167 SECTION 404 COLD RECYCLED BITUMINOUS SURFACE AND PREMIXED BITUMINOUS PAVING MATERIAL DESCRIPTION
404.01.01 General. This work consists of preparing and placing recycled bituminous surface and furnishing,
stockpiling, loading, hauling, and placing premixed bituminous paving material. MATERIALS
404.02.01 Composition of Cold Recycled Mixtures. Compose the recycled bituminous mixture of reclaimed
asphalt pavement, a recycling agent, and lime slurry, as specified.
404.02.02 Composition of Premixed Bituminous Paving Material. Compose the premixed bituminous
paving material of aggregates, bituminous material, and mineral filler. The type and grade of bituminous material and type of aggregate will be specified in the contract. 404 COLD RECYCLED BITUMINOUS SURFACE 168 Submit samples of the aggregate and cutback asphalt for the mix design according to Subsection 401.02.02. Aggregates shall meet the requirements of Section 705, for the grading size and type specified. Bituminous material shall meet the applicable requirements of Section 703. Mineral filler shall conform to Subsection 705.03.03. Mix the aggregate, bituminous material, and mineral filler in proportions conforming to the mix design and according to the ( a) Plantmixing Method of Subsection 404.03.06. CONSTRUCTION
404.03.01 Cold Recycle Equipment. Use equipment specifically designed for production of lime slurries.
Introduce the lime slurry at the mill head, as directed, by mass of the cold milled material. Calculate the mass of the cold milled material by kg/m3 (lb/ft3) for volume of cut. Use a metering device to accurately measure the amount of lime slurry required to within plus or minus 5%. Lime slurry rate of application shall be tied to the fo rward speed of the milling machine. Use agitators or similar equipment to keep the hydrated lime slurry in suspension when held in the lime slurry feed tank. Keep the hydrated lime slurry in suspension during transport using similar agitator equipment. The recycling train shall consist of a milling machine, crusher, and a pugmill mixer. Provide a milling machine which meets the requirements of Subsection 202.03.03 with the exception that the rotating powered mandrel drum shall be operated in the up -cut direction and studded with conical tungsten carbide tipped bits that produce a textured surface consisting of parallel ridges and furrows resembling a corrugated pattern. Horizontal spacing of the parallel ridges shall not be less than 15 mm (5/8 in.) or g reater than 22 mm (7/8 in.). The depth of the furrows shall not be less than 6 mm (1/4 in.) and not more than 13 mm (1/2 in.). Perform the cold milling operation in a manner that ensures the underlying material is not damaged. The primary milling machine shall have a minimum 3.6 m (12 ft) cutter capable of removing the existing pavement to the depths shown in the plans. A smaller milling machine may be used to mill the shoulders and miscellaneous areas. Provide a primary milling machine capable of discharg ing lime slurry on the cutting heads. The use of a heating device to soften the pavement will not be permitted. Use a portable crusher capable of reducing the oversize recycled materials to the specified size. Equip a portable continuous pugmill mixing plant with a belt scale and automatic controls to obtain the proper amount of recycling agent. Provide a pugmill which meets the requirements of Subsection 401.03.01. Equip the recycling train with positive displacement pumps and a computerized metering s ystem which can accurately meter the amount of recycling agent. Provide an interlocked computerized belt weighing system that measures the quantity of recycled material entering the mixing plant. Design the interlock so that recycling agent cannot be added until the recycled material enters the mixer. Equip overrides of the interlock system with short duration timers to prevent their continuous use. Use overrides only during start -up periods. Provide facilities to verify and calibrate the aggregate weigh system, recycling agent metering device, and lime slurry metering device. Calibrate the aggregate weigh system, recycling agent metering device, and lime slurry metering device before beginning recycling operations, no less than once a year, and any other time as directed. Calibration of the aggregate weigh system shall conform to Subsection 401.03.01 (4.c) with the exception that marinated material is not required. Calibration of the recycling agent metering device shall conform to Subsection 401.03.01 (4.d). Calibrate lime slurry metering device at two different speeds (lowest and highest speed of anticipated operation) in relation to the speed of the aggregate feed using the percentage of lime slurry set forth in the contract documents or as approved. Provide platform scales with a Certificate of Inspection as required in Subsection 109.01. COLD RECYCLED BITUMINOUS SURFACE 404 169 Furnish a vessel having a sufficient capacity to perform the calibration testing. A minimum of 3,785 L (1,000 gal) shall be the required am ount for a valid test. Calibrate the lime slurry feed so the masses shown on the metering device are within ± 5% of the weighed mass. Do not begin recycling operations until calibration procedures have been observed and approved. Do not operate outside th e parameters of the equipment calibration limits during recycling operations. Have readouts for the belt weighing device and computerized metering system that indicate the quantity in metric tons (tons) of recycled material and recycling agent being fed i nto the mixer at any given time. Provide totalizer readouts to allow determination of accumulative quantities of each constituent.
