722.01 801 SECTION 722 – FIELD OFFICE
722.01 Description ................................ ................................ ................... 801
722.02 Location ................................ ................................ ....................... 801
722.03 Minimum Spatial Requirements ................................ .................. 801
722.04 Other Requirements ................................ ................................ ..... 802
722.05 Outside Utilities ................................ ................................ ........... 802
722.06 Interior Utility Services ................................ ................................ 802
722.07 Doors and Windows ................................ ................................ ..... 803
722.08 Furnishings and Equipment ................................ ......................... 803
722.09 Concrete Cylinder Storage ................................ ........................... 805
722.10 Maintenance and Custodial Service ................................ ............. 805
722.11 Project Sign ................................ ................................ .................. 805
722.12 Basis of Pavement ................................ ................................ ........ 806
DESCRIPTION
722.01 Description
This work consist s of providing and maintaining an adequate, weatherproof field office for the exclusive use of the Engineer and Department staff during both the Contract period and for a maximum of 60 days thereafter. GENERAL REQUIREMENTS
722.02 Location
Locate the field office or materials laboratory on a site that is both satisfactory to the Engineer and convenient to the Project site.
722.03 Minimum Spatial Requirements
Unless otherwise specified in the Special Provisions, the Engineer ’s field office shall meet the minimum floor area and headroom requirements specified Table 722.03 -1. It shall contain a sufficient number of windows to provide at least 27 square feet of natural light. Existing building structures meeting these minimum requireme nts are acceptable. 722.04 802 Table 722.03-1: Field Office Spatial Requirements Building Type Width (feet) Length (feet) Headroom (feet) Windows Required Type 1 10 30 8 6 Type 2 12 50 8 10
722.04 Other Requirements
Arrange for and comply with all necessary local and State regulatory permits and inspections, including all costs associated therewith. Fully equip t he Engineer ’s field office and have it ready for occupancy at least 2 days before the start of actual construction operations. Protect the field office against fire, flooding, and theft throughout the 24 hours of every day the unit is in service. Assume responsibility for Department property housed in the field office that is lost due to theft, fire, or natural causes.
722.05 Outside Utilities
722.06 Interior Utility Services
722.07 Doors and Windows
Provide d oors of stock sizes and that have a key-in-knob lock of an approved manufacturer. Key all doors similarly. Provide operative windows except for picture windows. Operative wi ndows shall be either double hung or casement type equipped with adequate locks. Provide a ll windows with either shades or Venetian blinds. Provide adequate screens for a ll window openings. Provide frosted glass for w indows in sanitary areas.
722.08 Furnishings and Equipment
Provide the field office with the following:
722.10 Maintenance and Custodial Service
Provide the following maintenance and custodial services :
722.11 Project Sign
Equip the field office with a sign that identifies both the use of the structure and provides notice against trespassing. 722.12 806 COMPENS ATION
722.12 Basis of Pavement
The Department will pay for accepted quantities, complete in place, at the contract prices a s follows: Item Pay Unit Field Office (Type __ ) Lump Sum Such payment is full compensation for providing all that is specified in this 807 SECTION 730 – TRAFFIC SIGNALS
730.01 Description of Work ................................ ................................ .... 808
730.02 Regulations and Code ................................ ................................ .. 808
730.03 Submittal Data Requirements ................................ ...................... 809
730.04 Mill Test Reports and Certification ................................ .............. 810
730.05 Working Drawings ................................ ................................ ....... 811
730.06 Guarantee ................................ ................................ ..................... 811
730.07 Training ................................ ................................ ........................ 811
730.08 Excavating and Backfilling ................................ .......................... 812
730.09 Removing and Replacing Improvements ................................ ..... 813
730.10 Foundations ................................ ................................ .................. 813
730.11 Anchor Rods ................................ ................................ ................ 814
730.12 Pull Boxes ................................ ................................ .................... 814
730.13 Transformer Base ................................ ................................ ......... 815
730.14 Conduit ................................ ................................ ......................... 816
730.15 Conductors ................................ ................................ ................... 818
730.16 Cable ................................ ................................ ............................ 818
730.17 Wiring ................................ ................................ .......................... 819
730.18 Service Connection ................................ ................................ ...... 819
730.19 Sealant ................................ ................................ .......................... 819
730.20 Strand Cable ................................ ................................ ................. 819
730.21 Bond ing and Grounding ................................ ............................... 820
730.22 Field Test ................................ ................................ ..................... 820
730.23 Inspection ................................ ................................ ..................... 821
730.24 Signal Heads ................................ ................................ ................ 822
730.25 Controllers ................................ ................................ ................... 825
730.26 Cabi nets ................................ ................................ ....................... 827
730.27 Auxiliary Equipment for Traffic Signal Controllers .................... 834
730.28 Miscellaneous Traffic Signals ................................ ..................... 837
730.29 Detectors ................................ ................................ ...................... 845
730.30 Reserv ed ................................ ................................ ....................... 851
730.31 Reserved ................................ ................................ ....................... 851
730.32 Cantilever Signal Supports ................................ ........................... 851
FIELD OFFICE in other states
Get an email when 722 changes
Tennessee revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.