430.01 Description.
428.05 Basis of Payment.
430.01 Description.
The work under this Section shall consist of constructing a temporary or permanent surface course of soil type material (Selected Material, Granular Soil or Soil Aggregate, etc.) or graded aggregate type material. The plans or proposal will designate the type of material to be used.
430.02 Material.
All material furnished for use shall meet the appropriate requirements of Division 800, Materials, for the classification of material specified by the pay item.
430.03 Construction Requirements.
430.04 Method of Measurement.
The quantity of surfacing material placed on the roadbed will be measured in cubic yards {cubic meters} in accordance with the provisions of Subarticle 109.01(i), or per ton {metric ton} measured by weight {mass} in accordance with the provisions of Subarticle 109.01(h).
433.02 Materials.
430.05 Basis of Payment.
433.01 Description.
This Section covers the placement of a polymer modified asphalt rejuvenating scrub seal.
433.02 Materials.
All materials shall comply with the requirements of Division 800, Materials, except as noted herein. Special reference is made to the following: