SECTION 905: QUALITY ASSURANCE FOR MINOR PAVING 905.1 DESCRIPTION The Department will sample and test Materials for Acceptance u nless otherwise specified in the Contract. The Department will provide these test result s to the Contractor within two
91.50 92.49 95 90.50 – 91.49 90
90.0 – 90.49 80 < 90.00 Reject Table 905.1.3.2:2 Price Adjustment for Air Voids Percent deviation from TV Pay factor (%) < 1.3 100 1.31 – 1.69 90 1.7 – 1.99 75 ≥ 2.0 Reject Table 905.1.3.2:3 Price Adjustment for Asphalt Content Percent deviation from TV Pay factor (%) < 0.29 100 0.36 – 0.55 90 ≥0.56 Reject Table 905.1.3.2:4 Price Adjustment for Thickness Deficiency from plan minimum thickness Pay factor (%) None (Plan Minimum or Thicker) 100 <1/4 inch 100 1/4 inch–1/2 inch 90 1/2 inch–3/4 inch 75 3/4 inch–one (1) inch 50 >one (1) inch Corrective action The Contractor shall remove and replace rejected Material iden tified in Table 905.1.3.2:1, “Price Adjustment for Density,” Table 905.1.3.2:2, “Price Adjus tment for Air Voids,” and Table 905.1.3.2:3, “Price Adjustments for Asphalt Content.” In stead of removing and replacing rejected Material, the Project Manager may allow the Material t o remain in place at 50% of the Bid Item Unit Price, if in the best interest of the Department. The Contractor shall take corrective action if specified in Ta ble 905.1.3.2:4, “Price Adjustment for Thickness.” Co rrective action includes removal and replacement of the unacceptable Material, overlay of the unacceptable Material, or other corrective actions approved by the Project Manager. Thin or feathered edge surfac e patching is not Acceptable. Overlay lift thicknesses must meet the requirement of Table 905 .1.3.2:5, “HMA/WMA Lift Thickness.” Table 905.1.3.2:5 HMA/WMA Lift Thickness HMA Type Lift Thickness (Inches) Minimum Maximum SP-III 2.5 3.5 SP-IV 1.5 3.0 SP-V 0.75 1.5 The Project Manager may reject Materials that appears to be de fective based on visual inspection. Section 906: Minimum Testing Re quirement’s (MTR’s) Page 944 SECTION 906: MINIMUM TESTING REQUIREMENT’S (MTR’S) 906.1 DESCRIPTION 906.1.1 General This Work consists of Minimum Te sting Requirement’s (MTR’s) fo r the Department and Contractor which includes constr uction sampling, tests, and tes ting frequencies of Materials incorporated into the Work for Acceptance and Quality Control. Project Quantities less than the minimum Agency Testing requirement do not require IA Testin g if Agency Testing is certified by the Assistant District Engineer – Construction. 906.1.2 Minimum Testing Requirements Table 906.1.2:1 Earthwork Item Test Required Sampling/ Testing Location Agency Testing Contract or Testing Independent Assurance (a) State Material s Bureau Project Approach System Approac h Embankme nt, Unclassifie d Excavation (Section 203) In-Place Density and Moisture Roadway 1 per 2,000 cy N/A 1 per 20,000 cy 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification Stockpile / Roadway 1 per material type per 15,000 cy 1 per 100,000 cy Borrow (Section 203.2.1.3) AASHTO T-190 R-Value, Soils Classification Borrow Pit N/A 1 per 10,000 cy 1 per material type N/A 1 every 3 months with each sampling/ testing technician R-Value as needed. Testing perform ed by State Material s Bureau Road Bed Embankme nt (Section 203.3.5.1) In-Place Density and Moisture Roadway 1 per 2,500 sq. yd. N/A 1 per 25,000 sq. yd. 1 every 3 months with each sampling/ testing technician N/A Moisture/ Density Tests (Proctor), Soils Classification 1 per material type 1 per project Foundation s / Backfill for Culverts and Minor Structures In-Place Density and Moisture Structure See Table 906.1.2:2 N/A 1 per project 1 every 3 months with each sampling/ testing N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 945 Table 906.1.2:1 Earthwork Item Test Required Sampling/ Testing Location Agency Testing Contract or Testing Independent Assurance (a) State Material s Bureau Project Approach System Approac h (Section 206) Moisture/ Density Tests (Proctor), Soils Classification Stockpile 1 per material type technicia n Electrochemi cal, where specified. N/A 1/material type N/A N/A Upon Request Subgrade Preparation (Section 207) In-Place Density and Moisture Roadway 1 per 2,000 sq. yd. N/A 1 per 20,000 sq. yd. 