404.03.02 Pavers. Use a paver meeting the requirements of Subsection 401.03.03 and with a minimum power
of 127 kW (170 hp) t o place cold recycled mixtures to establish grade and cross slope.
404.03.03 Rollers. Provide a minimum of one pneumatic tired roller with an operating weight of at least
13.6 metric tons (15 tons) and not more than 18.1 metric tons (20 tons ). Provide a m inimum of one pneumatic tired roller with an operating weight of at least 22.7 metric tons (25 tons) and not more than 27.2 metric tons (3 0 tons ). Provide a minimum of two double drum vibratory steel wheeled rollers weighing at least 9.1 metric tons (10 to ns). Use rollers in good condition with an operational, working water system. Use a combination of steel wheeled, under static or vibratory mode, and pneumatic tired rollers to establish a rolling pattern with the appropriate combination of rollers and nu mber of passes that will provide maximum compaction without cracking the recycle mat. Do not compact outside the edge of the existing pavement width limits to prevent roadway spread.
404.03.04 Weather Limitations. Do not begin in -place recycling until pav ement surface temperature is 16 °C
(60 °F) and rising and the atmospheric temperature in the shade is 10 °C (50 °F) and rising. Do not begin in -place recycling if it is anticipated the atmospheric temperature will drop below 2 °C (35 °F) within 48 hours of mixing, or during stormy weather. Consider weather stormy when the rate of precipitation exceeds the rate of evaporation. Stop recycling operations a minimum of 3 hours before sunset to allow completion of initial compaction while surface temperature is 16 °C (60 °F) or above. If it rains on the recycled surface during the overlay operation, suspend the paving operation. The Engineer will take 3 randomly selected samples from the recycled surface to be overlaid a minimum of 2 hours after it rains. If the average moisture content of the samples is 2.0% or less as determined by Test Method No. Nev. T112, proceed with paving. If the average moisture content is greater than 2.0%, delay paving for a minimum of 72 hours or until the average moisture content fro m 3 more samples is 2.0% or less.
404.03.05 Repair of Failed Pavement Subgrade Areas. Repair failed pavement subgrade areas encountered
during the recycling operations as directed. Perform repairs before the limits of the failed areas increase in size. Work will be immediately suspended if the limits of the failed areas increase. When suspension occurs, repair the failed areas before any other operation proceeds. Working days will continue to be assessed during the suspension period. The repaired areas wil l be paid for according to Subsection 109.03. If the designated areas are not repaired before the areas increase in size, make repairs to the expanded failed pavement subgrade areas at no cost to the Department. Repair the failed pavement subgrade areas b y excavating to a depth of 450 mm (18 in.) and place a structural section of 300 mm (12 in.) of Type 1 Class B Aggregate Base and 150 mm (6 in.) of dense -graded plantmix bituminous surface. If dense graded plantmix is not available, place premixed bitumino us surfacing as a temporary patch until dense graded plantmix becomes available. Remove and replace the premixed bituminous surfac ing with dense graded plantmix.
404.03.06 Mixing. (a) Plantmixing Method. Mix the aggregate with the cutback asphalt at a cen tral mixing plant
according to Subsection 401.03.01. If the moisture content of the aggregate is 2% or less by mass of the dry aggregate, as determined by Test Method No. Nev. T112, mixing of the materials without passing the aggregate through a dryer will be permitted. Add mineral filler according to Subsection 401.03.08, Marination Method.
404.03.08 Surface Tolerances. The top surface of the completed recycled pavemen t will be tested with a
3.6 m (12 ft) straightedge parallel to, and perpendicular to, the centerline and shall not vary by more than 6 mm (1/4 in.) from the lower edge of the straightedge.
