891STRUCTURAL MATERIALS FOR TRAFFIC CONTROL DEVICES AND HIGHWAY LIGHTING

AL · 2022 Standard Specifications✓ Full text on BuildSpecBook pages 855–0 Save this section

Ask about Section 891

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

812

891.05Prestressed Concrete Poles

Concrete, reinforcing steel and prestressing steel for prestressed concrete poles shall meet the requirements given in Section 513. The concrete shall have a minimum 28-day compressive strength of 5000 psi {35 MPa} or as shown on the plans. The prestressed concrete pole manufacturing plant shall follow the applicable requirements in ALDOT–367, Section 2, except that plant certification by the Precast/Prestressed Concrete Institute Plant Certification Program will not be required. Within 30 days after the award of the contract, the Contractor shall notify the Materials and Tests Engineer in writing of the name and address of the fabricator of the poles. Fabrication will not be allowed to begin until two weeks after the Materials and Tests Engineer has all of the approved details and submittals that are required for a representative of the Department to adequately inspect the fabrication of the poles. The Contractor shall arrange for a representative of the Department to conduct an inspection of the plant facilities and review the plant’s Quality Control/Quality Assurance manual during this two-week time period.

891.06Breakaway Supports

A Federal Highway Administration approved breakaway support shall be installed on each luminaire assembly when indicated on the plans. The pole shall meet the 1985 AASHTO breakaway requirements and FHWA certification of testing must be submitted. The Contractor shall assure the compatibility of the pole base, breakaway support and foundation. Transformer bases shall be used only as a replacement of a like item on an existing installation unless specifically shown otherwise on the plans.

891.07Mast Arms

Mast arms shall be fabricated from steel tubes (except for aluminum poles, which shall have aluminum mast arms) to the lengths specified on the plans and approved shop drawings. Mast arm shafts shall be of one continuous piece without intermediate splices or couplings, provided with rain-tight connections to the shaft of the pole and designed to rotate three hundred and sixty degrees in the horizontal plane. A two piece section, slip joint shaft mast arm will be permitted when plans or proposal require mast arms longer than the manufacturer's length capability. All hardware, except split pole clamps, shall be stainless steel or anodized aluminum. The end of the arm shall be furnished with the type of fitting required by the plans. All connecting joints for attachments for mast arms, shaft extensions and luminaire arms shall be of the design indicated by plan details or approved by the Engineer and shall develop full strength of the joint.

891.08Anchor Bolt Assemblies

Anchor bolt assemblies (anchor bolts, nuts, and washers) shall be in accordance with AASHTO M 314, Grade 36 or Grade 55, except maximum tensile strength on all grades is waived, and capable of transferring the load safely from the structure base plate to the foundation. The exposed end of the anchor bolts shall be threaded (rolled or cut type) and provided with appropriate nuts, including lock nuts and flat washers. The anchor bolts, nuts, and washers shall be hot-dipped galvanized in accordance with AASHTO M 232, however, galvanization of the bolt below 6 inches {152 mm} from the top of the embedment line will not be required. The nuts shall be lubricated with a lubricant containing a visible dye so that a visual check can be made for proper lubrication prior to installation. Special care shall be taken when storing galvanized bolts with a water-soluble lubricant. Anchor bolts for overhead roadway sign structures and high mast lighting assembly poles only, shall meet the requirements provided in AASHTO T 244 for Charpy V-Notch testing. Notch toughness tests on specimens shall be performed in accordance with Test Frequency P (Piece Testing) of AASHTO T 243 with a minimum average value of 15 ft-lb. at 40 F {20 J at 4.4 C} and the notch shall be oriented perpendicular to the longitudinal axes of the anchor bolt. In order to meet the Charpy V-Notch impact requirements, the steel may require heat treatment. The Charpy V-Notch testing equipment shall be calibrated once each year using a National Institute of Standards and Technology check sample. Certification of the annual calibration shall be available to the Department when requested.