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification 1 per material type 1 per project Blading and Re-shaping (Section 209) In-Place Density and Moisture Roadway One per half mile N/A 1 per 5 miles 1 every 3 months with each sampling/ testing technician N/A Moisture/ Density Tests (Proctor), Soils Classification 1 per material type 1 per project Backfill for Major Structures (Section 210) In-Place Density and Moisture Structure See Table 906.1.2:2 N/A 1 per 5,000 cy 1 every 3 months with each sampling/ testing technicia n N/A Gradation, PI Stockpile 1 per 300 cy 1 per project Moisture/ Density Tests (Proctor), Soils Classification 1 per material type Treated Sub grade (Section 306) In-Place Density and Moisture Roadway 1 per 3,000 sq yd N/A 1 per 30,000 sq yd 1 every 3 months with each sampling/ testing technician N/A Moisture/ Density Section 906: Minimum Testing Re quirement’s (MTR’s) Page 946 Table 906.1.2:1 Earthwork Item Test Required Sampling/ Testing Location Agency Testing Contract or Testing Independent Assurance (a) State Material s Bureau Project Approach System Approac h Tests (Proctor), Soils Classification 1 per material type 1 per project AASHTO T-290 Sulfate Testing Borrow Pit N/A 1 per 10,000 cy N/A Upon Request Backfill for Mechanical Stabilized Earth (MSE) Retaining Structures (Section 506) In-Place Density and Moisture Structure See Table 906.1.2:2 N/A 1 per 3,000 cy 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor) Stockpile 1 per material type 1 per material type 1 per project Gradation, LL, PI 1 per 300 cy 1 per 3,000 cy Direct Shear, Electro Chemical N/A N/A Upon Request Foundation s for Slope and Erosion Protection Structures (Section 602) In-Place Density and Moisture Structure 1 per structure N/A 1 per project 1 every 3 months with each sampling/ testing technicia n N/A Moisture / Density Tests (Proctor), Soils Classification Foundation material location 1 per material type Backfill for Soil and Drainage Geotextiles (Section 604) In-Place Density and Moisture Roadway 1 per lift N/A 1 per project 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification Stockpile 1 per material type Backfill for Drains (section 605.3.4) In-Place Density and Moisture Roadway 1 per 1,000 lf N/A 1 per 10,000 lf 1 every 3 months with each sampling/ testing N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 947 Table 906.1.2:1 Earthwork Item Test Required Sampling/ Testing Location Agency Testing Contract or Testing Independent Assurance (a) State Material s Bureau Project Approach System Approac h Moisture/ Density Tests (Proctor), Soils Classification Stockpile 1 per material type N/A 1 per project technicia n Foundation s for Sidewalks, Drive Pads and Concrete Median Paving (Section 608) In-Place Density and Moisture Roadway 1 per 150 sq. yd. N/A 1 per 1,500 lf 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification Foundation material location 1 per material type 1 per project Bed Course Material for Sidewalks, Drive Pads and Concrete Median Paving (Section 608) In-Place Density and Moisture Roadway 1 per 150 sq. yd. N/A 1 per 1,500 lf 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification Stockpile 1 per material type 1 per project Foundation s for Curb and Gutter (Section 609) In-Place Density and Moisture Roadway 1 per 500 lf or as site locations require N/A 1 per 5,000 lf 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification Foundation material location 1 per material type 1 per project Bed Course Material for Curb and Gutter (Section 609) In-Place Density and Moisture Roadway 1 per 500 lf or as site locations require N/A 1 per 5,000 lf 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification Stockpile 1 per material type 1 per project Foundation s / Backfill for Cattle Guards (Section In-Place Density and Moisture Structure See Table 906.1.2:2 N/A 1 per project 1 every 3 months with each sampling/ testing N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 948 Table 906.1.2:1 Earthwork Item Test Required Sampling/ Testing Location Agency Testing Contract or Testing Independent Assurance (a) State Material s Bureau Project Approach System Approac h 610) Moisture/ Density Tests (Proctor), Soils Classification Stockpile 1 per material type technicia n Bedding Material for Cattle Guards (Section 610) In-Place Density and Moisture Structure 1 per structure N/A 1 per project 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification Stockpile 1 per material type Foundation s / Backfill for Drop Inlets and Junction Boxes (Section 623) In-Place Density and Moisture Structure See Table 906.1.2:2 N/A 1 per project 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification Foundation material location 1 per material type Foundation s / Backfill for Utilities (Section 660) In-Place Density and Moisture Structure See Table 906.1.2:2 N/A 1 per project 1 every 3 months with each sampling/ testing technicia n N/A Moisture/ Density Tests (Proctor), Soils Classification Foundation material location 1 per material type Table 906.1.2:2 Structure Definitions, Foundation and Backfill Requirements for Acceptance
1.Transverse or skewed Culvert or concrete box Culvert (CBC), not connected to an underground drainage network, including end sections, wing wall s if backfilled simultaneously, structural plate pipe, storm drains, and sewer lines (Note 1): Foundation: One density per 100 linear feet. For pipe in a ba ttery, up to 4 pipes may be considered as a unit for pu rposes of foundation density. Backfill Density: One (1) per two (2) foot of fill per side* a nd to top of trench per 100 linear feet (Note 2). *For a battery of pipes, the number of backfill densities requi red will be as follows: One-Half (1/2) of the required densities for up to four (4) pip es. Section 906: Minimum Testing Re quirement’s (MTR’s) Page 949 Table 906.1.2:2 Structure Definitions, Foundation and Backfill Requirements for Acceptance One-Third (1/3) of the required densities for more than four (4 ) pipes.
2.End section or CBC wing wall if backfilled separately from c ulvert pipe or CBC (Note 2): Backfill Density: One (1) per two (2) foot of fill per side.
3.Drop inlet (D.I.), junction box, cattle guard, light and sig nal base, manhole, etc.: Foundation: One (1) per structure. Backfill Density: One (1) per two (2) foot of fill.
4.Underground drainage network including interruptions such as D.I., manhole, junction box, plug, service connection, s lotted drain, etc., if backfill ed simultaneously: Foundation: One (1) per 100 linear feet. Backfill Density: One (1) per two (2) foot of fill per side an d to top of trench per 100 linear feet (Note 2).
5.Retaining wall / MSE wall: Foundation: One (1) foundations density per 100 linear feet. Backfill Density: One (1) per two (2) foot of fill per 100 lin ear feet.
6.Bridge abutment back wall, wing wall or approach slab: Backfill Density: One (1) per six (6) inches of fill.
7.Pier footing: Foundation: One (1) per footing. Backfill Density: One (1) per six (6) inches of fill.
8.Waterlines, electrical condui t, telephone cable or gas line, etc., within Roadway Prism (traveled area and Shoulder) i f trench width is sufficient for density testing: Foundation: One (1) per 100 linear feet. Backfill Density: One (1) per two (2) foot of fill per 100 lin ear feet.
9.Waterline, electrical condui t, telephone cable or gas line, etc. outside the Roadway Prism (traveled area and Shoulder s) if trench width is sufficie nt for density testing: Foundation: One (1) per 300 linear feet. Backfill Density: One (1) per two (2) foot of fill per 300 lin ear foot. Notes:
1.All extensions will be consi dered increments and as such str ucture units.
