715.02 Materials.
715.02 Materials.
Materials shal l comply in general with the requirements given in the applicable Sections of Division 800, MATERIALS and in particular to the following: Section 880, SIGN MATERIALS. Section 891, STRUCTURAL MATERIALS FOR TRAFFIC CONTROL DEVICES AND HIGHWAY LIGHTING. Materials shall also comply with requirements that may be given on the Plans . Materials and equipment installed or used without approval of the Engineer shall be at the risk of subsequent rejection. The State will not be liable for materials purchased, work performed, or any delay incurred due to failure of the Contractor to secure prior approval. Failure of the Engineer to note unsatisfactory material as received will not relieve the Contractor of responsibility. Manufacturers' guarantees or warranties on materials customarily provided shall be delivered to the Engineer upon receipt of materials.
715.03 Construction Requirements.
715.04 Method of Measurement.
Overhead Roadway Sign Structures will be measured separately by individual structures, complete in place and fully operational. Sign panels will be measured and paid for under Section 710, with the installation, mounting, etc. performed as provided therein.
715.05 Basis of Payment.
717.01 Description.
This Section shall cover the work of renovating designated existing overhead roadway sign structures. The renovation may include, but not be limited to, refurbishing the sign panels, reworking or replacing the electrical system, and reworking the support system. The plans will show the extent of work to be performed under this item. This Section shall also cover the work of relocating, or partially relocating, designated existing overhead roadway sign structures. The relocation may include, but not be limited to, removal or
717.05 Basis of Payment.
relocation of the existing signs, their supports, and foundations, and the reinstallation of the sign assemblies on their supports with new foundations as detailed on the plans. The plans will show the extent of work to be performed under this item. If new supports or foundations are required, the Contrac tor shall be responsible for the same design requirements as specified in Article 715.01.
717.02 Materials.
Materials involved in the work under this Section will be basically the reuse of existing signs and their supports. No bolts, nuts, or washers which are removed shall be reused; new materials shall be equal to or better in design than the old materials. Any replacement or new materials required shall comply with the appropriate requirements of
Article 715 — 02.
717.03 Construction Requirements.
717.04 Method of Measurement.
Measurement of renovated overhead roadway sign structures will be on a lump sum basis for each individual structure renovated, complete in place and fully operational. Measurement of relocated overhead roadway sign structures will be on a lump sum basis for each individual structure relocated, complete in place and fully operational. Any new sign panels needed will be measured and paid for un der Section 710, with the installation, mounting, etc. performed as outlined therein.
717.05 Basis of Payment.
718.01 Description.
Complete and accepted relocated overhead roadway sign structures, measured as noted above, will be paid for at the contract lump sum price bid for each sign structure, which shall be full compensation for all work and materials, except sign panels, necessary for the removal and relocation of the sign structure (panel, lights, walkway, and supports) complete in place on its supports at the designated locations, for the cleaning of the panels, for furnishing all hardware or other material necessary for the reinstallation of the sign structure, for the satisfactory removal of the existing footings, if necessary, including the excavation and backfill of the areas (old area and new area of the installation), disposal of excess materials, for new foundations for supports, for inspection and testing of welds, and for all other materials, equipment, tools, labor, and incidentals necessary to complete this item of work.
718.01 Description.
This Section shall cover the design, fabrication, and construction of overhead roadway sign, luminaire, traffic signal, and traffic surveillance support structures. All designs and details shall be approved before actual fabrication of a structure is started. Within 30 days after the award of the contract, the Contractor shall notify the Project Manager by letter of the names, addresses and telephone numbers of all structural fabricators along with the fabricator's proposed fabrication schedule. The notification shall be furnished for all structural fabricators that are subcontractors to a structural fabricator.