404.03.09 Conditions of Acceptance and Corrective Actions for Cold Recycle Mixture. Acceptance for
payment of the cold recycle will be by visual inspection of the mixture on the roadway following initial rolling and recompaction requirements. Correct any mixture not uniformly mixed or that ravels as follows:
404.03.10 Premixed Bituminous Paving Material. Clear the stockpile area of all brush, rubbish and
deleterious matte r. The premixed bituminous paving material is to be stockpiled at an exact location and in a manner as directed before the start of any cold recycling, roadbed modification, crack and seating or any other operation that may require the use of the premixed bituminous paving material to repair the surface. Place the premixed bituminous paving material, when directed, for making necessary repairs to the roadway surface. METHOD OF MEASUREMENT
404.04.01 Measurement. Recycled Bituminous Surface (depth) will b e measured by the square meter
(square yard). No measurement will be made for overlap at longitudinal joints. Lime (Cold Recycle) will be measured by the metric ton (dry ton). Bituminous material will be measured by the metric ton (ton). Emulsified asph alt (diluted) will be measured by the metric ton (ton) of diluted mixture. Sand blotter will be measured and paid for according to Section 407. Premixed bituminous paving material will be measured by the metric ton (ton) or cubic meter (cubic yard) of completed mixture of aggregate, mineral filler, and bituminous material in stockpile. Haul and place premixed bituminous paving material will be measured by the metric ton (ton), square meter (square yard) or cubic meter (cubic yard), of the completed mixtu re acceptably placed and compacted on the roadbed. When haul and place premixed bituminous paving material is to be measured by the force account basis, measurement will be made according to Subsection 109.03. BASIS OF PAYMENT
404.05.01 Payment. The accepted quantities, measured as provided above, will be paid for at the contract
price per unit of measurement for the pay items listed below that are shown in the proposal. Payment will be full compensation for the work prescribed in this Section. Payme nt will be made under: Pay Item Pay Unit Recycled Bituminous Surface (depth) ................................ ................................ ................................ .......... Square Meter (Square Yard) Lime (Cold Recycle) ................................ ................................ ................................ ................................ ........................ Metric Ton (Ton) Emulsified Asphalt (type) ................................ ................................ ................................ ................................ ................. Metric Ton (Ton) Cutback Asphalt (grade) ................................ ................................ ................................ ................................ .................. Metric Ton (Ton) Premixed Bituminous Paving Material ................................ ................................ ................... Metric Ton (Ton), Cubic Meter (Cubic Yard) Haul and Place Premixed Bituminous Paving Material ................................ ..................... Metric Ton (Ton), Square Meter (Square Yard), Cubic Meter (Cubic Yard), Force Account 173 SECTION 405 TACK COAT DESCRIPTION
405.01.01 General. This work consists of applying a bituminous material tack coat.
MATERIALS
405.02.01 Bituminous Material. The bituminous material shall conform to the applicable requirements of
Section 703. Emulsified asphalt for the tack coat shall be Emulsified Asphalt, Type SS -1h (Diluted); however, Emulsified Asphalt, Type SS -1 (Diluted), Emulsified Asphalt, Type CSS -1 (Diluted), Emulsified Asphalt, Type CSS -1h (Diluted) or Emulsified Asphalt, Type CQS -1nv (Diluted) may be substituted. Emulsified asphalt (diluted) shall be a mixture of 70% emulsified asphalt and 30% added water by mass. To accomplish this mixing, fill th e distributor partly with water, and then add the emulsified asphalt. Spray the remaining required water into the tank under pressure and then thoroughly circulate within the distributor. CONSTRUCTION
405.03.01 Equipment. Equipment for heating and applying the emulsified asphalt shall meet the following
requirements:
405.03.02 Weather Limitations. Do not apply emulsified asphalt when the surface to be treated is damp, wet,
when weather conditions are unsuitable, or when the atmospheric or surface temperature is below 4 °C (40 °F).
405.03.03 Preparation of Surface. Patch and clean the surface and remove any irregularities from the surface.
Clean the edges of existing pavements which are to be adjacent to new pavement. See Subsection 105.1 5.
405.03.04 Application of Bituminous Materials. Apply emulsified asphalt tack coat on surfaces to receive
paving and between all paving courses unless otherwise directed. The temperature of the emulsified asphalt shall conform to Subsection 406.03.04. Uniformly apply the emulsified asphalt to the surface, including any adjacent vertical edges. Apply the emulsified asphalt in such manner as to offer the least inconvenience to traffic and to permit one -way traffic without pickup or tracking of the bituminous material. Place the covering course over tack that is clean, free of tracking and adequately set. Do not apply more tack than can be covered in the same shift.