2.Determination of Backfill Dept hs Governing Minimum Testing C riteria Requirements:
a.When backfill construction is performed in trench conditions , the depth of compacted backfill to be tested shall be measured from the foun dation to the top of the trench.
b.When backfill construction is performed in non-trench condit ions, the depth of compacted backfill to be tested shall be determined through the u s e o f t h e appropriate NMDOT Standard Drawings. Table 906.1.2:3 Base Course Item Test Required Sampling/ Testing Agency Testing Contractor Testing Independent Assurance (a) State Materials Section 906: Minimum Testing Re quirement’s (MTR’s) Page 950 Location Project Approach System Approach Bureau Base Course (Section 303) In-Place Density and Moisture Roadway after compaction 1 per 1,000 tons N/A 1 per 20,000 tons with Agency 1 every 3 months with each sampling/ testing technician N/A Moisture/ Density Tests (Proctor) Stockpile 1 per material type 1 per project Gradations Processed material 1 per 2,000 tons 1 per 20,000 tons with Agency FF, LL, PI 1 per 4,000 tons Thickness Roadway after compaction 1 per 1,000 tons N/A *For Projects whose total is less than 1000 tons, IA testing is not required. Table 906.1.2:4 Aggregates ITEM Test Required Sampli ng/ Testin g Locati on Agency Testing Contra ctor Testing Independent Assurance (a) State Materi als Burea u Project Approac h System Approa ch Processing, Placing and Compacting Existing Pavement (Section 302) In-Place Density Roadw ay 1 per 1,000 sq yd N/A 1 per 50,000 sq yd 1 every months with each samplin g/ testing technici an N/A Gradation (Dry field sieve verification per TTCP) 1 per 5,000 sq yd Rip Rap Material (Section 602) LA Wear & Soundness (AASHTO T-96 AASHTO T-104) Source N/A 1/year per pit N/A N/A N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 951 Table 906.1.2:5 Minor Paving - Hot Mix Asphalt (HMA)/Warm Mix Asphalt (WMA) ITEM Test Required Sampling/ Testing Location Agency Testing Contracto r Testing Independent Assurance (a) State Material s Bureau Project Approach System Approac h HMA/WMA Minor Paving (Section 416) Asphalt Content (Strap Method or Meter) Asphalt Plant N/A 1 per day N/A 1 every 3 months with each sampling/ testing technicia n N/A Air Voids Roadway 3 per lot N/A 1 per project Roadway Compactio n Nuclear Densomete r 10 per lot Contractor to provide three (3) cores for Correlatio n of Densomet er 1 per lot Thickness 3 per lot Obtain Cores N/A Open Graded Friction Course (Section 403) Gradation, FF Cold Feed 1 per 3,000 tons with a minimum of 1 per day 1 per 250 tons 1st 2,000 tons then 1 per 500 tons after 2,000 tons 1 per 15,000 tons with Agency 1 every 3 months with each sampling/ testing technicia n N/A Crushing N/A 1 per 1,000 tons N/A Performanc e Graded Asphalt Binder From storage tank or Delivery Truck 1 sample consisting of three separate 1-quart increments per Project Samples will be obtained by contractor personnel and observed by Departme nt personnel N/A N/A Material will be accepte d in accorda nce with contract docume nts. A min. of one sample per project will be tested. Section 906: Minimum Testing Re quirement’s (MTR’s) Page 952 Table 906.1.2:6 Asphalt Recycling ITEM Test Required Sampling/ Testing Location Agency Testing Contracto r Testing Independent Assurance (a) State Materials Bureau Project Approac h System Approa ch Hot In- Place Recycling (Remixing Method) (Section 412) Roadway Density (Nuclear Densomete
r.Roadway 1 per 3,000 sq yd N/A 1 per 30,000 sq yd 1 every months with each samplin g/ testing technicia n N/A Single- Machine Hot In- Place Surface Repaving (Section 413) Roadway Density (Nuclear Densomete
