232.03 Seeding
232.01 Description
This work consists of preparing seedbeds, providing and planting seeds, and seeding for temporary and permanent erosion control.
232.02 Materials
Provide materials in accordance with the following subsections: Material: Subsection: Seed 735.03 Water 735.08
232.03 Equipment
232.04 Construction Methods
232.06 Seeding
232.05 Method of Measuremen T
The Resident Engineer will measure Seeding Method A , Seeding Method B , and Seeding Method C by the area seeded.
232.06 Basis of Payment
The Department will pay for each pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit:
233.01 Description
This work consists of providing, applying, and fastening mulching materials to the soil surfac e.
233.02 Materials
Provide materials in accordance with the following subsections: Material: Subsection: Vegetative Mulch 735.04 Excelsior Mat 735.04 Excelsior Mulch 735.04 Wood Cellulose Fiber 735.04 Mulch Fasteners 735.05
233.03 Equipment
Provide equipment in accordance with the following: