BASE COURSES

313SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, BASE COURSE

PA · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 216–0 Save this section

Ask about Section 313

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

CONSTRUCTION, BASE COURSE

313.1DESCRIPTION—This work is the standard construction of a plant-mixed asphalt base course on a

prepared surface using a volumetric mixture design developed with the Superpave Gyratory Compactor

(SGC)using prescribed manufactured additives, or plant process modifications or both.

313.2MATERIAL—Section 413.2

313.3CONSTRUCTION—Section 4 13.3 as specified for s tandard construction and with additions and

modifications as follows:

(b)Weather Limitations. Section 413.3(b). Replace with the following:

Do not place base course on prepared surfaces that are wet or if the temperature of the air or the prepared surface is 35F or lower. If work is halted because of weather conditions, the Representative may allow the Contractor to place limited quantities of base course that are en route to the project.

(h)Spreading and Finishing. Revise as follows:

1.b Spreading and Finishing. Add the following: If the indicated compacted depth of a Superpave 25.0 mm asphalt base course is more than 6 inches, place the asphalt base course in two or more layers of approximately equal compacted depth, with no layer less than 3 inches or more than 6 inches. If the indicated compacted depth of a Superpave 37.5 mm asphalt base course is more than 8 inches, place the asphalt base course in two or more layers of approximately equal compacted depth, with no layer less than 4 inches or more than 8 inches.

(l)Surface Tolerance. Replace the requirement for defective pavement with the following:

The pavement is defective if irregularities are more than 1/4 inch.

(m)Tests for Depth. Replace with the following:

Control the loose depth of each layer to construct the base course to the compacted depth indicated and within the specified tolerance. On the top lift and in the presence of the Inspector, drill full -depth cores at one random location selected by the Inspector according to PTM No. 1 in each 3,000 square yards of completed base course and at other locations the Inspector suspects are deficient. The Inspector will measure the depth of the full -depth cores according to PTM No. 737. Pavement deficient in depth by 1/2 inch or more and that cannot be satisfactorily corrected is defective. After the Inspector completes depth measurements, backfill, compact, and seal core holes with the mixture used to construct the course. Immediately start correcting courses or pavement that are deficient in depth at the core location and proceed longitudinally and transversely until the depth is less than 1/2 inch deficient of the design depth.

313.4MEASUREMENT AND PAYMENT—Section 413.4(a), with modifications as follows:

(a)Asphalt Mixtures (Standard). Revise as follows:
1.Asphalt Courses. Add the following:

1.f Superpave Asphalt Mixture Design, Base Course. Square Yard or Ton.

Get an email when 313 changes

Pennsylvania revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Publication 408 Highway Construction Specifications, 2026 Edition. Pages 216–0 of 1,522. View official source ↗

Ask about this section

Scoped to Pennsylvania Publication 408 — Specifications, Section 313 — SUPERPAVE ASPHALT MIXTURE DESIGN, STANDARD CONSTRUCTION, BASE COURSE. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.