r.Roadway 1 per 3,000 sq yd N/A 1 per 30,000 sq yd 1 every months with each samplin g/ testing technicia n N/A HMA/WMA Windrow / Hopper See Section 416 Minor Paving N/A Pavement Surface Restoration (In-Situ) (Section 415) Roadway Density Roadway 1 per 3,000 sq yd N/A 1 per 30,000 sq yd 1 every months with each samplin g/ testing technicia n N/A Bulk Specific Gravity 2 sets/day Performanc e Graded Asphalt Binder (Section 402) As required in the Contract Documents From storage tank or delivery truck Minimum 2 samples consisting of three separate 1 quart increments per Project. One from the Test Strip and one randomly selected from the project Samples will be obtained by contractor personnel and observed by Departme nt personnel. One sample will be obtained from the Test Strip, and one sample will be obtained for each 5000 tons asphalt mix Random samples will be selected by District Laborator y Personnel and submitted to the SMB. 1 every months with each samplin g/ testing technicia n Material will be accepted in accordan ce with the Contract Requirem ents. A minimum of two samples per project will be tested. Section 906: Minimum Testing Re quirement’s (MTR’s) Page 953 Table 906.1.2:7 Asphalt Mineral Admixture Materials ITEM Test Required Sampling/ Testing Location Agency Testing Contracto r Testing Independent Assurance (a) State Material s Bureau Project Approach System Approa ch Asphalt Emulsion (Section 402) Manufactur es certificate of compliance will suffice for testing credits N/A N/A N/A N/A N/A Material shall be provided by approved suppliers, in accordan ce with SMB procedur es for Certificati on of Asphalt Suppliers . Mineral Admixtures (Section 402) Manufactur es certificate of compliance will suffice for testing credits N/A N/A N/A N/A N/A N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 954 Table 906.1.2:8 Major Paving (Sections 423/424/900’s) - Hot Mix Asphalt (HMA), Warm Mix Asphalt (WMA) ITEM Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance State Materials Bureau Project Approach System Approa ch HMA/WMA Superpave (Section 423/424) Asphalt Content, Gradation, Gmm, Gmb, Air Voids, VMA, VFA, DP Roadway 1 per 3000 tons. Gmm will be determined at least once per day. 1 per 1000 tons. Gmm will be determined at least twice per day. 1 per 15,000 tons 1 every months with each samplin g/ testing technicia n Referee Testing Roadway Compactio n (Cores) Roadway Compactio n (nuclear/no n- destructive) N/A As needed N/A FF, SE, F&E, FAA, Moisture Cold Feed before addition of Mineral Admixtures Section 906: Minimum Testing Re quirement’s (MTR’s) Page 955 Table 906.1.2:8 Major Paving (Sections 423/424/900’s) - Hot Mix Asphalt (HMA), Warm Mix Asphalt (WMA) ITEM Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance State Materials Bureau Project Approach System Approa ch Performanc e Graded Asphalt Binder (Section 402) As required in the Contract Documents From storage tank or delivery truck Minimum 2 samples consisting of three separate 1 quart increments per sample per Project. One from the Test Strip and one randomly selected from the project Samples will be obtained by contractor personnel and observed by Department personnel. One sample will be obtained from the Test Strip, and one sample will be obtained for each 5000 tons asphalt mix Random samples will be selected by District Laborator y Personnel and submitted to the SMB. Random samples will be selected by District Laborato ry Personn el and submitte d to the SMB Material will be accepted in accordan ce with contract requirem ents A minimum of two samples per project will be tested. Asphalt Emulsion (Section 402) Manufactur es certificate of compliance will suffice for testing credits N/A N/A N/A N/A Random samples will be selected by District Laborato ry Personn el and submitte d to the SMB N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 956 Table 906.1.2:8 Major Paving (Sections 423/424/900’s) - Hot Mix Asphalt (HMA), Warm Mix Asphalt (WMA) ITEM Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance State Materials Bureau Project Approach System Approa ch Mineral Admixtures (Section 402) Manufactur es certificate of compliance will suffice for testing credits N/A N/A N/A N/A Random samples will be selected by District Laborato ry Personn el and submitte d to the SMB N/A Table 906.1.2:9 Non-QLA Portland Cement Concrete Minor Structures, Curb & Gutter, Side Walks, etc. (509, 510, 51 1, 521) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance (a) State Materials Bureau Project Approach System Approach Fine Aggregates Gradation Stockpile 1 per 2 weeks during concrete production 1 per week during concrete production 1 per 10,000 cy, not required if less than 2,000 cy. 1 every 3 months with each sampling/ testing technician N/A Course Aggregates FF, F&E N/A Minimum 1 per project per coarse aggregate type N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 957 