304.01 Description
This work is producing and placing one or more courses of a mixture of water, hydraulic cement, and aggregate or soil on a prepared surface in conformity with the lines, grades, and thicknesses established in the contract.
304.02 Materials
304.02.1 Cement
Furnish Type I or II Portland cement listed on the QPL, in accordance with Subsection
551.02.1 Blended hydraulic cement that conforms to one of the following may be substituted:
AASHTO M 240 Type IL, Type IP, or Type IP (MS) ASTM C1157 Type GU or Type MS Fly ash may be used to replace a maximum of 25% of the cement by weight. Furnish fly ash in accordance with AASHTO M 295, Class C requirements. Mixtures with fly ash must meet all of the requirements of cement treated base (CTB).
304.02.2 Water
Furnish water in accordance with Subsection 713.01 requirements.
304.02.3 Aggregate
Obtain aggregates from sources in accordance with Section 106 requirements to produce aggregates in accordance with Subsection 701.02.9 requirements. Stockpile aggregates in accordance with Subsection 303.03.
304.02.4 Blending Material
Blending material, consisting of selected natural or crushed mineral aggregate may be combined with the produced aggregate to meet gradation requirements. For fine aggregate passing the No. 40 (0.425 mm) sieve; the liquid limit may not exceed 30, and the plasticity index may not exceed 7, tested in accordance with AASHTO T 89 and AASHTO T 90.
304.02.5 Composition and Proportioning
Develop and submit a proposed CTB or Cement Treated Pulverized Base mix design for approval. Develop a mix design with cementitious materials content that: • Ensures a 7-day unconfined compressive strength of 500 – 1,500 psi (3,450 – 10,350 kPa) in accordance with MT 216 , and • Is a minimum of 4.5% the weight of the dry aggregate. Include the following items as part of the mix design submittal:
304.03 Construction Requirements
304.03.1 Aggregate Production, Testing, and Acceptance
304.03.2 Weather Limitations
Do not mix or place CTB when the ambient temperature is below 40 °F (4 °C) or the ground temperature is below 35 °F (2 °C). Do not mix or place cement treated base when the weather forecast for the project site includes a predicted temperature of 25 °F or below for the following night. Do not incorporate frozen aggregate in the CTB or place on a frozen subgrade.
304.03.3 Subgrade Preparation
Prepare the subgrade in accordance with Section 203 . Trim the subgrade to the thickness tolerances in accordance with Subsection 304.03.4.
304.03.4 Mixing and Placing
Mix the CTB in a central plant. Proportion the aggregate and cement by weight. Water may be proportioned by weight or by volume. 2020 EDITION V5.1 CEMENT TREATED BASE – 304 304-3 Use weigh systems and meters accurate to within ± 0.5% of the total quantity batched and are equipped to indicate the total quantity of each ingredient batched between one-half and 10 hours. Calibrate the feed system before production mixing begins. Periodically verify the mix ingredient proportions from the weigh indicators. Produce CTB having a minimum of 4.5% cementious materials. Maintain cementious content to within ± 0.5% of the job mix target at any periodic check and within ± 0.3% for each day’s production. Mixing will be suspended until corrections are made if the cement content is not maintained within the above tolerances. Do not lower cement content during production that will result in freeze/thaw losses exceeding 14% based on mix design testing. Uniformly mix aggregate, cement, and water. Modify mix procedures when evidence of a non-uniform mix is identified. Place CTB in 4 to 8-inch (100 to 200 mm) compacted lifts. Place all lifts required to achieve full depth within 48 hours. Replace any partial depth section damaged prior to placement of successive lifts as directed by the Project Manager at Contractor expense. Keep the compacted material of previous lifts moist until placement of successive layers. Keeping lower layers moist or furnishing and applying curing seal to partial depth layers is incidental to the CTB.
304.03.5 Compaction
Compact the CTB to 98% of the maximum dry density within 2 hours of mixing. The moisture and density relationship are determined in accordance with AASHTO T 134 using samples taken from the aggregate stockpiles before starting mixing operations. If a moisture and density test varies from the running average (as determined in accordance with MT 216) during production, a new moisture-d ensity relationship will be determined. Moisture and density tests will be taken in accordance with MT 212 on the roadway approximately every 750 cubic yards (575 m3). Five tests will represent one lot of production. Remove and re-process any un-compacted sections where the weather or contractor operation has increased the average moisture content above optimum by more than 1%. Removed mix may be re-processed as aggregate for producing CTB. If the density of any section is less than or equal to 95% of the maximum dry density, 2 additional tests will be taken in that section and the average of all 3 test results will represent the section. The average density for the 3 tests must be at least the specified density, with none of the 3 tests less than 93% of the maximum dry density. Remove any section with an average density less than or equal to 95% of the maximum dry density. Removed mix may be re- processed as aggregate for producing cement treated base. CTB with densities between 95% and 98% is evaluated on a lot-by-lot basis in accordance with Subsection 105.03.2 .
304.03.6 Finishing
Shape the compacted surface to the specified lines, grades, and cross sections. Finish and compact to produce a smooth, dense surface free of compaction planes, cracks, irregularities, or loose material. Complete the surface finishing within 2 hours of compaction. Scarify and re-compact surface deformations in the base caused by equipment. Do not permit the moisture content to fall below the specified optimum during finishing. Apply water in a uniform fog spray. 304 – CEMENT TREATED BASE 2020 EDITION V5.1 304-4
304.03.7 Construction Joints
Construct straight vertical-faced transverse joints at the end of each day’s work and when CTB operations are delayed or stopped for more than 2 hours. Do not place additional material until the transverse joint has been approved by the Project Manager. Construct straight vertical faced longitudinal joints in compacted material that has been in place for more than one hour by cutting vertically approximately 3 inches (75 mm) from the existing edge. Dispose of the cut material in accordance with Subsection 304.03.12 . Moisten joints prior to placing adjacent CTB material. Repair all construction related damage to finished sections of the CTB at Contractor expense.