891.09Pedestals

If specified by the plans, pedestals shall be furnished for steel and aluminum poles according to the overall length (including cap and base) shown on the plans. Pedestal shafts shall be a one-piece, STRUCTURAL MATERIALS FOR TRAFFIC CONTROL DEVICES AND HIGHWAY LIGHTING 813

continuous taper or parallel wall, circular shaft. Steel shafts shall be of not less than 1/8 inch {3 mm} wall thickness and of a size at the top designed to fit a standard 4 inch {102 mm} slip-fitter attachment. Steel shafts shall have a polished or galvanized finish, which shall be protected during storage and shipment by a suitable protective covering. The covering shall remain on the shaft until installation begins. A one-piece base shall be provided which, when attached to the shaft, will develop the full strength of the shaft to resist bending action. The base shall be provided with four slotted holes for attachment to the base of the foundation. The anchor bolts shall be recessed and ornamental covers provided. A handhole with cover, approximately 4 inches by 6 inches {102 mm by 153 mm} in dimension, shall be provided in the base of the pedestal shaft. A cap for any exposed open end of a pedestal shaft shall be provided. The cap shall be of cast aluminum and of the nipple or tenon mounting type.

INDEX

A abbreviations, 1 abutment and bulkhead anchors, 348 acceptance acceptance inspection, 38 final acceptance, 38 for maintenance, 38 accidents, reporting, 60 adhesives, 756 advertisement for bids, 11 aggregate bases and subbases, 159 coarse, 667 fine, 671 slope protection, 484 aggregate foundations, 463 air entraining additives, 681 asphalt pavement asphalt binders, emulsions, 674 pay factors, 52 quality assurance, 49 quality control, 47 quality control, quality assurance, 46 referee testing, 52 sampling of lots and sublots, 50 smoothness, 221 test strips, 53 testing lots, 51 assignment of contract, 67 authority of inspectors, 36 of the engineer, 27 award of contract, 19 B backfill at bridge structures, 130 at culvert pipes, 407 cement mortar flowable, 156 foundation, 126 barricade permanent, 612 barricades and signs, 56 base, soil and aggregate classification, 159 lime treatment, 161, 162 maintenance of work, 167 mixing, 160 placing, 164 sampling and testing, 165 shoulder, 165 bidders qualifications, 12 bituminous base, 180 surface treatment, triple layer, 203 surface treatments, 183 bonds, 20 bridge deck overlay, 280 bridges, 361 construction requirements, 362 detour, 151 elastomeric bearings, 371 materials for construction, 361 precast non-prestressed concrete members, 372 prestressed concrete members, 377 reinforced concrete decks, 363 seals for joints, 396 Buy America, 39 C cable guiderail, 508 cancelled work, 91 cement masonry, 686 Portland Cement, 685 changed conditions, 22 claims appeal board, 95 auditing, 97 committee, 95 compensation, 96 documentation, 97 notice of intent, 94 record keeping, 94 cleaning drainage structures, 414 clearing and grubbing, 106 coatings. See paint cofferdam and pumping, 310 cofferdams or sheeting and shoring, 130 collusion, 15 combination bids, 16 compaction density requirements, 173 of embankment, 122 of foundation backfill, 127 of lime stabalized roadbed, 149 of soil and aggregate base layers, 165 computer bidding, 15 concrete acceptance, 305 chemical admixtures, 681 classification, 286 construction joints, 294 curing, 299 curing materials, 695 finishing, 302 forms, 294 handling and placing, 292 materials, 285 minor structure, 500 sampling and inspection, 288 seal, 311 concrete pavement cleaning and sealing joints and cracks, 277 construction requirements, 255 grinding pavement surface, 278 materials, 250 pressure grouting, 270 slabjacking, 267 smoothness, 263 conduits INDEX