Table 906.1.2:9 Non-QLA Portland Cement Concrete Minor Structures, Curb & Gutter, Side Walks, etc. (509, 510, 51 1, 521) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance (a) State Materials Bureau Project Approach System Approach Non-Shrink Grout Aggregate Manufacture certificate of compliance will suffice for testing credits N/A N/A NA N/A N/A N/A Project Acceptance Test Compressive Strength Cylinders, and Plastic Properties See Table 906.1.2:14 Each mix design per day of placement. Test the first three loads, with one randomly sampled for one set of cylinders. Sample for testing and cylinders, one random load from each subsequent 6 load sublot N/A 1 per project 1 every 3 months with each sampling/ testing technician N/A Table 906.1.2:10 Non-QLA Portland Cement Concrete Major Structures, Substructures, Drilled Shafts (502, 509, 510, 511, 521) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance (a) State Materials Bureau Project Approach System Approa ch Section 906: Minimum Testing Re quirement’s (MTR’s) Page 958 Table 906.1.2:10 Non-QLA Portland Cement Concrete Major Structures, Substructures, Drilled Shafts (502, 509, 510, 511, 521) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance (a) State Materials Bureau Project Approach System Approa ch Fine Aggregates Gradation Stockpile 1 per 2 weeks during concrete production 1 per week during concrete production 1 per 5,000 cy, not required if less than 500 cy. 1 every months with each samplin g/ testing technici an N/A Course Aggregates FF, F&E N/A N/A Non-Shrink Grout Aggregate Manufactur e certificate of compliance will suffice for testing credits N/A N/A NA N/A N/A N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 959 Table 906.1.2:10 Non-QLA Portland Cement Concrete Major Structures, Substructures, Drilled Shafts (502, 509, 510, 511, 521) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance (a) State Materials Bureau Project Approach System Approa ch Project Acceptance Test Compressi ve Strength Cylinders, and Plastic Properties See Table 906.1.2:14 Each mix design per day of placement. Test the first three loads, with one randomly sampled for one set of cylinders. Sample for testing and cylinders, one random load from each subsequent 6 load sublot Each mix design per day of placement. Test the first three loads and one load from each 6 load sublot for plastic properties 1 per project 1 every months with each samplin g/ testing technici an N/A Table 906.1.2:11 Non-QLA Portland Cement Concrete Pavement (Section 509 and 451) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance (a) State Materials Bureau Project Approach System Approach Fine Aggregates Gradation Stockpile 1 per 2 weeks during concrete production 1 per week during concrete production 1 per 5,000 cy, not required if less than 500 cy 1 every 3 months with each sampling/ testing technician N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 960 Table 906.1.2:11 Non-QLA Portland Cement Concrete Pavement (Section 509 and 451) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance (a) State Materials Bureau Project Approach System Approach Coarse Aggregates
F.F, F&E N/A Minimum 1 per project per coarse aggregate type N/A Project Acceptance Test Compressive Strength Cylinders, and Plastic Properties See Table 906.1.2:14 Per day of placement. Test the first three loads, with one randomly sampled for one set of cylinders. Sample one random load from each subsequent 6 load sublot Per day of placement. Test the first three loads and one load from each subsequent 6 load sublot for plastic properties 1 per 10,000 sy 1 every 3 months with each sampling/ testing technician N/A Thickness Roadway 1 per 300 cy N/A N/A Environmental Conditions Evaporation Rate Placement Site N/A Evaporation Potential determined at intervals not greater than 5 minutes until final curing system in place N/A N/A N/A Table 906.1.2:12 Non-QLA Superstructure Concrete (Section 509, 510, and 512) Section 906: Minimum Testing Re quirement’s (MTR’s) Page 961 Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance (a) State Materials Bureau Project Approach System Approach Fine Aggregates Gradation Stockpile 1 per 2 weeks during concrete production 1 per week during concrete production 1 per project. 1 every 3 months with each sampling/ testing technician N/A Coarse Aggregates
