B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Peoria, Arizona Building Permit Cost Calculator

Estimates permit cost in Peoria from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Valuation $1.00 to $500.00
Flat fee $87.00
$87.00
Valuation $501.00 to $2,000.00
$87.00 plus $3.05 per each additional $100 or fraction
see rule
Valuation $2,001.00 to $25,000.00
$120.25 plus $14.00 per additional $1,000 or fraction
see rule
Valuation $100,001.00 to $500,000.00
$1,045.25 plus $5.60 per additional $1,000 or fraction
see rule
Plan review · add-on
65% of the building permit fee — select the permit fee line above to calculate
see rule
○Re-inspection fee
Flat fee $230.00
$230.00
How this jurisdiction calculates the fee

Peoria is the classic valuation-table city among these four. Fee Table 27-6 in the city code (most recently amended by Ordinance No. 2025-28, effective November 4, 2025) sets a base building permit fee bracketed by declared project valuation, with an incremental per-$100 or per-$1,000 add-on within each bracket, so the marginal rate falls as project value rises. Plan review is charged as a large percentage of the calculated building permit fee on top of it. Any zero-valuation item defaults to the published minimum permit fee, and failed inspections carry a notably high flat re-inspection charge.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee (all zero valuation items)
Flat fee $87.00
$87.00
○Valuation $1.00 to $500.00
Flat fee $87.00
$87.00
Valuation $2,001.00 to $25,000.00
$120.25 plus $14.00 per additional $1,000 or fraction
see rule
Plan review · add-on
65% of the building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

There is no deck- or patio-cover-specific fee in Fee Table 27-6. A deck or patio cover is priced off the same valuation-bracket building permit table as everything else, using the declared cost of the work, with the minimum permit fee as the floor for very small projects and the plan review percentage added when plans are routed for review. Schedule amended by Ordinance No. 2025-28, effective November 4, 2025.

Source: published fee schedule · Verified 9/15/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee (all zero valuation items)
Flat fee $87.00
$87.00
○Permit - residential solar photovoltaic
Flat fee $184.00
$184.00
○Permit - residential solar de-rate
Flat fee $115.00
$115.00
○Re-inspection fee
Flat fee $230.00
$230.00
How this jurisdiction calculates the fee

Peoria does not use a per-circuit, per-fixture or per-amperage electrical fee table. Electrical permits are priced from the same valuation-bracket building permit table in Fee Table 27-6, with the published minimum permit fee applying to small or zero-valuation jobs. The one electrical-adjacent item that does carry its own flat fee is residential solar photovoltaic, plus a separate flat fee for a solar de-rate. Ordinance No. 2025-28, effective November 4, 2025.

Source: published fee schedule · Verified 9/15/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee (all zero valuation items)
Flat fee $87.00
$87.00
Valuation $501.00 to $2,000.00
$87.00 plus $3.05 per each additional $100 or fraction
see rule
Valuation $2,001.00 to $25,000.00
$120.25 plus $14.00 per additional $1,000 or fraction
see rule
○Re-inspection fee
Flat fee $230.00
$230.00
How this jurisdiction calculates the fee

Fee Table 27-6 has no fence or wall line item. Walls and fences that require a permit are priced from the general valuation-bracket building permit table on the declared cost of the wall, with the published minimum permit fee acting as the floor for short runs, plus the plan review percentage where engineered wall details are reviewed. Ordinance No. 2025-28, effective November 4, 2025.

Source: published fee schedule · Verified 9/15/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee
Flat fee $87.00
$87.00
Valuation $501.00 to $2,000.00
$87.00 plus $3.05 per each additional $100 or fraction
see rule
Valuation $2,001.00 to $25,000.00
$120.25 plus $14.00 per additional $1,000 or fraction
see rule
○Re-inspection fee
Flat fee $230.00
$230.00
How this jurisdiction calculates the fee

Peoria publishes no flat re-roof permit fee. A re-roof is permitted off the standard valuation-bracket table in Fee Table 27-6 using the contract value of the roofing work, so a typical residential re-roof lands in the low brackets and the fee scales with the roofing contract price rather than with roof area. The published minimum permit fee is the floor, and the standard re-inspection charge applies if an inspection fails. Ordinance No. 2025-28, effective November 4, 2025.

Source: published fee schedule · Verified 9/15/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee
Flat fee $87.00
$87.00
Valuation $2,001.00 to $25,000.00
$120.25 plus $14.00 per additional $1,000 or fraction
see rule
Valuation $25,001.00 to $50,000.00
$443.25 plus $10.10 per additional $1,000 or fraction
see rule
Plan review · add-on
65% of the building permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

No accessory-structure line exists in Fee Table 27-6. A permit-required shed or detached garage is priced from the valuation-bracket building permit table on declared construction value, plus the plan review percentage if plans are reviewed, with the minimum permit fee as the floor. Detached structures also get a zoning/setback check against the city's residential structure standards. Ordinance No. 2025-28, effective November 4, 2025.

Source: published fee schedule · Verified 9/15/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum permit fee (all zero valuation items)
Flat fee $87.00
$87.00
○Valuation $1.00 to $500.00
Flat fee $87.00
$87.00
Valuation $501.00 to $2,000.00
$87.00 plus $3.05 per each additional $100 or fraction
see rule
○Re-inspection fee
Flat fee $230.00
$230.00
How this jurisdiction calculates the fee

There is no per-fixture plumbing table and no water-heater line item in Fee Table 27-6. A water heater replacement is a low- or zero-valuation item, so it falls to the published minimum permit fee, or to the lowest valuation bracket if a dollar value is declared. Gas water heaters may pull the gas line scope into the same over-the-counter permit. The high flat re-inspection fee applies if the final inspection fails. Ordinance No. 2025-28, effective November 4, 2025.

Source: published fee schedule · Verified 9/15/2026

See the full write-up: Peoria building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.