430SOIL OR AGGREGATE TYPE SURFACE

AL · 2022 Standard Specifications✓ Full text on BuildSpecBook pages 247–0 Save this section

Ask about Section 430

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

245

428.05Basis of Payment

(a)Unit Price Coverage.

The scoring of bituminous pavement surface, measured as noted above, will be paid for at the contract unit price bid which shall be full compensation for the scoring of the pavement, and for all materials, equipment, tools, labor, and incidentals necessary to complete the work.

(b)Payment will be made under Item No.:

428-A Scoring Bituminous Pavement Surface – per mile {kilometer} SOIL OR AGGREGATE TYPE SURFACE

430.01Description

The work under this Section shall consist of constructing a temporary or permanent surface course of soil type material (Selected Material, Granular Soil or Soil Aggregate, etc.) or graded aggregate type material. The plans or proposal will designate the type of material to be used.

430.02Material

All material furnished for use shall meet the appropriate requirements of Division 800, Materials, for the classification of material specified by the pay item.

430.03Construction Requirements

(a)Equipment.

Selection of the appropriate type of equipment to satisfactorily accomplish the work will, in general, be at the option of the Contractor.

(b)Preparation of Underlying Surface.

Before placing the surface material, the subgrade shall comply with the requirements of Subarticle

301.03(a)

If the soil or aggregate surfacing is to be used in a temporary manner for handling traffic, the requirements for underlying surface preparation may be modified as shown on the plans, or directed by the Engineer, and control elevation stakes will not be necessary. If the soil or aggregate surfacing is used for shoulder construction adjacent to the resurfacing of the roadway, the requirements given in Subarticle 301.03(a) will not be applicable and the underlying surface shall be compacted as directed by the Engineer.

(c)Placing, Spreading and Shaping.

Local type materials (Selected Material, Granular Soil, and Soil Aggregate) shall be yard mixed as described in Item 301.03(c)3 before being hauled to the roadbed. Approved surfacing material may be dumped directly on the prepared subsurface and the material spread to the width and depth shown on the plans or directed. Water shall be added if so directed. Mixing will not be required unless so specified on the plans. If mixing is specified, it shall be performed in accordance with the requirements of Item 301.03(c)2. Upon completion of the spreading, the material shall be shaped to the cross section shown on the plans and rolled to a smooth riding surface, free from high spots or depressions and satisfactory to the Engineer. Specific density requirements are waived; however, it shall be compacted to the satisfaction of the Engineer. After being placed and shaped to proper crown and grade the surface shall be shaped at frequent intervals as directed and shall be kept free of ruts and holes. New material shall be added and bladed as needed and as directed. The surface shall be maintained in satisfactory condition in the manner described above until the contract is accepted.

430.04Method of Measurement

The quantity of surfacing material placed on the roadbed will be measured in cubic yards {cubic meters} in accordance with the provisions of Subarticle 109.01(i), or per ton {metric ton} measured by weight {mass} in accordance with the provisions of Subarticle 109.01(h). SCRUB SEAL 246

430.05Basis of Payment

(a)Unit Price Coverage.

Surfacing material ordered and accepted, measured as noted above, will be paid for at the contract unit price bid which shall be full compensation for the material complete in place on the roadbed and includes all costs incident to furnishing and producing the material, all hauling, spreading, mixing, watering, compacting, shaping, and for all equipment, tools, labor, and incidentals necessary to complete the work. Additional material used in the maintenance will be measured and paid for under this item.

(b)Payment will be made under Item No.:

430-A Soil Type Surfacing(Kind Material) - per cubic yard {cubic meter} 430-B Aggregate Surfacing(ALDOT Size of Material) - per ton {metric ton} SCRUB SEAL

433.01Description

This Section covers the placement of a polymer modified asphalt rejuvenating scrub seal.

433.02Materials

All materials shall comply with the requirements of Division 800, Materials, except as noted herein. Special reference is made to the following:

(a)Emulsion.