304.03.8 Protection and Curing
When the CTB is finished to grade, apply the specified bituminous curing seal at 0.15 to 0.25 gallons per square yard (0.68 to 1.13 L/m2). Keep the CTB surface moist between the final compaction and application of the curing seal. Apply the curing seal within 48 hours of finishing the cement treated base to grade. Before applying the curing seal, ensure the base surface is tightly knit, free of all loose material, and has sufficient moisture to prevent asphalt penetration. Apply the specified blotter material at approximately 15 pounds per square yard (8.2 kg/m2) when directed. The actual application rate of curing seal and blotter may be adjusted by the Project Manager. Remove CTB areas that have absorbed the curing seal, down to a hard, clean surface, within 24 hours of the curing seal application. Re-moisten and patch the area with approved cement treated material. Re-apply the curing seal as directed by the Project Manager. Apply the curing seal and blotter material in accordance with Section 409.
304.03.9 Curing Period
Do not perform any work on the CTB for 3 calendar days after the curing seal is applied. Do not place pavement on the CTB until the compressive strength reaches 400 psi (2760 kPa).
304.03.10 Maintenance
Maintain the finished surface and seal before placing the wearing course. Make all repairs or patches to the full depth of the base. Repair damage to the curing seal or cement treated base as directed by the Project Manager at the Contractor’s expense. Remove any loose material from the CTB surface prior to paving operations.
304.03.11 Surface Smoothness and Thickness Requirements
Finish CTB in accordance with Subsection 105.08 .
304.03.12 Use of Trimmed Material
CTB trimmings may be used for shoulder construction in lieu of aggregate, subject to the following:
304.03.13 Cement Treated Pulverized Base
When required by the Contract, process the existing plant mix surfacing with the existing base course and/or add crushed aggregate course and cementitious material as needed to restore the roadway section to the grade and dimensions shown in the Contract.
304.03.14 Testing and Acceptance of CTB
Samples for determining the compressive strength will be taken in accordance with MT 201 . Test method MT 216 will be used to mold cylinders for strength testing. The approximate quantity represented by each sample is 750 cubic yards (575 m3). Additional samples may be taken and tested. The compressive strength tests will be conducted at 7 days and the material represented will be accepted or rejected in accordance with Table 304-1. Any corrective action is at Contractor expense. The Contractor may make additional cylinders to determine strength gain and to maintain quality control. 304 – CEMENT TREATED BASE 2020 EDITION V5.1 304-6 TABLE 304-1 PAY FACTORS FOR CTB Lot Acceptance Strength, x psi (1 psi = 6.9 kPa) Strength, x (psi) Strength Pay factor, PF x > 2000 PF = 0.90 2000 ≥ x ≥ 500 PF = 1.0 500 > x ≥ 400 PF = 1.0 - 0.50 (500 - x) / 100 x < 400 PF = 0, remove and replace
304.04 Method of Measurement
304.04.1 Cement Treated Base
CTB is measured by the cubic yard (m3) of in-place volume. CTB placed outside the lines and grades shown in the contract or established by the Project Manager is not measured for payment. No measurement is made of the width required for forms or equipment operations. Gravel used in trimmings and lateral support sections outside the planned typical section dimensions is not measured for payment. Blending material is not measured for payment.
304.04.2 Curing Seal
Curing seal is measured by the gallon (L) or by the ton (MT) in accordance with Subsection
409.04 1.
304.04.3 Blotter Material
Blotter material is measured by the square yard (m2) based on the length and width of CTB placed and accepted.
304.04.4 Cement Treated Pulverized Base
Cement Treated Pulverized Base is measured by the square yard (m2) based on the designated width shown in the plans. Crushed Aggregate Course is measured by the cubic yard (m3) as a predetermined pay quantity as described elsewhere in this contract. Portland cement is measured by the ton (MT) in accordance with Subsection 109.01. Fly ash, if included, is measured by the ton (MT) and the quantity added to the measured quantity of Portland cement.
304.05 Basis of Payment
304.05.1 Cement Treated Base
Payment for the completed and accepted quantities is made under the following: Pay Item Pay Unit Blotter Material Square Yard (m2) Cement Treated Base Cubic Yard (m3) Curing Seal Gallon (L) or Ton (MT) No separate payment will be made for cement, fly ash, blending material or surface preparation. Include the cost in the unit price bid for CTB. 2020 EDITION V5.1 CEMENT TREATED BASE – 304 304-7
304.05.2 Cement Treated Pulverized Base
Payment for the completed and accepted quantities is made under the following: Pay Item Pay Unit Blotter Material Square Yard (m2) Cement Treated Pulverized Base Square Yard (m3) Cement Ton (metric ton) Crushed Aggregate Course Cubic Yard (cubic meter) Curing Seal Gallon (L) or Ton (MT) No separate payment will be made for blending material or surface preparation. Include the cost in the unit price bid for CTPB.
Cement Treated Base in other states
Get an email when 304 changes
Montana revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.