F.F., F&E N/A Minimum 1 per project per coarse aggregate type N/A Project Acceptance Test Compressive Strength Cylinders, and Plastic Properties See Table 906.1.2:14 For each mix design per day of placement. Test the first three loads, with one randomly sampled for one set of cylinders. Test and sample one random load from each subsequent 3 load sublot Each mix design per day of placement. Test the first three loads and one load from each 3 load sublot for plastic properties 1 per 300 cy 1 every 3 months with each sampling/ testing technician N/A Section 906: Minimum Testing Re quirement’s (MTR’s) Page 962 Table 906.1.2:12 Non-QLA Superstructure Concrete (Section 509, 510, and 512) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance (a) State Materials Bureau Project Approach System Approach Environmental Conditions Evaporation Rate Placement Site N/A Evaporation Potential determined at intervals not greater than 5 minutes until final curing system in place N/A 1 every 3 months with each sampling/ testing technician N/A Table 906.1.2:13 QLA Portland Cement Concrete Pavement (Section 450) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance State Materials Bureau Project Approach System Approach Fine Aggregates Gradation Stockpile 1 per week during concrete production 1 per day per day of production Minimum 2 per project 1 every 3 months with each project sampling/ testing technician Referee Testing Coarse Aggregates Gradation,
F.F., F&E Project Acceptance Test Compressive Strength Cylinders, and Plastic Properties See Table 906.1.2:14 1 per 500 cy One set of cylinders from one of the first three trucks. 1 set per 125 cy thereafter 1 per 2,500 cy 1 every 3 months with each project sampling/ testing technician Referee Testing Section 906: Minimum Testing Re quirement’s (MTR’s) Page 963 Table 906.1.2:13 QLA Portland Cement Concrete Pavement (Section 450) Item Test Required Sampling/ Testing Location Agency Testing Contractor Testing Independent Assurance State Materials Bureau Project Approach System Approach For each of the first three trucks. 1 set per 125 cy from the trucks selected for compressive strength testing thereafter. Thickness Roadway 1 per 5,000 sq. yd. 1 per 2,500 sq. yd. N/A Environmental Conditions Evaporation Rate Placement Site N/A Evaporation Potential determined at intervals not greater than 5 minutes until final curing system in place N/A N/A N/A Table 906.1.2:14 Method of Placement Sample Location Pumped Point of discharge from pump into Structure Direct Discharge from Truck At end of discharge chute of truck Crane and Bucket From discharge chute of bucket Conveyor belt From Material on Roadway after being discharged from conveyor Slip Form (Curb and Gutter/Barrier Walls) Point of discharge in to extrusion machine Slip Form Paver (PCCP) From grade in front of paving machine Drill Shafts At end of discharge chute of truck Table 906.1.2:15 Tolerances for Comparison of Independent Assurance Sample Tests to Acceptance and Process Control Tests Characteristics Tolerances Section 906: Minimum Testing Re quirement’s (MTR’s) Page 964 Moisture/Density Test (Proctor) In Place Moisture/Density (Roadway) Plasticity Index (P.I.) ± 3.0 PCF*, ± 2 Units for Moisture ± 3.0 PCF, ± 2 Units for Moisture ± 3 Units *Only if proctors are run by both District and Project. If pro ctors are not run by both District and Project ± 5.0 PCF. Gradation Tolerances 1 1/2" to ¾ 1/2" to No. 4 No. 8 through No. 200 Fractured Faces Flat & Elongated Fine Aggregate Angul a Sand Equivalent Aggregate Specific Gr a ± 6 Units ± 5 Units ± 4 Units ± 5 Units ± 5 Units ± 3 Units ± 4 Units ± 0.020 Concrete Tolerances Slump Unit Weight Compressive Strength ± 0.5 Inch ± 2.0 PCF 10% or less = Range / Average x 100% Hot Mix Asphalt (HMA)/Warm Mix Asphalt (WMA) Tolerances Roadway Density (Cores from Project, retained by Agency and Contractor Personnel) Density (Nuclear) VMA Asphalt Content (Ignition Burn Oven) Bulk Specific Gravity at Ndes Maximum Specific Gravity Air Voids ± 0.025 Units ± 4 Units ± 1.0 Units ± 0.50 ± 0.025 Units ± 0.020 Units ± 1.5 Units Section 910: Aggregate Index Page 965
Source: New Mexico Standard Specifications for Highway and Bridge Construction, 2019 Edition. Pages 0–0 of 974.