electrical conduits under roadways, 660 construction fuel, 583 contaminated soil, 154 contract documents furnished by the Department, 34 contract time assignment of contract time, 79 beginning and end of contract time, 80 days work not permitted, 80 extension of contract time, 80 failure to complete work within contract time, 81 contractor's personnel superintendent, 34 cooperation between contractors, 34 culverts concrete box culverts, 398 corrugated metal, 409 pipe, 404 pipe end treatments, 499 curb concrete curb and gutter, 505 D default of contract, 82 definitions, 1–11 delineators, 598 density embankment layers, 174 materials subject to compaction requirements, 174 modified and improved roadbed, 175 non-destructive testing devices, 174 roadbed or lime stabilization, 175 subbase and base layers, 175 disadvantaged business enterprise (DBE), 98 disqualification (from bidding), 12 drainage plane layer, 179 drains grouted rubble, 494 slotted, 410 structures for (inlets, junction boxes), 501 trench, 421 drilled shaft construction casing, 332 concrete placement requirements, 340 construction methods, 332 drilling equipment, 335 encased excavations, 337 materials, 331 slurry, 332 testing, 343 tolerances, 346 drilled shaft excavation exploratory shaft excavation, 336 obstruction removal, 336 slurry, 338 E embankment, 117, 121 encasement pipe for utilities, 541 epoxy adhesive, 757 erosion control excavation, 123 hydraulic erosion control products, 551 rolled erosion control products, 551, 750 temporary erosion control, 560 temporary seeding, 560 errors plan and specifications errors, 34 excavation benching, 121 borrow, 117, 121 channel, 117 disposal of surplus material, 123 finishing and dressing, 123 for bridges, 129 for structures other than bridges, 126 measurement, 124 muck, 117, 120 roadway, 119 roadway and drainage, 117 rock, 120 unclassified, 117 undercutting, 119 extra work, 88 F fence barbed wire, 520 chain link, 516 construction safety, 579 materials for fence, 757 reset, 521 woven wire, 518 field office, 470 final estimate documentation, 93 final inspection, 83 flowable backfill, 156 flumes bituminous treated glass fiber, 496 soil cement flumes, 495 force account work, 88 fuel. See construction fuel full depth reclamation, 168 G gas line, 537 pipe, and appurtenances, 752 geometric controls, 580 geosynthetics reinforcement for slopes and soft soil, 152 geotextiles for paving, 480 for permeable asphalt treated base, 474 for separation of soil and aggregate, 482 for underdrain, 476 material requirements, 682 graves, 115 guardrail, 511 guardrail materials, 755 relocate, 514

INDEX

H handrail for bridges and sidewalks, 387 hazard markers, 598 materials for hazard markers, 771 headlight glare screen, 516 herbicide post-emergent, 574 pre-emergent, 572 I Immigration Law, Alabama, 19 impact attenuator permanent, 621 portable, 621 truck mounted, 623 improved roadbed, 117 index asphalt index, 87 construction fuel, 583 inertial profiler asphalt pavement, 221 concrete pavement, 263 inlets for drainage structures, 501 inspection by the engineer, 36 J joint filler materials, 696 L laboratories asphalt plant, 45 base, soil and structure, 44 concrete plant, 44 field, 468 landslide corrections, 136 laws ordinances and regulations bidders knowledge of, 18 compliance with, 53 lighting nightime operations, 23 rehabilitation of roadway lighting, 657 roadway, 650 roadway lighting materials, 774 structures for, 616 lime sinks, 141 stabilized roadbed, 146 lines and grades, 35 liquidated damages, 82 load restrictions for hauling, 37 lumber, 360 M machine graded shoulders, 125 mailbox, 23, 116 maintenance of the work, 37 markers land survey, 469 right-of-way, 469 masonry brick and concrete block, 491 mortar, 489 rubble, 490 stone, 683 materials department furnished, 46 found on right-of-way, 46 guarantee, 18 pits and waste areas, 42 requirement for new, 39 special acceptance requirements, 42 unacceptable, 45 median concrete median barrier, 510 concrete median strip, 509 micropiles, 423 microsurfacing, 191 mineral admixtures, 680 mineral filler, 679 mobilization, 466 MSDSAR, 42 N nightime operations, 23 notice to contractors, 11 O object markers, 599 P paint, 733 partial payments, 91 patents, 54 pavement markers, 597 payments final, 93 to subcontractors, 92 permeable asphalt treated base, 180 pest control, 569 piling cut off lengths, 327 pile points, 327 piling materials, concrete and steel, 700 piling encasement, 313 pipe relaid, 418 roadway pipe culverts, 404 roadway pipe rehabilitation, 418 side drain, 416 planing (milling) pavement, 201 police officer, 649 polymer additives for asphalt materials, 682 precast concrete products, 695 price adjustments bituminous materials, 87 Q quantities, 11 altered, 90 approximate quantities in contract, 13, 86 asphalt, 86 basis of payment, 86 INDEX

