424.06 Basis of Payment.
428.01 Description.
This Section shall cover the work of scoring bituminous plant mix pavement surfaces at locations shown on the plans or directed by the Engineer. The scoring shall consist of cutting grooves, at regular intervals in the shoulder pavement surface.
428.02 Ma terials.
N/A
428.03 Construction Requirements.
428.04 Method of Measurement.
The scoring of bituminous pavement surface ordered and accepted will be measured per mile {kilometer} along the centerline of each row of grooves placed either by direct measurement and computation to the nearest 0.001 mile {0.001 kilometer} or by odometer to the nearest 0.001 mile {0.001 kilometer}. When more than one row of grooves is required on a surface, each row will be measured separately. The length of scoring measured will include any gaps shown on the plans as part of the design of the scoring but will not include the length of any other gap or section omitted by the E ngineer.
430.01 Description.
428.05 Basis of Payment.
430.01 Description.
The work under this Section shall consist of constructing a temporary or permanent surface course of soil type material (Selected Material, Granular Soil or Soil Aggregate, etc.) or graded aggregate type material. The plans or proposal will designate the type of material to be used.
430.02 Material.
All material furnished for use shall meet the appropriate requirements of Division 800, Materials, for the classification of material specified by the pay item.
430.03 Construction Requirements.
430.04 Method of Measurement.
The quantity of surfacing material placed on the roadbed will be measured in cubic yards {cubic meters} in accordance with the provisions of Subarticle 109.01(i), or per ton {metric ton} measured by weight {mass} in accordance with the provisions of Subarticle 109.01(h).