (1 hr. min.) | see rule |
○Residential demolition permit, per structure Flat fee $59.01 | $59.01 |
How this jurisdiction calculates the fee
City of Glendale User Fee Schedule (revised May 10, 2019), Residential Fees. Glendale publishes no shed, storage building or accessory structure line item. A detached accessory building is permitted as a residential building permit, and the schedule prices building permits from the valuation of the project under Table 3A. Valuation is set by the Building Official from the Table 3B square-foot construction cost chart, in which private garages and similar accessory buildings fall under the Utility, miscellaneous group. Building plan review and a site plan review are charged in addition to the permit fee.
Source: published fee schedule · Verified 9/15/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Residential plumbing permit, base permit fee Flat fee $29.79 | $29.79 |
○Residential plumbing permit, Water Heater Flat fee $15.58 | $15.58 |
Residential plumbing permit, Fixtures $11.78 EA | see rule |
○Residential plumbing permit, Gas Piping, 5 outlets or less Flat fee $7.78 | $7.78 |
Residential plumbing permit, Gas Piping, each additional outlet $1.36 EA | see rule |
○Residential electric permit, base permit fee Flat fee $29.79 | $29.79 |
Residential electric permit, Appliances 1 HP or less (the listed appliances include water heaters) $6.00 EA | see rule |
○Gas Clearance, when required by the utility company to establish service (inspection not included with mechanical/plumbing permits) Flat fee $114.35 | $114.35 |
○Commercial plumbing permit, base permit fee Flat fee $59.01 | $59.01 |
Commercial plumbing permit, Water Heater $15.37 EA | see rule |
Plumbing plan review · add-on 75% of the plumbing permit fee (min. $122.88) — select the permit fee line above to calculate | see rule |
How this jurisdiction calculates the fee
City of Glendale User Fee Schedule (revised May 10, 2019). A water heater is a named line item in the Plumbing Permit schedule and is charged per unit on top of the plumbing base permit fee, with separate residential and commercial amounts. Where the installation also involves gas piping or electrical work, the gas piping and electric permit line items are charged in addition. Plumbing plan review, where required, is 75 percent of the plumbing permit fee.
Source: published fee schedule · Verified 9/15/2026
See the full write-up: Glendale building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.