Sources for scrub seal shall meet the requirements given in Article 804.01 and the requirements given in AASHTO M 345-22 Section 5 including 5.1 through 5.5.9. and all tables therein. AASHTO M345 shall be amended as follows:  There shall be no requirement for Demulsibility.  The requirement for Residue by distillation shall be 60% minimum Where AASHTO M 345-22 Table 1 gives options for alternate tests the following shall be used:  Viscosity, Saybolt Furol, 50°C (122°F), s  Penetration, 4°C (39°F), 200g, 60 s, 0.1mm  T 350 Percent Recovery at 0.1 kPa, 52°C (126°F), %  T 350 Jnr at 3.2 kPa, 52°C (126°F), kPa-1 The emulsion manufacturer shall submit certification that the emulsion meets the specification. The manufacturer of the recycling agent, through the emulsion supplier and the contractor, shall submit the test results for the recycling agent and certification that the recycling agent meets the required specifications. Laboratories performing testing on emulsion or rejuvenator must be accredited for the test procedures they perform. Certifications and test results for the emulsion and the recycling agent shall be submitted to the Materials and Tests Engineer and approved Within three (3) days of starting the work.

(b)Aggregate.

The aggregate shall be an ALDOT Size No. 89 or No. 89 Modified in accordance with the material requirements for bituminous surface treatments given in Section 801 and the modified No. 89 gradation below: Sieve % Passing ½” 100 ⅜” 90-100 #4 20-55 #8 0-15 #16 0-10 #50 0-5

SCRUB SEAL 247

433.03Construction Requirements

(a)Placement Rates.

The placement rate for the emulsion shall be from 0.25 to 0.35 gallons per square yard. The Engineer will require that the placement rate be adjusted up or down as necessary to fill the cracks in the roadway while achieving approximately 60-70% aggregate embedment after rolling. The placement rate for the aggregate shall be from 18 to 25 pounds per square yard. The Engineer will require that the placement rate be adjusted so that no bleed through occurs during rolling.

(b)Temperature Limitations.

The scrub seal shall only be placed when the ambient and pavement temperatures are above 50 °F (10 °C) and rising but below a pavement surface temperature of 140 °F (60 °C). The emulsion shall not be placed if there are freezing conditions forecast for 72 hours after placement.

(c)Surface Preparation.

The area to be covered shall be dry to damp with no standing water and cleaned of dirt, vegetation, and dust and other deleterious materials prior to the application of the surfacing. On pavements where the scrub seal is to be the final layer, the Contractor shall remove all existing thermoplastic striping, markings, and legends within the scrub seal limits prior to the scrub seal operation. If a subsequent surface treatment or pavement layer will be placed over the scrub seal, removal of the existing thermoplastic may not be required. Prior to the scrub seal operation, the Contractor shall remove all raised pavement markers including any excessive adhesive left on the pavement caused from the removal of raised pavement markers. Prior to the scrub seal operation, all drain inlet covers, monument covers, and all other utility covers shall be protected from the Contractor’s scrub seal operations by applying a sheet of plastic over the exposed facilities, or other methods approved by the Engineer.

(d)Test Section.

The Contractor shall demonstrate the capability of meeting the placement requirements. The materials used in the test section shall be those that are proposed for production use. The Engineer will identify the location and length of the test section. The test section shall be one lane, 12 feet in width and up 1000 feet long. The Contractor shall verify in the presence of the Engineer the asphalt distributor’s and aggregate spreader’s calibrated application rates. If the application to the test section is unsuccessful, the Contractor shall make the necessary corrections and apply a new test section without additional compensation. The placement rate and adhesion of the emulsion and aggregate will be evaluated.

(e)Equipment.
1.Asphalt Distributor.

An asphalt distributor shall be furnished for the application of the asphalt emulsion. The distributor shall have a full circulating spray bar that is adjustable to at least 16 feet wide in two feet increments and is capable of heating and circulating the emulsion simultaneously. It shall have computerized rate control for adjusting and controlling the application from the cab. The rate shall be is adjustable by .01 gallons per square yard increments. The distributor shall also be equipped with a volume measuring device and a thermometer for measuring the emulsion temperature in the tank.

2.Emulsion Broom.

The emulsion broom sled frame shall be constructed of metal. The emulsion broom sled shall be attached to and pulled by the distributor truck. The emulsion broom sled must be equipped with a means of raising and lowering the emulsion broom sled at desired points. It shall be towable in the elevated position. The broom sled assembly shall be adjustable so that it does not squeegee the emulsion off the roadway surface or outside the framework of the broom sled. The main body of the emulsion broom shall have a minimum frame size of 6.5 feet wide and 10 feet long. The maximum transverse rigid frame width at any point shall not exceed 6.75 feet. The nearest and furthest members, paralleling the back of the spreader truck, and diagonal members shall be equipped with street brooms. The leading member and the trailing member shall have brooms heads angled at 10 to 15 degrees off the centerline of the supporting member. The diagonal members shall have broom heads attached in line with the centerline of the supporting member. Each individual street broom attached to the emulsion broom sled assembly shall be 3.5 inches wide x 6.5 inches high x 16 inches long and have stiff nylon bristles. Bristle height is to be SCRUB SEAL 248

maintained at a minimum of five inches (5”). The emulsion broom shall be equipped with hinged wing assemblies attached to the main body not to exceed 4.5 feet per side, with diagonals and equipped with street brooms. The purpose of the maximum rigid frame width and the hinged wing extensions is not only for maximum width of 16 feet but to maintain the scrubbing process evenly as contours and cross-sections change across the existing road surface.

3.Aggregate Spreader.

A self-propelled spreader with computerized rate control shall be used to spread the aggregate. The spreader shall have front discharge and shall be capable of evenly distributing the aggregate at the required placement rates.

4.Rollers.

Two pneumatic tire rollers shall be used to seat the aggregate into the emulsion. The rollers shall be self-propelled. The minimum total weight of each roller shall be 5 tons.

5.Aggregate Removal Equipment.

A mechanically powered pick-broom shall be furnished with a vacuum for the removal of excess aggregate.

(f)Material Application.

The emulsion broom shall attached to and be pulled behind the emulsion distributor immediately after the application of the emulsion. All cracks in the pavement shall be filled by emulsion by the movement of the weighted emulsion broom through the emulsion. The aggregate shall be dry during spreading. The aggregate shall be evenly spread over the scrubbed emulsion. The seal should be rolled immediately after the aggregate is applied. There shall be at least three passes made with a pneumatic roller. The scrub seal system shall be stiff enough to allow removal of excess aggregate without damage to the pavement surface. The excess aggregate shall be removed with the vacuum broom within two hours of rolling or as directed by the Engineer. The roadway shall not be opened to traffic until at least two hours after the completion of the placement of the emulsion and aggregate and the sweeping operation completed. The Engineer may require a second power sweeping to remove any loose aggregate. Excess aggregate shall be removed from the project unless otherwise approved by the Engineer. For inner layer applications the scrub seal shall be sufficiently cured prior to placing a bituminous overlay, micro-surfacing, or other asphalt surface treatments. The Engineer will require a second power sweeping of the scrub seal surface at least 72 hours after completion of the placement of the emulsion and aggregate to determine the status of the scrub seal being cured. For instances where the scrub seal is to be placed beneath hot mix asphalt of 134 lb/sy or less, the curing period shall be raised from 72 hours to at least 7 days. The ability to sweep all loose aggregate from the surface without removing any aggregate adhered to the bituminous emulsion shall determine that the scrub seal is cured. Longitudinal joints shall not overlap. The longitudinal construction joint shall coincide with the painted lane line or at the outside edge of shoulder.

(g)Sampling.

A minimum of one daily sample of the aggregate will be taken from the application vehicle and tested for gradation. If the average test results vary from the gradation requirements, production shall stop. The Contractor shall identify the cause and document in detail what corrective action was taken. Documentation of the corrective action shall be furnished to the Engineer before placement will be allowed.

(h)Acceptance.

The Contractor shall be responsible for the maintenance of the surface treatment until the work is accepted by the Engineer. Damage or loss of aggregate in the surface exceeding 2 % of the surface area in any 500-foot-long section shall be repaired by use of additional emulsion and aggregate. All bleeding (excess asphalt) surfaces shall be covered with additional concrete sand in such a manner that the asphaltic material will not adhere to or be picked up by the wheels of vehicles. If in the Engineer’s judgment, defective areas warrant removal, the Contractor shall remove and replace those areas at the Contractor’s expense with materials meeting specification requirements.

433.04Method of Measurement

Scrub seal will be measured in units of square yards.

Get an email when 430 changes

Alabama revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Alabama Standard Specifications for Highway Construction, 2022 Edition. Pages 247–0 of 934. View official source ↗

Ask about this section

Scoped to Alabama 2022 Standard Specifications for Highway Construction, Section 430 — SOIL OR AGGREGATE TYPE SURFACE. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.