final, 93 measurement, 84 R reinforcement. See steel reinforcement removal and relocation of structures, 109 removal of miscellaneous facilities, 111 repair of bridges, 388 repair of defective work, 87 retaining wall, 401 soil nail, 430 soldier pile, 453 riprap construction requirements, 486 materials, 684 roadbed lime stabilized, 146 processing, 142 stabilized, 145 rock slopes, 133 S safety barrier, portable concrete, 621 safety markings, 598 sand and gravel for miscellaneous use, 694 sanitary sewer, 530 scoring pavement surface, 245 scrub seal, 247 application, 249 surface preparation, 248 seeds. See Vegetation Establishment sequence of construction, 23 sewer sanitary, 530 storm, 411 sheet piling, 327 shotcrete, 448 sidewalks and driveways, 497 signs portable changeable message, 648 relocation and renovation, 611 sequential arrow and chevron, 646 sheeting type and class type, 605 sign materials, 762 structure renovation and relocation, 614 structures, 613 site conditions, 13 site conditions, differing, 22 slope protection aggregate slope protection, 484 concrete slope protection, 492 slurry seal coat, 189 soil or aggregate surface, 246 special provisions, specifications and plans coordination, 33 Specialty Items Items Specialty, 67 steel bridge coating, 389 steel reinforcement fabrication and installation, 306 reinforcement materials, 700 steel required to be USA product, 39 structural steel, 349, 701 bolting, 712 structures for traffic signals, 616 Suspension of Work, 79 T tack coat, 197 taxes, 54 thin polymer overlay, 280 timber, 360 topsoil, 543 removal, 119 traffic control devices for construction work zones, 641 maintenance, 23 markings and legends, 594 traffic signals, 624, 782, 783 portable, 663 traffic stripe, 584 materials for traffic stripe, 736 U unbalanced bidding, 16 underdrain pavement underdrain, 475 pipe underdrain, 478 underground storage tanks, 154 underwater embankment, 118 utilities cooperation with, 34 minor utility adjustments, 522 utility encasement pipe, 752 V value engineering, 25 vegetation establishment, 544 acceptance, 547 mulching, 550, 744 seeding in stubble, 547 seeds, 740 sequence, 545 soil preparation, 545 solid sodding, 549 tree wells, 558 vines, shrubs and tree planting, 553 vines, shrubs and trees, 746 vehicle permit, oversize, overweight, 37 W water for general use, 680 water line, 523 water pipe and appurtenances, 753 water wells, 108 waterproofing and dampproofing, 383

Get an email when 891 changes

Alabama revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Alabama Standard Specifications for Highway Construction, 2022 Edition. Pages 855–0 of 934. View official source ↗

Ask about this section

Scoped to Alabama 2022 Standard Specifications for Highway Construction, Section 891 — STRUCTURAL MATERIALS FOR TRAFFIC CONTROL DEVICES AND HIGHWAY LIGHTING. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.